Subterranea Britannica is a society devoted to the study of man-made and man-used underground structures and the
archaeology of the Cold War. The main focus of interest is on abandoned and forgotten structures and in the case
of Cold War structures studies are entirely confined to declassified and decommissioned structures.
The society is open to all and its membership includes all walks of life. Members are invited to contribute to
this magazine even if this just means sending very welcome snippets from Newspapers and magazines.
Editor: Nick Catford 13 Highcroft Cottages London Road Swanley Kent BR8 8DB
e-mail Nick@Catford.fsbusiness.co.uk
Contents
News
Archaeology
2
Positively the last German tour!
23
Conservation & Heritage
2
Colonel Stephens' Light Railways and Tunnels _
.36
Defence & Military
5
Underground Darwin and the Second World War
37
Mines & Quarries
6
Ghost Metros of Belgium
39
Tunnels & Tunnelling
8
Malmo’s ‘Crossrail’
40
Publications
11
Another weekend on the London Underground
41
Miscellaneous
15
Sub Brit on Mendip
53
Features
Brompton Road Station
.55
Who’s Who in Sub-Brit
18
Possible Medieval Synagogue
63
Ty Croes Camp, Anglesey, North Wales
19
2008 Europe Study Weekend, Paris
.65
Armed Forces in East Germany
22
Dartford Tunnel Transport
.72
Front cover photo: The Greathead tunnelling shield left in place at Moorgate Station in 1904 when the Lothbury
extension of the Great Northern & City Line was abandoned.
Rear cover photo Top: Brompton Road Station on the Piccadilly Line of the London Underground closed in 1934,
the name can still be seen on the station tiling although it is hidden from passing trains by a brick wall.
Rear cover photo Bottom: The operations room in the 3rd Air Defence Division bunker in Kolkwitz.
The bunker was responsible for defending the southern air space of East Germany
during the later years of the cold war.
Pictures by Nick Catford
Honorary President: Prof. C. T. Shaw
Chairman: Martin Dixon
Vice Chairman: Linda Bartlett
Secretary: Roger Starling
Membership: Nick Catford
Treasurer: Sue Monsell
Editorial Team:
Editor of Subterranea: Nick Catford
Editorial Assistants: Martin Dixon & Linda Bartlett
Layout: Martin Snow Graphics: Tim Robinson
Proof Reading : Stewart Wild
Committee:
Linda Bartlett: Study Weekends & Admin Support
Martin Dixon: Study Weekends & French Trips
Brian Hillman: Day Conferences
Bob Templeman Paul W. Sowan M. C. Black
Ex Officio:
Gavin Saxby & Richard Lamont: Web site managers
Andrew Smith: Mailing Coordinator
Richard Lamont: Mailing List Manager
Hugh Ainsley: Net Admin
Newsletters of Subterranea Britannica are published by the committee of Subterranea Britannica. Original articles,
book reviews, press cuttings, extracts from books and journals, letters to the editor etc. are welcome.
However the editor reserves the right not to publish material without giving a reason.
The committee of Subterranea Britannica and the editor do not necessarily agree with
any views expressed and cannot check the accuracy of any material sent in.
Printed By Hillary Press Ltd. 75 Church Road Hendon London NW4 4DP
Telephone: (020) 8203 4508 Fax: (020) 8203 0671
Subterranea Britannica Limited Registered in England Registration No. 6447148
Registered Office: 5 Railway Cottages. Old Station Way, Bordon, Hampshire, GU35 9HH
Subterranea Britannica - 35 Years on and a Limited Company
Around 120 members attended the Spring Day Conference
at the Royal School of Mines, Imperial College, London,
on Saturday, 12 April 2008. Brian Hillman’s well-
balanced programme of splendidly delivered presentations
did not, I am sure, disappoint.
However, there were three short, business meetings before
the Conference proper could begin. The AGM of the
unincorporated Society was followed by an EGM
(Extraordinary General Meeting) of the same body, which
endorsed the proposal to incorporate the Society as a
Company limited by guarantee. This in turn was followed
by an EGM of Subterranea Britannica Limited to endorse
some cosmetic changes to our new Articles of Association
(which had been carried over without change from our
previous Constitution).
The Society, therefore, continues as Subterranea
Britannica Limited. The change was made to limit the
liability of all members to one pound only in the event of
Subterranea Britannica being wound up. Our
Constitution, as amended, is now in the form of a
Memorandum and Articles of Association as required by
the Companies Act. These documents will be circulated
in printed form in the next edition of the Members'
Handbook.
The Society goes ahead under new leadership, Martin
Dixon having taken over as Chairman, and Linda Bartlett
as Vice-Chairman. Paul Sowan and MC’ Black remain
on the Committee as ordinary Committee members. A
profile of Martin appears elsewhere in this edition of
Subterranea under ‘Who’s Who in Sub Brit’.
The feeling of the Committee is that ‘Subterranea
Britannica Limited' sounds a little over formal. A proposal
will be brought to an EGM on the same day as the next
Day Conference to revert to using the name Subterranea
Britannica (without the ‘Limited’). Regardless of whether
the proposal is carried, the status of our Society will
remain as a Company limited by guarantee and this status
needs to be reflected on all official documents and
communications. We are also examining the pros and cons
of seeking to become a Registered Charity; any proposal
will be brought before members at a future date.
( \
SUBTERRANEA BRITANNICA DIARY
Summary of Forthcoming Events
Sub Brit specific events
Saturday 20 September - Open day at Paddock (northwest London)
Saturday October 11 2008 - Autumn Day Conference at Bucks University, High Wycombe
December 2008
“Subterranea” 18 published ** Copy deadline 15 November **
General events
11-14 September 2008 Heritage Open Days
19-21 September 2008 S.F.E.S Conference - France
20-21 September 2008 London Open House
26 - 28 September 2008 - Hidden Earth, OTLEY, West Yorkshire
29 - 30 September, 6 - 7 & 20 - 21 October
Open days at Honeckcr’s bunker near Berlin
J
V
News - Archaeology
INVESTIGATION OF COLLIERY SITES AY
MIDDLETON PARK, LEEDS, YORKSHIRE
A community archaeology project extending over two
winters has been devoted to an examination of Middleton
Park, Leeds. There are over 270 known colliery shaft
locations, with at least six different styles of coal-mining
represented, dating from the 17th to the 20th centuries.
A number of shafts were worked using ‘cog and rung’
horse gins, and there is evidence suggesting a steam engine
in 1814. There are also significant remains of
waggonways dating from 1758.
Further details maybe found at the Friends of Middleton
Park’s website www.fomp.co.uk.
SOURCE: Martin ROE, 2008, Middleton Park, Leeds.
Newsletter Northern Mine Research Society , May 2008,
page 8.
FURTHER THOUGHTS ON ROYSTON CAVE,
HERTFORDSHIRE
Royston, a small Hertfordshire town on the Cambridge
border, and its ‘cave’ (a Scheduled Ancient Monument)
is of more than usual interest to Subterranea Britannica
members. It is where Subterranea Britannica started,
under the direction of our Founder and Honorary Member
Sylvia Beamon. Indeed, in our early days, we were once
informally referred to as the ‘Royston Caving Club!’
A short article in a recent issue of Local History News
reviews some results of searching the Web for information
on this cylindrical subterranean excavation with walls
decorated with religious (Christian) carvings. The author
notes that, according to various websites, this cave is the
‘best kept secret in the UK,’ is an ‘underground temple
erected [sic] by theTemplars’(howdoyou erect a cavity?),
‘may hold the key to the Holy Grail’, and ‘is only
comparable to a cave in the Czech Republic.’ Your
reviewer, having visited Sloup Castle and its rock-cut
cave, can vouch for this last claim.
Joanna Mattingley notes previously published accounts
of archaeological and historical research, and speculation,
by (notably, amongst others) Sylvia Beamon. Joanna goes
on to suggest that the excavation may have been
commenced as a chalk or flint mine, and was subsequently
used as a prison during which time (perhaps the 1480s)
the walls were (she suggests) carved. Similar carvings
at Carlisle are noted.
The ‘cave’ is below one of the main roads near Royston’s
central crossroads, where Ermine Street crosses the
Icknield Way. When rediscovered in 1742, it had only an
awkward vertical shaft entrance through the ceiling, which
makes it sound rather more like a chalk or flint mine than
a chapel. As a prison it would be decidedly difficult to
escape from. A separate entrance via a steep flight of
rock-cut steps had been provided by the 1790s. My own
recollection of several visits some years ago is that bands
of flints are not conspicuous in the walls; and that there
is an old chalk wall associated with the nearby church
(chalk, from below the frost-shattered surface layers, was
often quarried underground for use as a building-stone).
Of course, we may never know why this excavation was
made, but can do no more than examine and assess the
evidence and theories.
SOURCE: Joanna MATTINGLEY, 2007, Tradition
versus history - Royston Cave revisited. Local History
News 85, 16- 17.
News - Conservation, Heritage & Tourism
SOUTH CROFTY TIN MINE TO REOPEN,
CORNWALL
When South Crofty mine closed in 1998, tin sold at $6,000
per tonne. The market price is now $ 17,000, as a result
of strong demand from China’s electronics industry,
especially for the manufacture of mobile telephones. The
reopened mine is expected to employ up to 400 persons.
However, it is suggested that the price of tin could fall
again if demand for consumables drops as a result of
possible recession in the USA economy.
SOURCE: Marianne BARRIEAUX, 2007,
Can tin mining revive Cornish fortunes? The Guardian,
1 December 2007, page 48.
DEVELOPMENTS AT JOSEPH WILLIAMSON’S
TUNNELS AT EDGE HILL IN LIVERPOOL
The Friends of Williamson’s Tunnels (FoWT) trace their
origins from 1995, when Steve Moran and Dave Head
formed what was at first named the Friends of
Williamson’s Follies. The group was renamed the
following year, launched a website in 1997
(www.williamsontunnels.com), and is dedicated to
exploring and securing access to the enigmatic tunnels
made in the local red sandstone either side of Mason
Street, between Edge Hill and the city centre. Curiously,
it is one of two such societies in the city, the other being
the Joseph Williamson Society (JWS).
Williamson, for reasons best known to himself, caused
to be excavated a number of apparently purposeless
tunnels and underground rooms below his house in Mason
Street and adjoining land. During his later years (he died
in 1841) two railway tunnels were made below Mason
Street - one of 2,111 yards opened in 1828 to serve
Liverpool’s Wapping Goods Station, the other of 2028
yards in 1836 to serve the City’s new terminus at Lime
Street (replacing the less central earlier Crown Street
Station). The Lime Street tunnel was substantially
unroofed in the 1880s, so is now in large part the vertical¬
sided rock open cutting familiar to all who have travelled
to or from the terminus.
The two societies’ activities are focused on three sites at
which access to the tunnels is currently possible. To what
extent, if at all, these three sets of tunnels were originally
interlinked below ground is not at present clear. After
Williamson’s death, his tunnels appear to have been used
2
as convenient places in which to dispose of household
refuse, ashes, and rubble from demolished buildings.
The Corporation Stables site, Smithdown Lane
This site lies between Mason Street and Smithdown Lane,
the latter running at a lower level than the former. It is
bounded on the south side by Grinfield Street, and on the
north side by the Lime Street railway cutting. The
southern end of the site has now been partially developed
with modem housing, although an area (below which a
particularly impressive but not yet re-accessed tunnel is
thought to run) remains undeveloped. Within this site
the Joseph Williamson Society have established a
Williamson Tunnels Heritage Centre by erecting a glass
screen across the end of one large though short open
tunnel; this space contains a bar / cafe counter and was
the meeting place used by the Friends of Williamson’s
Tunnels when they hosted a memorable International
Conference in Liverpool in 2002. Adjoining this space is
a small display area, beyond which visitors can walk
through a neighbouring smaller but longer tunnel into
the cliff, beyond daylight penetration, and re-emerge in
the glass-fronted meeting room. Members of the two
societies worked jointly on the excavation of this through
route.
Williamson’s House, Mason Street
Little more than parts of the front and side walls survive
of Williamson’s house on the City side of Mason Street,
the interior being a derelict plot of land, formerly the
ground floor. Within this area are two or three holes
communicating with parts of the tunnels, including an
impressive rock-cut ‘banqueting hall’ and a former cellar.
The Friends have been allowed by the City Council, who
own the site, to arrange access for interested persons from
time to time, and indeed Subterranea Britannica members
visited during the Liverpool Study Weekend in 1999.
Liverpool City Council have indicated their refusal to
deal with two separate organisations in connection with
access to or development of this site, and the two bodies
(both registered charities) have now signed a formal
agreement to collaborate with each other more closely,
possibly leading to amalgamation. Tunnels possibly
extend below the former back garden of the house, now
shortened by the making and subsequent opening-out of
the Lime Street tunnel and cutting. On the Edge Hill side
of Mason Street, two houses have displayed signs of
subsidence and are being demolished. Further tunnelling
is now known to have taken place here as well, as a ten
feet long length of tunnel (walled-up at each end) has
now been found. In 1832 it is recorded that Williamson
operated a quarry here.
Paddington
Paddington appears to have been a once-continuous street
running past the north ends of Smithdown Lane and
Mason Street, but is now in two parts as a result of its
central portion now forming the site of the Archbishop
Blanch High School. The Friends’ site is at the upper
end of Paddington, where it meets Highgate Street. A
lease has now been taken on a small area of land otherwise
occupied by Liberty Living PLC, and the Friends have
secured planning permission for their work, installed
mains electricity, and are now preparing to continue the
excavation of many tons of rubble from tunnels at present
known to exist on three levels. Members of the Friends
have undertaken training for working in a ‘low risk
confined space’ under the 1997 Confined Space
Regulations, as well as first-aid training.
SOURCE: FRIENDS OF WILLI AMSON’S TUNNELS.
2008, The Mole 18: 16 pages.
DRAFT HERITAGE PROTECTION BILL
IMPROVES PROTECTION OF UNDERGROUND
SPACE
A draft Heritage Protection Bill has been presented to
Parliament, ‘to make provision about the protection of
heritage’ with reference to England and Wales, and to
English and Welsh waters. Cultural heritage, rather than
the country’s natural heritage, is meant. If in due course
enacted, this will replace the provisions of the Planning
(Listed Buildings and Conservation Areas) Act 1990;
the Historic Buildings and Ancient Monuments Act 1953;
the Ancient Monuments and Archaeological Areas Act
1979; and the Protection of Wrecks Act 1973.
The intention is to bring the statutory protection of
‘heritage structures’, ‘heritage open spaces’. World
Heritage Sites, and 'marine heritage sites' into a single
cohesive framework. At present, insofar as ‘heritage
structures’ are concerned, we have Ancient Monuments,
and we have three tiers of ‘Buildings’ listed as of
architectural or historical interest. A building Listed as
Grade 1 is reckoned to be of equivalent worth to a
Scheduled Ancient Monument.
An aspect of especial interest to Subterranea Britannica
is that, ever since the first Ancient Monuments Act in the
1880s, any cave or excavation can be Scheduled.
However, as you cannot ‘build’ a hole in the ground, a
cave or excavation cannot be Listed unless, for example,
it has a ‘built’ element such as masonry tunnel portals or
linings. A number of tunnel portals are certainly Listed,
as is the entire length of Brunei’s Thames Tunnel.
Currently, a number of objects are both Scheduled and
Listed.
Under the proposed new Act. this anomaly is to be
removed. A ‘registrable’ heritage structure could be (a)
a building or other structure; (b) an earthwork, field
system or other work; (c) a part of a building ... ; (d) a
cave or excavation; (e) a site comprising the remains of
anything within any of paragraphs (a) to (d); etc.
The Bill also includes ‘registrable open spaces’ such as
gardens or parks, and battlefields; World Heritage Sites
3
(some of which it may be noted are of ‘natural’ rather
than ‘cultural’ interest); and marine sites such as
shipwrecks.
The greater part of the lengthy text spells out in
considerable detail the intended mechanics of registration,
appeals against registration, alterations to and deletions
from the register, and applications for consent to work at
or on a ‘heritage structure, open space, etc.', consultation
requirements, penalties for failure to adhere to the terms
and conditions set out, and so forth. The relevant
‘Heritage Authorities’are English Heritage (in England)
and the Welsh Minister (in Wales.) The Bill does not
extend to Scotland or Northern Ireland.
The text of the Bill is in pages 1-128, with explanatory
notes in pages 131 - 192.
DETAILS: DEPARTMENT OF CULTURE, MEDIA
AND SPORT, 2008, Draft heritage protection hill, April
2008. DCMS: (1) + (1) + xi + 192pp [ISBN 978-0-10-
173492-9]
BESTWOOD WINDING ENGINE HOUSE,
BESTWOOD COUNTRY PARK,
NOTTINGHAMSHIRE
A Grade II Listed Victorian colliery winding engine house
at Bestwood Country Park is being converted into a new
visitor attraction. The £2m scheme includes a glass-sided
lift to take visitors to a high-level viewing gallery from
which the twin-cylinder vertical engine can be admired,
as well as views over the park. A nearby former dynamo
house is to become a visitor centre.
SOURCE: Group Travel Organiser , May 2008, page 8.
HARD ROCK MUSEUM TO OPEN AT GEEVOR
MINE, CORNWALL
The ‘Hard Rock Museum’ is due to open in an original
mine building at the Geevor tin mine, Cornwall, at the
end of July 2008. This will tell the story of the Geevor
mine, and of Cornish mining in general. Objects, static
and interactive displays, restored mine buildings, and
computer terminals giving access to a searchable database
are intended to be features. The database is intended to
grow, and material for inclusion is sought. Contact: Bill
Lakin at pch@geevor.com.
SOURCE: ANON, 2008, A mine of information.
Geologists Association Magazine 7(2), page 21.
TEMPELHOF AIRPORT DEBATE, BERLIN,
GERMANY
The site of Tempelhof Airport, Berlin, has been used for
aviation since 1909, in which year aviator Orville Wright
made a demonstration flight there. The terminal buildings
were commenced in 1923, making them the world’s
second-oldest commercial airport still in operation. In
1934 the architect Ernst Sagebiel was commissioned by
the Nazis to build a mile-long terminal in limestone, said
to be the world’s third largest building after the Pentagon
and Ceausescu's People’s Palace. A third of it, reportedly,
has never been used. During the Soviet blockade
commencing in 1948, the Berlin Airlift kept West Berlin
supplied with food and fuel via Tempelhof. At times, a
supply aircraft landed every 90 seconds. Not surprisingly,
the complex has its own bunkers.
Currently, the terminal hosts flights to ‘a handful of
obscure destinations,’ with most international journeys
taking off from or landing at Berlin’s Tegel or Schoenefeld
Airports. And a new airport, Berlin-Brandenburg, is
under construction. The city authorities propose to close
both Tegel and Tempelhof, to allow the full development
of the new terminal. A referendum was organised for 27
April 2008 to allow Berliners to vote for or against the
continuing existence and operation of the historic airport,
despite its high running costs. Sadly for the
preservationists, insufficient people voted for the result
to be accepted as valid. Nevertheless, it was reported
that the majority of the 530,231 votes cast were in favour
of retention.
SOURCE: Kate CONNOLLY, 2008, Berliners battle to
save vast airport that kept the city from starvation. The
Guardian, 26 April 2008, page 25; and ANON, 2008,
Referendum fails to save Tempelhof airport. The
Guardian, 28 April 2008, page 22.
ADOLF HITLER’S BUNKER RECREATED IN
BERLIN, GERMANY
A German equivalent of Madame Tussauds has opened
in Berlin. A wax effigy of the dictator, presented as in
his final days underground in the Fiihrerbunker, is to be
found along with 74 other famous Germans and others,
including Albert Einstein, Ludwig van Beethoven, Johann
Sebastian Bach and ‘an array of writers, artists, and TV
personalities.’
SOURCE: Kate CONNOLLY, 2008, Back in the bunker:
Hitler returns to Berlin, worried, downtrodden, under
guard - and made of wax. The Guardian, 4 July 2008,
page 24.
A MINE VISIT IN JOHANNESBURG, SOUTH
AFRICA
When in Johannesburg, pay a visit to the Standard Bank
in Simmonds Street. A lift inside can take you down to
visit a ‘beautifully preserved access tunnel or stope’ in
one of the city’s earliest gold mines, believed to date from
the 1880s - 1890s. It was rediscovered in 1986 during
construction of the bank above, and has been incorporated,
along with a museum display occupying some 70 square
metres. This visit is reportedly open free of charge seven
days a week.
SOURCE: Colin PROSSER, 2008, Sitting on a gold
mine. Geology Today 24(2), 53 - 54.
4
MIEDZYRZECZ FORTIFIED FRONT
(NIETOPEREK BAT RESERVE), WESTERN
POLAND
Member Simon Mickleburgh, a bat specialist, lias
described the 32 km tunnel system forming the
Miedzyrzecz Fortified Front (MFF) built by Germany
from Spring 1936 onwards to guard the then border with
Poland. A total length of 35 km of tunnels, including an
underground railway system, had been planned, linking
a series of surface fortified bunkers. As Germany invaded
Poland on 1 September 1939, its frontier fortifications
were left in the rear of the advancing forces, and were
not to serve any defensive purpose until the tide of World
War II had changed, and the MFF was manned in the
hope of holding back the advancing Soviet Army. The
Front, reached by the Russians on 29 January 1945, held
for only three days, and the conquerors went on to Berlin.
The war in Europe ended on 8 May 1945. As a result of
the Potsdam Conference in May the same year, the
German-Polish border was redefined as following the
Odra and Nysa rivers, generally known in the west as the
Oder-Neisse Line. This left the MFF, as it remains, in
western Poland instead of eastern Germany. Poland
however, having gained a part of former Germany, lost
territory in the east to Belarus and Ukraine.
The post-war Polish Army acquired the MFF in 1953,
but left in 1957, being replaced by a Soviet military base
at the northern end until 1994. Anything of any value in
the tunnels was stripped out. Plans in 1985 to use the
tunnels to dispose of radioactive waste were dropped in
1988.
On 11 August 1980 about a third of the tunnel system
was declared a nature reserve (Nietoperek) for hibernating
bats. The remainder, with 48 hectares of surface land,
was similarly scheduled (Nietoperek II) in December
1998. This site is amongst the most important bat
hibernation sites in Europe, with 12 species recorded and
up to 37,000 bats counted.
SOURCE: Simon MICKLEBURGH, 2008, Nietoperek
built for conflict but perfect for bats. Rat News 85, 6-7.
MINERAL EXTRACTION AND THE HISTORIC
ENVIRONMENT
English Heritage have published a statement on this topic,
an A4 booklet available without charge from English
Heritage Customer Services Department (T) 0870-333-
1181 or Email customers@english-heritage.org.uk citing
product code 51396.
A welcome feature of this statement is that English
Heritage recognises that historic mine and quarry sites,
at the surface of the ground or underground, may
constitute a valuable archaeological resource in
themselves. Encouragingly, the booklet includes a
diagram of the Grimes Graves Hint mines, and a
photograph of a group of ten or so persons wearing
overalls and helmets appropriate for an underground visit.
DETAILS: ENGLISH HERITAGE, 2008, Mineral
extraction and the historic environment. English
Heritage: 19pp.
News - Defence & Military
PLANNING APPLICATION TO DEMOLISH RAF
CHENIES ROTOR RADAR STATION
A planning application has been submitted to Dacorum
Borough Council in Hemel Hempstead to allow the
demolition of the Rotor Radar station at RAF Chenies in
Buckinghamshire. The application includes clearance of
the site, construction of a dwelling, garages and stable
and reversion of land to agriculture & paddocks.
The prefabricated R8 operations block is the only example
still standing but is not eligible for listing as it is classed
as a temporary building.
The building was last used by the RAF in the mid 1990s
and was listed for disposal in 2004. In recent years it has
suffered some vandaslism.
SOURCE: Planning application fixed to the gate.
NORWICH ROC GROUP HEADQUARTERS
DEMOLISHED
Demolition of the Norwich ROC Group HQ started in
July 2008 and was completed within a few days. The
contractors were instructed to raze the building to ground
level with all the rubble being pushed into the remaining
underground rooms. Nothing was removed from the
bunker before demolition started.
The contractors allowed a small party into the bunker to
take photographs during the early stages of the demolition.
The bunker was demolished despite no planning
permission to develop the site. The owner chose to
demolish quickly because of a local campaign to save the
building which was getting a lot of support.
In the last 10 years a number of planning applications to
develop this prime site on the Norwich ring road have
been turned down. These have included a fast food outlet.
SOURCE: Local observation.
WEHRMACHT BUNKER FOUND ON DANISH
BEACH
A Wehrmacht bunker has been found under the beach on
the North Sea coast of Denmark. It was undamaged and
contained furniture and remains of uniforms. In contrast
to the end of the German Reich in Berlin, life along the
Danish coast had been totally different: “no enemy
contact, occasionally a fishing boat towed out a target to
sea so that we could practise firing ", according to a former
soldier who served in the bunker to the end.
Some 2,000 bunkers were built along the Danish coast
as part of the Atlantic Wall defence system. The bunker,
near Ringkobing, only came to light a few weeks ago.
Drift sand must have covered it shortly after the war,
according to the local museum head. It’s the best example
of a bunker yet found in Denmark. The bunker, type
“Regelbunker (Standard design) 501", is some 20 sq
metres in area and housed 10 soldiers. The walls are 2
metres thick. In the bunker there was a boot under the
bed, a spanner was lying on the table, together with parts
of a telephone which had been dismantled. There were
also bottles of ink, remains of uniforms and postage
stamps lying under sand.
The Germans capitulated in Denmark on 5 May, 1945,
and the soldiers in the bunker had to leave within three
days. The five 10.5cm guns of the 5/180 coastal battery
had to be left behind; the soldiers were only able to take
their personal weapons and kit with them. A possible stonn
caused water to enter the bunker to a depth of one metre,
and the people discovering the bunker had to wade through
a 20 - 25 cm deep mixture of salt water, sand and mud.
The furniture and metal objects in the bunker have all
rotted away or are rusty
Some 8,000 bunkers made up the Atlantic Wall, which
was built between 1942 and 1944 over a length of just
under 2700 km of coastline. The Wall only had limited
value due to its lack of defences in depth.
SOURCE; Der Spiegel 1.7.2008.
RHYDYMWYN IN PEACE, FLINTSHIRE
The World War II Government site at Rhydymwyn, so
secret that it was the only secret site never located by
German intelligence, has a new lease of life as a closed
nature reserve, managed by DEFRA in collaboration with
NE W'ales Wildlife. Tunnelled storage, commenced in
1938, was used for keeping stocks of mustard gas. And
from 1942 - 44 experimental work was carried on in
connection with uranium-235 isotope enrichment.
Decommissioning of the 35 hectare site commenced in
1959. A recent visit report, by the Botanical Society of
the British Isles, reports no rare species, but an impressive
species diversity.
SOURCE: Joe PHILLIPS and Delyth WILLIAMS, 2008,
Rhydymwyn Valley Nature Reserve, Flintshire (v.c. 51),
9 ,h June. Botanical Society 1 of the British Isles News 108,
page 60-61.
USA NUCLEAR WARHEADS REPORTEDLY
REMOVED FROM RAF LAKENHEATH,
SUFFOLK
Evidence has been published which suggests that the USA
has, quite possibly some years ago, removed the last 110
‘free fall’ nuclear weapons from English soil, where some
have been stored during the last 54 years. ‘Gravity’ or
‘free-fall’ delivery from over-flying aircraft is presumably
outmoded by the inter-continental ballistic missile, and
by firing from submarines. A USAF document on
inspections of US nuclear sites, released in January 2007,
includes a note stating ‘not applicable to Lakenheath.’
Further information is reportedly at http://www.fas.org/
blog/ssp/.
Britain’s nuclear weapons are designed and built at
Aldermaston and maintained at Burghfield (both near
Reading) but operationally based in anti-nuclear Scotland!
Neither the British nor the US governments comment on
the whereabouts or transportation of nuclear weapons.
SOURCE: Julian BORGER, 2008, US removes its
nuclear arms from Britain. The Guardian , 26 June 2008,
page 12; Ian DAVIS, 2008, Nuke-free England. The
Guardian, 27 June 2008, page 37.
News - Mines & Quarries
ELM PARK UNDERGROUND BUILDING-
STONE QUARRY, GASTARD, CORSHAM,
WILTSHIRE
Elm Park mine (ST 885683) at Gastard, near Corsham,
commenced quarrying dimension stone underground in
the early 1920s, this work continuing until 1936 when it
was requisitioned for RAF storage purposes. There were
attempts to secure and activate planning permission for
the recommencement of quarrying in 1988 and 1990, and
eventually permission was granted in 1997 time-limited
to 31 December 2003. In November that year, planning
pennission was extended to 31 May 2010. Since 1997
the operation has changed hands ‘at least three times’,
the current operators being Wessex Dimensional Stone
Ltd, who also quarry stone underground at Chilmark,
near Tisbury. At some point since 1997, the quarrying
has been extended beyond the pennittcd area. Local
residents have complained about noise from the
underground quarrying affecting their enjoyment of their
homes (sound carries well through solid rock.)
The underground quarry, to which access is gained via a
slope-shaft, has an area of 2.3 hectares, and lies 20 to 30
metres below ground level.
Consideration is being given to changing working
methods, to alleviate the sound problem, and to an
application for retrospective planning permission for the
area worked beyond the originally permitted limit.
Current proposals are to quarry a further 47,024 tonnes
of stone over the next 15 years, the material to be brought
to surface by fork lift truck for onward transportation by
flat-bed lorry. The current planning pennission allows
an extraction ratio of 60% (leaving 40% of the stone
unworked in roof-support pillars), with roadways no
wider than 4.88 metres, and pillars 6.1 in x 12.8m.
Application is being made for permission to drive
roadways up to six metres wide, with nine metre square
pillars allowing a floor to ceiling height of nine metres,
representing an extraction ratio of 64%. Roof-bolting is
envisaged. Some doubt has been cast on the acceptability
of the plans.
SOURCE: ANON, 2008, Elm Park mine. Mineral
Planning 116 (April 2008), page 12.
6
TWO APPARENTLY HITHERTO UNRECORDED
PRESUMED OIL SHALE MINE DRIFTS NEAR
WEST CALDER, WEST LOTHIAN
Access via roof-falls has been reported to two mine drifts,
assumed to be parts of a former oil shale mine, about
four kilometres south of West Calder. Two abandoned
brick buildings with concrete roofs stand nearby, and may
have been functionally associated with the tunnels. The
original drift portals are bricked up.
The northern drift is of rectangular cross-section, dipping
downwards at about 15°. A line of steel rails is bolted to
the concrete floor. The similar southern drift is wider,
and has two sets of rails, with some surviving points at
the up-dip end, and numbered refuge alcoves in the walls
every 10 metres or so. After some 40 metres the tunnel is
of unlined rock-cut construction. Fragments of un¬
processed shale and coal are reported. The lower end of
the drifts are flooded or blocked by debris including a
dead sheep.
The mine apparently is not one already identified as a
recorded named site, such as Baads or West Mains Mine.
SOURCE: Roger GALLOWAY, 2008, Meet report -
an unknown mine. Bull. Grampian Speleological
Group , 4 th Series, 3(4), page 12.
SALT MINE GROUND STABILISATION AT
NORTHWICH, CHESHIRE
Four brine-filled abandoned salt mines at Northwich have
been filled, safeguarding 32 hectares of land in and around
the town formerly at risk of subsidence. Grout made
from pulverised fuel ash from coal-fired power stations
mixed with saturated brine was used. The filling project
has been awarded the Institution of Civil Engineers’ North
West Merit Award for 2008, and the Ground Engineering
Stability Award for the same year. Support pillars of rock-
salt left in situ during the active life of the mines had,
subsequent to their abandonment, been dissolved away
by surface water which had got into the mined cavities
via the old access and winding shafts. Saturated brine
was used in the grout as, of course, this would be unable
to dissolve any more rock salt.
SOURCE: ANON, 2008, Pioneering mine filling plan
wins new honours. Weekly Guardian [Cheshire], 19
March 2008, page 9.
BATH STONE QUARRIES, COMBE DOWN,
BATH
The 18th century underground building-stone quarries at
Combe Down, at the top of the hills to the south of Bath,
are being almost completely filled with foamed concrete.
Some very limited access is being retained, with massive
steel supports, to allow for hibernating bats, and to
preserve an ‘archaeological sample’ of the quarry.
SOURCE: Alan GRAY, 2008, Some serious shoring.
Descent 201, page 11.
COMMERCIAL GOLD MINING TO
COMMENCE AT TYNDRUM, SCOTLAND
An Australian company, Scotgold, has purchased the
Cononich mine near Tyndrum, about 40 miles north of
Glasgow, where they have a licence to extract gold from
an area of 2,700 square kilometres of land. This is likely
to mean the crushing and screening of vast quantities of
rock which will presumably be left behind after the minute
gold content has been removed.
SOURCE: ANON, 2008, Mining news. Descent 201,
page 8.
ROKHAGI COAL MINE, SUAUROY, FAROE
ISLANDS
Unlike well-documented Iceland, the similarly almost entirely
volcanic (albeit long-since extinct) Faroe Islands had little
on the way of an overall single publication on the
archipelago’s geology until Joannes Rasmussen and Arne
Noe-Nygaard’s Geology< of the Faeroe Islands publ ished in
1970 as Dan marks Geologiske Undersogel.se, I s1 Series,
number 25.
The search for winnable oil has extended from offshore
sedimentary rocks to submarine volcanics, including the
much-fractured basalts of the Brito-Arctic Province
extending from the Hebrides and Northern Ireland, via
Rockall, the Faroes and Iceland, to Greenland. Oil and gas
were found in inter-basaltic sandstones in the Faroe-Shetland
Basin in 2004. The Joannes Rasmussen Conference, named
in honour of the co-author of the above-mentioned
publication, was held recently in Torshavn (capital of the
Faroes) and included field excursions on some of the 17 or
so inhabited islands in the group.
Of particular interest was an underground visit to the
abandoned Rokhagi coal mine adit (reputedly negotiable for
some 200 metres) in a mountainside on the largest of the
southern islands, Suduroy. Two photographs of the mine
portal published in the report cited here indicate a comfortable
standing-height tunnel around 1.5 metres wide, with a single
narrow-gauge railway track. Although mining is known to
have been commenced in the 18 th century, and there have
been studies of resources from time to time, it is thought that
the working here has been inactive for some decades at least.
Perhaps, as with similar lignite beds between lava flows in
Iceland, it was in production primarily during the First and/
or Second World Wars, when importation of coal was
problematic. Neither the Faroese nor the Icelandic coal seams
outcrop in areas well served by road links or harbours. This
coal is, of course, not of Carboniferous Age, but dates only
from the Eocene. Jurassic coal was worked until quite
recently at Brora, in Scotland. And other coal younger than
the Carboniferous is still worked by a Russian concern on
Svalbard (Spitzbergen) by agreement with Norway.
SOURCE: Simon PASSEY, 2008, Basalt and the bits in
between... Geoscientist 18(4), 18-23.
7
IMPORTANT MANUSCRIPT MAP OF
18 ,8,h CENTURY MINING RIGHTS IN
SWALEDALE, NORTH YORKSHIRE
The Northern Mine Research Society has, with others,
contributed towards the purchase price (£1,000) of a
unique coloured map, dated 1707, showing lead mining
rights on Grinton How in Swaledale. The map, now in
the North Yorkshire County Records Office, was created
in connection with a court case about mining rights
instigated in 1705. Apart from its mining history interest,
this is the earliest known detailed map of the Dale. An
exact copy has been made and presented to the Swaledale
Museum.
SOURCE: Alan MILLS, 2008, Preserved for posterity
- the Society helps the North Yorkshire County
Records Office purchase a map. Newsletter Northern
Mine Research Society, May 2008, 6-7.
News - Tunnels & Tunnelling
HISTORIC RAILWAY TUNNEL SHAFTS
DEMOLISHED
Network Rail has capped and demolished four brick
ventilation shafts running along the Prince of Wales
Tunnel in Shildon, Co. Durham. Although believed to
have been rebuilt early in the tunnel’s life, the shafts were
originally sunk when the tunnel, which is still used today,
was built in the 1840s.
SOURCE Northern Echo 10.4.2008
DISUSED RAILWAY TUNNEL TO BE
CONVERTED INTO UNDERGROUND
HOSPITAL
Disused railway tunnels under Lord’s cricket ground are set
to be converted into London’s first underground hospital.
The Wellington Hospital is in talks with the MCC to create
a £ 100 million subterranean care centre that would house
a suite of operating theatres, intensive care facilities and hi-
tech scanning equipment three storeys down. The Victorian
tunnels which were adjacent to the Great Central Line north
of Marylebone. They are on the down side of the line which
is not underground and were used for stabling empty carriage
stock
They would be part of the existing hospital, which is already
Europe’s largest private healthcare facility. Plans are also
being drawn up to build a world-class sports medical centre
as part of a £200 million redevelopment of Lord’s. The
Wellington is in discussions with the Rifkind Levy
Partnership which leases the tunnels from Network Rail,
and the MCC, which owns the top 18 inches of ground.
Other proposals for the tunnels include an entertainment
complex and a Lord’s cricket academy.
Subterranea Britannica was called in to investigate the tunnels
in c.1998 when contractors broke into the tunnels while
extending the Wellington Hospital’s underground carpark.
SOURCE: Evening Standard.
HOUSE UNDERMINED BY TUNNELLING
ENTHUSIAST, HACKNEY, LONDON
William Lyttle (77), a retired engineer, has been ordered
to pay almost £300,000 for stabilisation works at his home
in Hackney where, for 40 years, he has been burrowing
underneath the 20-room Victorian house and adjoining
land. He was evicted from the property in 2006 to allow
engineers to stabilise the building, adjoining property, and
the pavement at the front.
SOURCE: Lara DEAUVILLE, 2008. Pensioner ordered to
pay up for digging under his home: Mole man is £293k in
the hole. The London Paper, 15 April 2008, page 4.
NATIONAL GRID CABLE TUNNEL, LONDON
BOROUGH OF CROYDON
Work continues steadily on the National Power electricity
cable tunnel being driven from east to west below the entire
width of the London Borough of Croydon. It is to take a
replacement for a 275 kv subsurface cable, with provision
for additional capacity if or when required.
The tunnel, entirely in Upper Chalk, commences on the LB
Bromley border near New Addington, with a spoil extraction
shaft near the junction of Kent Gate Way (A 2022) and Gravel
Hill (A212). There is another shaft beside the Croydon
Tramlink stop at Lloyd Park, on Coonibe Road (A212), and
a final one on the LB Sutton border in the Beddington /
Waddon area near the site of the former Croydon B Power
Station (of which only the chimneys survive, next to the
IKEA premises on Purley Way (A23). Tunnelling towards
New Addington and beyond (eastwards) is completed, and
westwards towards Lloyd Park was (early in 2008) due to
start ‘very soon' with completion to that point expected in
June / July 2008 and the final length towards Beddington
due to be completed by November 2008.
SOURCE: Sara BASHFORD, etal., 2007, National Grid.
Selsdon Gazette 60(671), page 8; Sara BASHFORD, Phil
THOMAS, and Dudley MEAD, 2008, National Grid
Croydon Cable Tunnel Project. Selsdon Gazette 60(680),
page 8.
SPRINKLER SYSTEM FOR THE DARTFORD
TUNNELS, KENT / ESSEX
Following a number of disastrous fires in mainland European
road tunnels, an appraisal of British road tunnels’ safety
arrangements (or lack of them) has led to consideration being
given to the installation of a fire sprinkler system in the
Dartford (Kent) - Thurrock (Essex) tunnels.
One relevant factor in the Dartford tunnels case is that the
two bores are linked by only a single cross-passage. This
narrow, sloping tunnel section was made to assist in
tunnelling, and is unsuitable for emergency access in the
event of a vehicle and its load catching fire in a running
tunnel.
SOURCE: Ed OWEN, 2008, Dartford tunnel to retrofit
fire sprinklers. New Civil Engineer, 17 January 2008,
page 6.
THE OTHER CROSSRAIL PROJECT,
GLASGOW
Glasgow has had an east-west cross-city operational
railway service, linking High Street, Queen Street, and
Charing Cross and places further out, for years. It also
has a resource of abandoned viaducts and tunnels
available for reuse.
Strathclyde Passenger Transport has published plans for
a three-phase development of a separate north-south
Glasgow Crossrail, the first stage of which could be
operational in time for the Commonwealth Games in 2014.
It has been estimated that more than four million
passengers would use such a service at projected new
stations at Glasgow Cross, Gorbals, and West Street. The
line would also connect Glasgow Central and Glasgow
Queen Street Stations.
SOURCE: ANON, 2008, Phased plans for Glasgow
Crossrail. Modern Railways 65(717), page 7.
UNDERGROUND CITY PLANNED FOR
AMSTERDAM, THE NETHERLANDS
Amsterdam suffers from congestion. A solution under
consideration currently is the Alternative Multi-Functional
Underground Area Amsterdam (AMFORA) which
envisages six levels of new usable space below the city’s
canals, occupying an area of six million square metres.
Much of Amsterdam's traffic might be taken underground,
and the noxious exhaust fumes filtered out. The space
would be created by draining the canals, emplacing
diaphragm walls, and sealing the upper surface with a 28
metre thick clay seal, before returning the water.
SOURCE: Jessica, ROWSON, 2008, Urban
regeneration: underground city for Dutch. New Civil
Engineer , 14 February 2008, 12 - 13.
EAST LONDON LINE / THAMES TUNNEL
CLOSED TEMPORARILY, LONDON
London Underground’s East London Line, including the
Thames Tunnel, closed to traffic after the last services of
22 December 2007. Buses are replacing trains until the
line reopens, under new management as a part of ‘ London
Overground’, in the summer of 2010, when it will be a
part of the national rail system, not a part of London
Underground.
The Thames Tunnel has in fact been closed quite recently,
1995 - 1998, for refurbishment. It was Listed Grade II
on 24 March 1995.
The line had its origin in the Thames Tunnel built by
Marc Isambard Brunei and his son Isambard Kingdom
Brunei during the years 1825- 1843. Although intended
to be for road traffic, it was never completed with road
access at either end, and was used only by pedestrians
from 1843 until 1869, when it was incorporated with
effect from 7 December that year in the East London
Railway, with tunnelled and surface extensions,
ultimately, to termini at Whitechapel (Low Level) at the
north end, and New Cross and New Cross Gate at the
south end. There was a single connection via St. Mary’s
Curve, at Whitechapel, with the remainder of what became
the London Underground system. This is now redundant,
as the line will reopen with the ‘Southern Electric' style
third rail system, the Underground third- and fourth-rail
system being abandoned for the London Overground
development. St. Mary’s Curve (in tunnel) has had no
passenger services since 6 October 1941, but has been
used for empty stock movements, such as the transfer of
carriages to Neasden for repairs. The ‘Overground’ will
of course still run underground through the Thames
Tunnel! This reminds one of the Liverpool Overhead
Railway’s southern terminus at Dingle, at the end of a
tunnel!
The newly redeveloped line will be extended northwards
of Whitechapel to serve new stations (or in some cases
reopened stations) at Shoreditch High Street, Hoxton,
Haggerston, and Dalston Junction, tenninating in 2011
at Highbury & Islington. South of New Cross Gate, the
new services will run to Crystal Palace (the former Low
Level Station) or West Croydon. A new train depot at
Surrey Quays will replace an older LT depot at New
Cross.
SOURCE: Trevor BAKER, 2008, Farewell to
Underground Services on the East London Line. London
Railway Record 55, 38 - 42.
SOURCE: J.E. CONNOR, Trevor BAKER, and P.P.
RIDDLER. 2008, The East London Line in recent years.
London Railway Record 55, 43 - 56.
A3 ROAD TUNNEL CONSTRUCTION,
HINDHEAD, SURREY
A twin-bore 1.9 km road tunnel is being bored on the A3
near Hindhead, Surrey. Balfour Beatty and the National
Trust have issued details of public viewing platforms from
which work in progress can be watched at the north and
south portals. There is also a staffed visitor centre, open
at advertised hours.
The new tunnel takes the A3 away from, and underneath,
the Devil’s Punch Bowl Site of Special Scientific Interest.
The stretch of the A3 to be bypassed will be taken out of
commission as a road and ‘returned to nature’ in this area
of outstanding landscape quality. The two bores will have
numerous cross-passages in case of fire or other
emergencies. The north portal is to the south of Boundless
Wood, from whence the bore goes southwestwards and
then curving to westwards under Gibbet Hill and
Hindhead Common, emerging at the south portal near
Tyndall’s Wood. Completion is expected in 2012.
SOURCE: HIGHWAYS AGENCY, 2007, A3
Hindhead Improvement Scheme plan and programme.
Highways Agency: 6pp.
9
STONEHENGE ROAD TUNNEL PROPOSAL
RESURFACES, WILTSHIRE
Three months after the Government abandoned the
proposal for a road tunnel to remove the A 303 from the
historic landscape around Stonehenge, on grounds of cost,
the debate is re-opened. This results from Tesco’s plans
for an enormous 85,000 square metre distribution centre
on a 50 hectare site to the east of the monument. It appears
that one in five of the hundreds of lorries serving the
supermarket’s site would pass the stones.
SOURCE: Damian ARNOLD, 2008, Tesco puts
Stonehenge tunnel back on agenda. New Civil
Engineer , 28 February 2008, page 6.
OLIVE MOUNT RAILWAY TUNNEL TO BE
REOPENED, LIVERPOOL
The short double-track single-bore rail tunnel on the out-
of-use Olive Mount chord, between Broad Green and Edge
Lane stations, is proposed to have track reinstated to
facilitate freight train movements near Edge Hill,
Liverpool.
SOURCE: James ABBOTT, 2008, An expansive vision
for Merseyside. Modern Railways 65(718), 56 - 63.
THE BRITAIN - IRELAND TUNNEL SCHEME -
AGAIN
Proposals for a rail tunnel to link Great Britain to Ireland
have been discussed for over a century. Early on, the
favoured (because shortest) route was from near
Campbeltown in Kintyre to Northern Ireland, although
of course is was pointed out that the route thence from
Glasgow would have been so circuitous (unless two more
undersea tunnels from the mainland to Arran and from
Arran to Kintyre were also made) that it would be no
quicker to Ireland by train than by ferry from Stranraer!
The Association of Train Operating C ontpanies has now
revived the rail tunnel to Ireland suggestion, focusing on
three possible routes: Stranraer to Larne (Northern
Ireland); and Holyhead to Dublin or Pembroke to Wexford
(Republic of Ireland.) One Jackie Skipper, a senior
geologist with the Geotechnical Consulting Group, has
described the revived project as ‘slightly more difficult’
than the Channel Tunnel (which ATOC would like to see
duplicated to increase rail capacity to and from mainland
Europe). Tunnel Boring Machine design has advanced
significantly since the three existing Channel Tunnel bores
were driven. And, in fact, the Channel Tunnel was a
relatively simple job in engineering tenns - it took so long
to become a reality as a result of political and financial
problems. Skipper favours the Scotland - Ulster route,
as shorter than those to the Republic and, so far as current
knowledge goes, posing fewer geological problems.
Another tunnelling expert has described the project as
‘technically possible’ but ‘the business case just doesn’t
stack up.’ A recent report suggests that the idea of an
Anglo-Irish tunnel ‘was first given serious consideration’
in the late 1990s, following undersea tunnelling experience
with the 0resund tunnel successfully completed between
Denmark and Sweden. The Irish Sea is, in the relevant
area, of the order of 1 OOnt deep. An immersed tube tunnel,
a series of concrete boxes joined end to end and laid in a
dredged sea-floor trench, has also been suggested for the
85 km from Holyhead to Dublin. Presumably any route
chosen should this option be taken would avoid the
quantities of British poison gas dumped in the Irish Sea
after World War II!
SOURCE: Sean FLYNN, 2008, Ambitious plans for
tunnel to link Britain and Ireland. New Civil Engineer ,
17 April 2008, page 10 [with additional Subterranea
Britannica editorial content and comment],
TWO NEW RAILWAY TUNNELLING PROJECTS,
DUBAI
Despite its explosive growth, Dubai has so far lacked a
public mass transit system. This deficiency is now being
rectified by the construction of the first two of, possibly,
four new metro lines. Until the commencement of
London's Crossrail, this is reckoned to be the world’s
largest infrastructure project. Tunnelled sections at the
city centre will amount to 11 km, not far short of
Crossrail’s 16 km. The Dubai system will have double
track in single bore 8.5m diameter tunnels, compared with
Crossrail’s twin 6m diameter bores.
The Red Line, of 47 km, will extend from Jebel Ali in the
west, the overground part largely on piers, with four
subsurface stations in the city. This is said to be equivalent
to the distance from Heathrow London Airport to Epping.
The much shorter Green Line is to pass below Dubai
Creek, with six underground stations on a route from
Festival City to Rashidiya. Tunnelling is largely in wet
sand. Settlement at the surface has been less than 15
mm, and indeed mostly less than 5 mm.
SOURCE: Ed OWEN, 2008. Dubai Metro: green line.
New Civil Engineer , 6 March 2008, 24-25.
NEW METRO RAILWAYS FOR NEW DELHI,
INDIA
Delhi is constructing a vast mass of new transportation
infrastructure, including a trebling of the city’s metro, in
readiness for the Commonwealth Games in 2010. An
additional 120 km of lines are being constructed
underground and as elevated surface sections.
SOURCE: Jackie WHITELAW, 2008, Deadline Delhi:
a transport revolution in New Delhi has an unbreakable
deadline of 3 October 2010, the start of the
Commonwealth Games. New Civil Engineer , 28
February 2008. pages 20 - 22.
PROPOSED HAMPSTEAD HEATH TUNNEL
BLOCKADE, LONDON
It is proposed to close Hampstead Heath tunnel, on the
North London Line, for three months. This is to allow
the trackbed and track to be lowered to allow for larger
container trains using this route. The tunnel was last
closed in 1995 - 96 in connection with refurbishment to
allow its use by ‘Regional’ Eurostar trains bound for the
East Coast Main Line (which, in fact, never ran!).
SOURCE: ANON, 2008, Hampstead Heath tunnel
blockade in prospect. Modem Railways 65(715), page 14.
INFILLING UNINVITING PEDESTRIAN
SUBWAYS AT ROCHDALE, LANCASHIRE
Pedestrian subways under road ‘improvement’ schemes
have never been hugely popular (except, presumably, with
motorists)! Often smelling of urine, decorated by graffiti
artists, and potentially harbouring drug-pushers, drunks,
and muggers, they represent the unattractive underbelly
of urban roads for the motoring fraternity.
Some such are now being abandoned on a road scheme
near Rochdale, where a gyratory system is being replaced
by traffic-light controlled pedestrian crossings. This
presented the problem: what to do about the old subways?
Bricking-up the under-road tunnels was considered to be
an unacceptable option. After all, a bricked-up tunnel is
always seen as a challenge! Infilling the bricked-up
cavities with concrete would have been expensive, and a
disruptive operation calling for road closures for the
parking of numerous ready-mix concrete trucks. The
solution adopted is to use an expanding resin foam mix
which can be rapidly pumped into the cavities from up to
150 metres away via flexible plastic pipes. Each supply
lorry carries enough amino-plastic resin and hardener to
fill about 100 cubic metres of void. Once mixed within
the cavities, the components expand to around 12 times
their original volume, and set hard in about two hours.
The resulting expanded foam has a density of about 30
kg per cubic metre, and is strong enough to provide some
structural support if needed. Presumably, behind the
bricked-up subway entrances, it is not readily re-
excavatable by urban explorers! Perhaps, too, some of
these burrows may indeed be re-excavated 50 years or
more in the future, by archaeologists anxious to record
graffiti as representative of the culture of the 1970s! After
all, we are now re-excavating sealed World War II air¬
raid shelters! Perhaps a ‘pristine’ graffiti-decorated
subway might be Listed and preserved by English
Heritage as an important sample of how we used to live!
With or without the smells!
SOURCE: Adrian GREEMAN, 2008, Foamtastic:
contractors have been using high-volume resin foam to
fill in old subways on a Rochdale road scheme. New Civil
Engineer, 10 April 2008, page 42 [With additional
comment],
DUBLIN PORT ROAD TUNNEL OPENED 2006
CLOSED 2008, IRELAND
The Dublin Port Tunnel opened to road traffic (£228m
over budget) in December 2006. It was closed to traffic
on 27 February 2008, ‘causing traffic chaos in the city.’
The problem has been identified as faults detected in the
vehicle height detection system, fire suppression
mechanisms, and CCTV and emergency lighting systems.
The National Roads Authority is pursuing tunnel
contractors Nishimatsu-Mowlem-lrishenco for ‘several
million Euro’ in compensation to rectify the detected
faults.
SOURCE: Damian ARNOLD, 2008, Legal claim
follows Dublin fault. New Civil Engineer, 6 March
2008, page 12.
AMBITIOUS TUNNELLING PROPOSALS FOR
BHUTAN
Bhutan, with a population of just 700,000, is a landlocked
state in the eastern Himalaya, between India and Tibet.
The government has received an initial study for a network
of road tunnels conducted by the Norwegian Geotechnical
Institute, in collaboration with Bhutan’s Department of
Geology and Mines. Ten possible tunnels have been
identified to link urban centres and key infrastructure,
including a proposed hydro-electric power plant, and a
proposed new airport.
A map accompanying a recent report indicates a possible
tunnel of the order of eight kilometres long to link Paro
Airport to Jamdowom or Langdru. shortening the existing
road route via Chungkana and Kharbi on the Paro
Thimpu road.
Tunnelling in the ‘fragile and highly sheared’ rock is
'expected to present complex technical challenges’ and
call for extensive rock-bolting and use of shotcrete
(sprayed concrete tunnel lining).
SOURCE: Mark HANSFORD, 2008, Tunnelling
project set to transform Himalayan kingdom of Bhutan.
New Civil Engineer, 10 April 2008, page 18.
News - Publications - Books
HOW ARE THE NEWS ITEMS, ABSTRACTS AND
REVIEWS COMPILED?
Most of the news items, abstracts of new publications,
and reviews of new books are compiled by former
Subterranea Britannica Chair Paul Sowan. It is only
rarely that we receive without charge copies of books for
review. Most of the published material noticed in these
pages is from his own personal library. Apart from buying
a great many books, Paul subscribes to almost 100
societies and magazines. Quite expensive, but ‘retired
rate' subscriptions and two honorary memberships lessen
the cost! And of course access to the British Library, the
Geological Society of London’s Library, and others is
more than helpful. Added to which, several members
and others kindly send in relevant news-cuttings,
photocopies of magazine articles and so forth. Thanks
for many such are offered to, inter alia, Derek Bayliss
(Sheffield), Ivor Brown (Wakefield), Martin Dixon
(Ascot), Harry Pearman (Crayford), and Adam Sowan
(Reading). Newscuttings and periodical articles should
be annotated with periodieal name, date of publication,
and volume, part and page numbers where applicable,
please.
THE BRUNELS' THAMES TUNNEL, LONDON
A booklet previously published in 1992 by the Brunei
Exhibition Centre at Rotherhithe has been revised and
updated, and published in collaboration with the
Institution of Civil Engineers (ICE). This is probably
the most authoritative, best-presented and most accessible
and affordable account of the Brunels’ tunnel currently
available, and is highly recommended.
DETAILS: Andrew MATHEWSON, Derek LAVAL.
Julia ELTON, Eric KENTLEY, and Robert HULSE,
2006, The Brunels' tunnel. London: Brunei Museum:
84pp [ISBN 978-0-9504361-2-8] [On sale at £5 at the
bookshop at the Institution of Civil Engineers at 1 Great
George Street, London SW1],
SNAILBEACH LEAD MINE, SHROPSHIRE
The Snailbeach mine (SJ 375022), around two miles south
of Minsterley, appears to have been worked from Roman
times until 1955. Primarily a lead mine, exploiting the
ore galena, it also produced significant quantities of
barytes, and smaller quantities of zinc ore (sphalerite),
calcite, and fluorspar. An unusually complete set of
surface buildings survives, and the County Council along
with the Shropshire Mines Trust have restored many of
these and associated structures, allowing public access.
Guided tours underground are also on offer by
arrangement, although the lowermost parts of the 1,650
feet deep workings arc now flooded and inaccessible.
A new and highly recommended book, co-authored by 18
members of the Shropshire Caving and Mining Club and
the Shropshire Mines Trust, edited by Adrian Pearce, has
been published for the Trust by Peter Burgess. The book's
stated target audience is a ‘general readership" rather than
mining experts, in which aim it is undoubtedly successful.
The main chapters commence with accessible accounts
of the geology and history of the site. The ‘human interest’
element is addressed through chapters on living
conditions, working conditions, and the George’s Shaft
disaster of 6 March 1895 when a broken steel winding
rope precipitated seven men to their deaths at the bottom
of a 252-yards deep shaft.
Another chapter deals with the freight-only narrow-gauge
Snailbeach District Railway, opened from Pontesbury in
1877. Three miles or so of track ran to Snailbeach and
other nearby mines and roadstone pits. Although six
locomotives worked the line at various times, after 1946
trucks were hauled back and forth on the rails by an
agricultural tractor, until the line closed in 1959.
A useful location map and a clear and detailed plan of
surface remains accompanies a ‘surface tour’ chapter for
self-guided visitors. On occasions, some of the buildings
and their contents are also manned and open to the public.
Another chapter on underground tours stresses that these
are by arrangement only, under the guidance of
appropriately experienced leaders. The general public
can be shown a limited area of underground workings.
Persons wishing to see the lower levels can do so only
after training in vertical caving methods of descent and
ascent, such as SRT (‘single rope technique.’). The
volume is completed with a short account of wildlife at
the site, both at the surface and underground.
There is generous provision of black-and-white
photographs and line drawings. These include about 50
views, both historical and modem, of surface scenes and
structures; over 20 underground views and a mine plan;
depictions of mining artefacts and railway track and
rolling-stock; and so forth. Numerous drawings by the
late Malcolm Newton add materially to the attractiveness
of the volume. Photographs of 11 mineral specimens,
being in black-and-white, are perhaps not very successful,
although much more helpful colour versions of six of the
same are on the back cover. The front cover has an
attractive sunset view of a restored winding gear
headframe.
There is a seven-page bibliography, a five-page glossary
of mining terms, but no index. Further information can
be obtained at: http:7www.snailbeachmine.org.uk and
http://shropshiremines.org.uk.
DETAILS: Adrian J. PEARCE (edr), 2008, Snailbeach
lead mine, Shropshire. Shropshire Mines Trust Ltd / Peter
Burgess: I72pp [ISBN 978-0-9556081-2-4] [£9.50 +
£1.50 p/p payable to Shropshire Mines Trust Ltd from
Mike Moore, 53 Vineyard Drive, NEW PORT, Shropshire
TF10 7DF],
MADELEY WOOD COLLIERY, SHROPSHIRE,
1830s- 1967
This detailed and authoritative account of the Madeley
Wood colliery near Ironbridge, Shropshire, has been
compiled by Dr. I.J. Brown, who was employed there
during the years 1952 - 62 when he was training as a
mining engineer. His father John Henry Brown [1905
1990] had also worked in the Shropshire collieries for
over 50 years, and his wife’s family were also in
coalmining. This account, with numerous historical map
extracts and photographs, describes amongst other matters
the history and technological development of the colliery,
up to its closure by the National Coal Board in 1967.
Ivor Brown, on leaving the mine, went on to a career
which included lecturing in mining, the engineering of
land reclamation at Telford New Town, and serving as a
minerals planning officer in Yorkshire. Voluntary societies
such as the Shropshire Caving and Mining Club have
been fortunate to have such a professional amongst their
active membership.
DETAILS: Ivor J. BROWN, 2007, Madeley Wood
Colliery Halesfield and Kemberton Pits (from the 1830s
to July 1967) A selection of articles by Dr. IvorJ. Brown
(2007). Shropshire Caving and Mining Chib Account
26: 85pp [Available at £6+ £1.50 p/p from Mike Moore,
Moore Books, 53 Vineyard Drive, NEWPORT,
Shropshire TF10 7DF],
HISTORY OF THE CEIRIOG SLATE QUARRIES
AND TRAMWAY, CLWYD
A handsomely produced hardback volume of 212 pages,
profusely illustrated with black-and-white and colour
illustrations, has recently been published as the first part
of an intended comprehensive work on the industrial and
transport history of Glyn Ceiriog, in Clwyd. Glyn Ceiriog
is the valley running westward from Chirk, near the Clwyd
boundary with Shropshire. Chirk Castle overlooks its
lower or eastern end. The nearby Chirk Aqueduct (1796
- 1801) on the Llangollen Canal, and the mouth of the
valley, can both be admired from trains passing over the
18-span Chirk railway viaduct (timber in 1848, rebuilt
in stone in 1859) on the Shrewsbury & Chester Railway.
David Lloyd George once described Glyn Ceiriog as 'a
little bit of heaven on earth’ and your reviewer’s one brief
visit recently (to see lime kilns and a natural cave near
Castle Mill) leads him to endorse that sentiment.
However, the valley has in the past seen mineral workings
for slate, granite, silica, and china clay; a gunpowder
manufactory; a flannel mill; and the Glyn Valley
Tramway. To a considerable extent, slate was quarried
underground. John Milner’s first volume in what is
evidently intended to be a series addresses especially the
history of the slate quarrying industry here from 1592 to
1948. His next intended volume in this series. Rails to
Glyn Ceiriog , is to replace his earlier volume on The
Glyn Valley Tramway. He has been accumulating material
since 1952, and has made extensive use of primary and
archival sources.
The bulk of the work is devoted to the Wynne slate quarry,
supposedly commenced by one John Wynne [ 1709 -1795]
(where a slate quarrying museum with associated
underground tours operated from 1980 to 1998) and to
the Cambrian slate quarry, worked (also in part
underground) 1770 to 1947. Shorter sections deal with
the Graig-yr-Oryn slate quarry and other minor workings.
The impressively comprehensive illustrations depict, inter
alia , quarry and associated village scenes; relevant people;
tools and plant; quarry locomotives, rolling-stock, and
track; original quarry documentation from ephemera to
colour reproductions of quarry sections and plans (above
and below ground); modern surface and underground
views; and some very helpful site plans (in colour) relating
quarries, quarry buildings and tramways to modern
features.
There is a useful bibliography, a glossary of slate-
quarrying terms, 13 appendices, and a six-page index.
John MILNER, 2008, Slates from Glvn Ceiriog: the
history of the Ceiriog Valley slate industry 1529 1948
and its influence on the creation of the Glyn Ceiriog
Valley Tramway. The industrial history of the Ceiriog
Valley Volume I. Chester: Ceiriog Press: 212pp [ISBN
978-1-900622-11-0] [Available at £33 (incl. p/p) from
Mike Moore at Moore Books, 53 Vineyard Drive,
NEWPORT, Shropshire TF10 7DF.
mike@moorebooks.co.uk www.moorebooks.co.uk.
SECOND EDITION OF MILWR TUNNEL BOOK,
NORTH WALES
Cris Ebbs’ splendid book on the Milwr tunnel was
published in 1993. He has now published, on a ‘print-
on-demand’ basis, a second edition. Details of availability
of the black-and-white version (£9 + p/p) or the colour
version (£16.95 + p/p) are at www.lulu.com .
The tunnel was driven inland from the North Wales shore
from 1897 onwards to drain over 50 mineral-bearing
veins, thus allowing lead mining to proceed at the Halkyn
mine. By 1957 the tunnel had extended 10 miles inland
under the mountain, and was draining some 60 miles of
mine tunnels. The tunnel was closed in the 1980s, and
the mine ceased work in 1987. The Grosvenor Caving
Club negotiated an access agreement, and has to date
completed the surveying of some 26 miles of mine tunnels.
A HISTORY OF THE UK’S INDEPENDENT
NUCLEAR DETERRENT
Peter Hennessy, a recognised academic expert and author
on the Cold War, wrote Whitehall and the Cold War in
2002. He has now followed this with Cabinets and the
bomb, which reproduces and comments on now de¬
classified Cabinet documents dealing with the political
decisions relating to nuclear weapons from the Second
World War onwards.
DETAILS:
Peter HENNESSY, 2002, The secret state: Whitehall and
the Cold War. Allen Lane the Penguin Press: xxi + 234pp
[ISBN 0-713-99626-9] [London: Whitehall bunker Pindar
/ Wiltshire bunker at Corsham].
Peter HENNESSY, 2007, Cabinets and the bomb. OUP
/ British Academy Occasional Paper 11: xi + 356pp
[ISBN 978-0-19-726422-5] [On sale at £19.95 at the
Parliamentary Bookshop, 17 Bridge Street, Parliament
Square, SW1A 2JX. 020-7219-2890
bookshop@parliament.uk].
CROSSRAIL, LONDON
Two doubtless important volumes, neither of them light
reading, have been published recently in connection with
the Crossrail scheme.
DEPARTMENT FOR TRANSPORT, 2007, Further
responses to the Government's consultation on the
Crossrail Bill Environmental Statement. Department for
Transport Cm 7249: 186pp [ISBN 978-0-10-172492-0],
DEPARTMENT FOR TRANSPORT. 2007. Government
overview of the case for Crossrail and its environmental
impacts. Department for Transport Cm 7250: 144pp
[ISBN 978-0-10-172502-6],
CAVES & TUNNELS IN SOUTHEAST ENGLAND
- PART 18
Publication of the 18th issue of the long-running series
Caves &- Tunnels in South Hast England, issued as
Volume 34 of the Records of the Chelsea Speleological
Society is imminent. Copies may be had for £5 each
inclusive of postage and packing (payable to Chelsea
Speleological Society) from John Cooper, Records Officer
CSS. 31 Elm Close, WELLS, Somerset BA5 1 LZ, who
will also send (if asked) a list of earlier volumes (volumes
3-34 are all kept in print and are all still available) and
their prices. All volumes, with the exception of caving
titles listed below, catalogue underground sites of all kinds
and dates in and around SE England.
The exceptions are volume 19(1992) Exploration Journal
ofLlangattwgMountain, 21(1992) Caves ofSveningdal
(Norway), 25 (1999) Caves of marble, 28 (2004)
Exploring Welsh caves 1994 95, 29 (2004) Cave
conservation, 30 (2004) Exploring Welsh caves 1995
96, and 33 (2006) CSS 50 th Anniversary Journal. The
contents of what were retrospectively deemed to be
Volumes 1 - 2 (1956 and 1958) in the series, published
by the former London Speleological Group, were reprinted
in various volumes as appropriate from 3 (1963) onwards.
TUNNELS, TOWERS & TEMPLES: LONDON’S
100 STRANGEST PLACES
Not so much a coffee-table book (the illustrations are all
in black-and-white), but maybe a pot-boiler? With only
a hundred sites featured, there are of course few tunnels
alongside the (more numerous) towers and temples and
miscellanea. David Lloyd is a ‘writer and journalist’ with
over 20 years’ experience. His latest volume is, he states,
‘as much for the inquisitive armchair traveller as for the
well-informed London resident, for the first-time traveller,
or regular visitor.’
The 100 selected sites are each featured with a single
page of text and a facing full-page plate. Those of most
immediate interest to Subterranea Britannica members
are the Abbey Mills sewage pumping station, the London
Hydraulic Power Company, the never-opened Bull &
Bush (or North End) tube station, the Camden Catacombs,
King W illiam Street Station and the disused City & South
London Railway’s tunnels, the Greenwich foot tunnel,
the Holborn-Kingsway subway or tram tunnel, and the
Wapping LU Station from which (when it reopens) a view
along the Brunels’Thames Tunnel can be enjoyed.
The book contains a three-page bibliography, and a two-
page index.
DETAILS: David LONG, 2007, Tunnels , towers &
temples: London's 100 strangest places. Stroud: Sutton
Publishing Ltd: (4) + 230pp [ISBN 978-0-7509-4509-7]
[£19.99],
PARIS SOUTERRA1N - BELOW PARIS
Emmanuel Gaffard, who will be remembered by older
members as an attendee at our International Conference
hosted by Subterranea Britannica at Bath and contributor
to our Bulletin, has produced a small but comprehensive
volume of his coloured photographs of scenes below the
Paris streets. Each of the numerous photographs has a
caption in French and English. Apart from the classes of
underground site indicated by the cover title, there are
views of reservoirs, water-tunnels, cellars, wartime
shelters, cable tunnels and the metro. Antiquarian to
modem sites are featured.
The volume is a more accessible (in size, price and
language) precis of the definitive Atlas du Paris Souterrain
published in 2000. Amongst the acknowledgements, good
friends of Subterranea Britannica Gilles Thomas and
Julian Pepinster are credited. Small criticisms are the
occasional use of US spellings in the text and the lack of
diagrams or maps which are a strong feature of the
‘parent’ volume. Many of the sites have been visited by
Sub Brit on our trips to Paris in 2004 and 2008 but there
are still others to tempt us back.
DETAILS: Emmanuel GAFFARD, 2007, Paris
souterrain: carrieres, catacombes, cryptes. egouts,
tunnels.. / Beneath Paris: quarries , catacombs, ciypts,
sewers, tunnels.. Paris: Parigramme: 176pp [ISBN 978-
2-84096-482-7] [12J.
News - Publications - Periodicals
RAILWAY AND CANAL HISTORICAL SOCIETY
JOURNAL 35(9) (NOVEMBER 2007)
Part 9 of volume 35 of the Railway and Canal Historical
Society’s journal contains of subterranean interest:
Paul LUTER, 2007, The Ketley Canal..//, Railway and
Cana! Historical Society 35(9)( 199), 656 - 661
[Shropshire: near Wellington: a 3,916 yards tub-boat
canal made 1787 - 88 to serve coal and ironstone mines
and associated industrial installations / includes the 60-
yard Potters Bank tunnel and ‘a short tunnel at the foot
of the incline’ (under a road)].
Miles MACNAIR. 2007, The patents of W. and W.H.
James. 8. Patent No. 9473 (1842): Elevated and
pneumatic underground railways. Jl. Railway and Canal
Historical Society 35(9)( 199), 682 - 683.
RAILWAY AND CANAL HISTORICAL SOCIETY
JOURNAL 35(10) (DECEMBER 2007)
Part 10 of volume 35 of the Railway and Canal Historical
Society's journal contains of subterranean interest:
Carl SHILLITO, 2007, ‘The Fiery Jack’: a short history
of the Spital Hill tunnel, Sheffield. Jl. Railway and Canal
Historical Society 35( 10)(200), 11A - 779.
[A steeply graded 370-yard tunnel made in 1846 to link
the lines of the Great Central and Midland Railways. It
14
was partly bored, and partly cut-and-cover, and was partly
unroofed reducing the length to 301 yards; closed by 1947
and both portals are now blocked],
P.A.L. VINE, 2007, Hardham canal tunnel. Jl. Railway
and Canal Historical Society 35( 10)(200), 747 - 749.
[A 375-yard tunnel in West Sussex to divert the navigable
river Arun, saving some three miles, made between 1785
and 1790; it was closed to traffic in 1889 and blocked in
1898 by the London, Brighton & South Coast Railway
whose lines pass over the top].
WEALDEN CAVE AND MINE SOCIETY: CAVE
A M) QI ARRV5 (2008)
The Wealden Cave & Mine Society, based in Surrey and
Sussex, have published to date five issues of Cave d
Quarry, in 1992, 1993, 1994, 1997, and now (at last!) in
2008. The latest issue contains papers, some of which
have previously been published elsewhere, compiled and
submitted during the years 2003 - 2007, as follows:
Andy BELCHER, 2008, The Bedlams secret. Cave d
Quarry 5, page 17 [Dated 2005]
Andy BELCHER, 2008, The forgotten Jolliffe. Cave d
Quarry 5, 47 - 48 [Dated 2007]
Andy BELCHER, 2008, A geological train of thought.
Cave d- Quarry 5, 35 - 37 [Dated 2004]
Peter M. BURGESS, 2008, Barons’ Cave: possible
evidence of castle structures. Cave d- Quarry 5, 45 - 46
[Dated 2007]
Peter M. BURGESS, 2008, Barons’ Cave, a wine cellar?
- a new hypothesis. Cave d Quarry 5,2 - 4 [Dated 2006]
Peter M. BURGESS, 2008, Chaldon’s ‘hearth-stone’
quarry. Cave d Quarry 5,1-9 [Dated 2006]
Peter M. BURGESS, 2008, Early use of Arabic numerals
in Chaldon quarries. ( 'ave d Quarry 5,5-6 [Dated 2006]
Peter M. BURGESS, 2008, Efflorescent deposits in
Barons’ Cave, Reigate. Cave d Quarry 5,43 - 44 [Dated
2007]
Peter M. BURGESS, 2008, Fresh thoughts on the use of
plate rails in the Godstone Quarries. Cave d Quarry 5,
18- 19 [Dated 2006]
Peter M. BURGESS, 2008, Mcrstham excavations. Cave
d Quarry 5, 23 - 25 [Dated 2005]
Peter M. BURGESS, 2008, The mystery of the
Bletchingley miners, 1841. Cave d Quarry 5, page 31
[Dated 2004]
Peter M. BURGESS, 2008, Ritual protection marks in
Chaldon quarries. Cave d Quarry 5, page 10 [Dated
2006]
Peter M. BURGESS, 2008, Upper Greensand workings
at Merstham after Jolliffe and Banks. Cave c£- Quarry 5,
13- 16 [Dated 2005]
Paul W. SOWAN, 2008, Accidents Brockham: the
General Register. ('ave d Quarry 5,28-30 [Dated 2005]
Paul W. SOWAN, 2008, Accidents at the Brockham
hearthstone mine and limeworks, 1910 - 1934. Cave d
Quarry 5, 26 - 27 [Dated 2005]
Paul W. SOWAN, 2008, The glass-sand industry at
Reigate, Surrey. Cave d Quarry 5, 32 - 34 [Dated 2003]
Paul W. SOWAN, 2008, Reigate stone at Maldon, Essex.
Cave d- Quarry 5, 11 - 12 [Dated 2003]
Paul W. SOWAN, 2008, Reigate stone quarrying paper
- a review. Cave d- Quarry 5, 41 - 42 [Dated 2003]
Paul W. SOWAN, 2008, Re-opening Tower Wood stone
quarry. Cave d Quarry 5, 20 - 22 [Dated 2005]
Paul W. SOWAN, 2008, What exactly is hearthstone?
Cave d Quarry 5, 38 - 40 [Dated 2004]
DETAILS: Cave d- Quarry’ 5 (2008) can be purchased
for £ 5 (p/p extra) from the Wealden Cave & Mine Society,
8 Trotton Close, Maidenbower, CRAW LEY, West Sussex,
RH10 7JP.
News - Miscellaneous
MAYOR OF LONDON TO BRING LOST RIVERS
TO THE SURFACE
Rivers lost decades ago under tons of concrete could be
brought back to the surface as part of a plan to revitalise
London. Advisers to Boris Johnson are looking to create
more open spaces and water features by uncovering parts
of the tributaries which flow into the Thames. The Wandle,
which flows from Croydon to Wandsworth, the Bourne
in southeast London and the Brent, which passes through
Wembley, are among the 16 ‘lost’ waterways the Mayor
wants to bring back to the surface. The scheme will start
in the suburbs but will include “ornamental stretches” of
inner London rivers if possible.
SOURCE: Evening Standard 16.6.2008.
PROPOSALTO BRING THE RIVER TYBURN TO
THE SURFACE
London property developer James Bowdridge has drawn
up a plan to bring the River Tyburn, one of London’s lost
rivers back to the surface. The Tyburn is still flowing
but now runs several metres underground. Mr Bowdridge
is honorary secretary of the Tyburn Angling Society, a
body which does not get to do much fishing in its river of
choice, since the Tyburn was diverted underground to
allow Mayfair to be built in the 18th century. Boosted by
Mayor Boris Johnson’s scheme to uncover lost rivers, he
has commissioned architect’s drawings to show what the
West End would look like with a river flowing through it.
He admitted the scheme did involve slight difficulties;
namely, the destruction of several billion pounds worth
of property. Buckingham Palace would probably have to
go and so would the House of Commons, as well as other
chunks of prime West End real estate. The Tyburn runs
from South Hampstead, through Regent’s Park, along
Marylebone Lane, across Oxford Street, through Mayfair
and under Buckingham Palace before flowing into the
Thames at Pimlico, west of Vauxhall Bridge where its
outfall into the Thames can be clearly seen..
SOURCE: Evening Standard 8.7.2008.
SECRET CHAMBER MAY SOLVE MEXICAN
PYRAMID MYSTERY
Archaeologists are to open a long-sealed cave under a
Mexican pyramid in the hope that it will unlock the
mystery of one of ancient civilisation’s greatest cities.
W ith its soaring stone pyramids and geometric temples,
Teotihuacan was once the biggest city in the Americas
and possibly the world. However, experts have never been
able to say with certainty who built it and why it was
suddenly abandoned. An international team of experts
believes the answer may lie under the Pyramid of the
Sun, the centre-point of the vast ruined city 25 miles
outside Mexico City. At the end of July 2008 they are to
investigate a man-made tunnel and cave system
underneath the pyramid - the third biggest in the world -
to test theories that it was used for rituals including human
sacrifice.
At its zenith between 150 AD and 450 AD, Teotihuacan
was home to up to 200.000 people of various ethnic
origins and thought to have been larger than any European
city at the time, including Rome. But, sometime in the
7th or 8th century, it was set ablaze - possibly as the
result of an insurrection - and abandoned. The Aztecs
believed the city was divine and identified it with the place
where the sun was created. They also gave it its name,
which roughly translates as ‘’The place where men
became gods.” The tunnel entrance was discovered by
accident in 1971 while workmen were installing a sound
and light show for the 738 ft wide pyramid. After initial
tests, it was dismissed as a natural cave and sealed two
years later. Much of the information about it was lost
when the archaeologist who found it died.
SOURCE: Daily Telegraph 14.7.2008.
DEATH OF PHILIPPE TRUTTMAN
Philippe Truttman died, aged 73, early in December 2007.
He was the author of a massive and profusely illustrated
monograph on the Maginot Line, published in 1985.
TRUTTMANN, Philippe [c. 1924-2007], 1985, La
nmraille de France, on la ligneMaginot. Thionville:
Gerard Klopp: 627 pp.
TRUTTMANN, Philippe, 2008, Obituary. Casemate
/Fortress Study Group] 82, page 5.
DEATH OF BERTRAM ARTHUR JAMES -
STALAGLUFT III TUNNELLER, ZAGAN,
POLAND
Bertram Arthur James (1915- 2008), a former RAF pilot,
died on 18 January 2008. He was shot down south of
Rotterdam in June 1940, a few weeks after German forces
had invaded Belgium, the Netherlands and France, and
spent almost five years in prisoner-of-war camps, making
during this time something like a dozen escape attempts,
several of them by tunnelling.
At Stalag Luft I, on the Baltic coast, he was party to a
tunnelling attempt, although this was discovered before
an escape could be made. He was more successful in
getting out via a new tunnel in September 1941, but
recaptured. After several more attempts, he was
transferred to Stalag Luft III at Sagan in Silesia (now
Polish Zagan) where in January 1944 he joined in further
tunnelling schemes, including the driving of tunnels code-
named Tom, Dick, and Harry, for what became known
as ‘The Great Escape’. Harry, at 120 yards, was to have
been used by 200 escapers during the night of 2 nd March
1944, of whom 76 got out before the alarm was raised.
James was allocated the 39 th place out of the 200. Three
men (two Norwegian and a Dutchman) got away, the
remainder of the 76 being recaptured, and 50 of them
shot on the orders of Hitler.
James was then sent to Sachsenhausen, where he was
interrogated under torture, but nevertheless with five
comrades tunnelled out again, remaining at large for 14
days. He was eventually transferred to another PoW camp
in the Tyrol, where the inmates were liberated by the US
Army on 3 May 1945.
SOURCE: Dan van der VAT, 2008, Squadron Leader
‘Jimmy’ James. The Guardian, 22 January 2008, page
32.
CHANGES TO THE WATER SUPPLY
ARRANGEMENTS, GIBRALTAR
Until recent years, much of Gibraltar’s water supply was
derived from large expanses of corrugated iron sheeting
on the steep eastern side of the Rock, designed to catch
rainwater and channel it into underground storage
reservoirs. The installation of a desalination plant has
rendered at least the iron sheeting catchment part of the
system, installed by the Ministry of Defence and the
Government of Gibraltar between 1903 and 1926,
redundant. The sheeting was installed to a height of up
to 250m on a steep (34°) slope of loose sand and rocks,
and has given rise to problems such as loose sheets of
corrugated iron being blown about, and sand slipping
down onto properties on the coast road below. The civil
government part of the sheeting was removed in the mid-
1990s. The Ministry of Defence has now removed the
remaining 13 hectares of corrugated iron sheeting, and
steps have been taken to stabilise and revegetate the sand
slopes and scree.
SOURCE: Mike COOPER, Paul STUBBS, Tony
CARTER, and Stuart DUNN, 2008, Gibraltar runoff: a
steep challenge for decommissioning. Civil Engineering
161, 35-41.
16
40,000-YEAR OLD BEAR SKELETON FOUND
IN SCOTTISH CAVE
A bear’s skeleton believed to be up to 40,000 years old
have been recovered from Scotland’s longest cave, it has
been revealed. The animal’s remains have been brought
to the surface after a 12-year operation to clear an entrance
blocking where they lay. It was found in 1995 by cave
divers exploring the two mile-long stream cave Uamh an
Claonaite in the network of caves at Assynt in Sutherland.
It took the cavers from the Grampian Speleological Group
until the end of last year to unblock an old lOOft-deep
entrance shaft and provide a dry way into the cave. The
group removed the skeleton at the end of June using cases
to protect the bones as they were carried through narrow
passageways to the surface. It is thought the bear was
washed into the cave at the end of the last Ice Age, making
it at least 11,000 years old.
Animal remains in nearby caves date to more than 40,000
years ago, so the bear bones could be of similar age.
Bears were hunted to extinction in Scotland about 1,000
years ago. The cavers recovered everything visible,
including the skull, backbone, ribs, and most of the
animal’s long bones. They have been passed to National
Museums Scotland, the national museum service, where
they will be ’stabilised’ and carbon dated to establish their
age and whether they belonged to a brown or polar bear.
Scottish Natural Heritage (SNH) and Historic Scotland
(HS) had to give their permission for the work to take
place as the caves are designated as a national monument
and a site of special scientific interest.
SOURCE: Daily Telegraph.
Health and Safety
YOUTH DROWNS TRAPPED IN CULVERT AT
WITNEY, OXFORDSHIRE
An unfortunate accident occurred when three teenage boys
were playing in floodwater in a field near Eastfield Road,
Witney. One, Max Sullivan-Webb (17), fell face-down
into the water and was washed by the current towards
the grilled entrance to a culvert which was clearly
inadequate to carry the water away. Despite the efforts
of a second boy to rescue him, or at least to keep his head
above water, he remained forced against the grill and
drowned. Meanwhile a third boy had gone for help but,
sadly, paramedics were unable to revive the victim.
SOURCE: Sam JONES, 2008, Flood drowns youth
trapped in culvert. The Guardian, 5 June 2008, page 24.
URBAN EXPLORERS DIE IN A STORM DRAIN
AT SYDNEY, AUSTRALIA
Three urban explorers who had entered the Kingsford
storm drain at Sydney on 20 January 2008 had, perhaps,
not checked the weather forecast. As a result of a
downpour, they all ended up at the grating at the lower
end of the drain, where one appears to have been thin and
agile enough to escape through the iron bars. His trapped
companions died.
SOURCE: ANON, 2008, The main drain. Descent
201, page 8.
MAN CHARGED AFTER CAVE RESCUE
A man who became trapped in a cave in the New South
Wales Southern Highlands, prompting a large-scale
rescue, has been charged over the incident.
Geoffrey McDonnell became trapped in May at
Wombeyan Caves, after entering the cave alone to take
photographs. The experienced caver became trapped by
a rockslide and for more than 48 hours desperately
struggled for freedom, digging and shouting for
help.McDonnell, a diabetic, was unconscious when
rescuers brought him to the surface two days later.
Specialist cave rescuers, paramedics, police officers and
support crew were involved in the tough operation to
extricate the man from the cave.
Police have charged McDonnell with entering a cave
without authority, risking the safety of a person in the
park.
SOURCE: Sydney Morning Herald 24.6.2008.
MINE EXPLORER DIES IN EDINBURGH
A caver who was rescued after falling unconscious in a
disused coal mine shaft near Edinburgh died later in
hospital.
Fire-fighters were forced to abseil into the shaft after the
man apparently became overcome by gas (or shortage of
oxygen) in the mine at the Wisp in Newcraighall. They
were called to the scene when his fellow caver alerted
passers-by.
It is understood the man was overcome within seconds of
beginning his descent and had passed out a short distance
from the shaft entrance.
Lothian and Borders Fire Service arrived at the scene
just before 8pm. A spokeswoman said specialist crew
wearing breathing apparatus had to bring him to the
surface to try to revive him. It is understood that the man,
Peter Ireson, was a member of a local caving club and
had considerable experience. He was taken to intensive
care but sadly died a few days later.
The shaft is said to be one of several in the area. Though
not sealed over, it was surrounded by a wall and partially-
hidden undergrowth.
SOURCE: Scotsman 18.7.2008.
Who’s Who in Sub Brit
Martin Dixon
Marlin Dixon was elected as Subterranea Britannica s
Chair at the Society s April AGM. He tells us how his
interest in underground space developed and how he
sees Sub Brit developing in the future.
My interest in underground space was sparked by a
number of unconnected events in my youth. Bom in
Barnsley in the heart of the South Yorkshire coalfield,
I was amazed by the number and size of spoil heaps
(or muck stacks as they were locally known). If that
was the volume of material being mined and thrown
away, what volume of coal was being extracted and
how much excavated space must there be down below?
This fascination in large scale underground excavations
was complemented by a more hands-on exploration of
the WW2 air-raid shelters opposite the local Girls’ High
School. A particular and vivid catalyst in the study of
3D space beneath our feet was the model of the Victoria
Line and associated underground services and tubes
beneath Oxford Circus that used to be found in the
Children's Gallery in the basement of the Science
Museum. The model was subsequently transferred to the
London Transport Museum and is now in their reserve
collection at Acton.
This childhood interest lay dormant for a number of years,
though punctuated by occasional family visits to the Blue
John Caves at Castleton or to a working face at Houghton
Main Colliery with the scouts. I also recall making a
special trip to transit Woodhead Tunnel shortly before it
closed to passenger trains in 1970.1 moved to London in
1973 to study Chemistry at University College London.
Here, if nothing else, I learnt that at degree level,
Chemistry is Physics, Physics is Maths and Maths is
impossible. I also developed an interest in the London
Underground - it is quite scary writing this to realise the
‘new’ Piccadilly line stock is now 35 years old...
I spent thirty years working for British Airways from
1976 onwards. I worked across many departments
including IT, Cargo, Sales and Customer Service. One
of the most enjoyable jobs was four years spent in
Newcastle, setting up an IT development centre that grew
to 300 staff. I ‘discovered’ Subterranea Britannica in the
late 1970s after visiting the High Elms Ice Well in Bromley
with Linda Bartlett, my partner (and vice-chair of Sub
Brit). On following up with some research in the local
library I found correspondence with the society’s founder,
Sylvia Beamon; I was not alone!
For the ensuing 30 years Linda and I have been active in
Subterranea Britannica, in particular attending and
latterly arranging the Society’s UK study weekends. Linda
and I have also arranged Sub Brit weekends in France
and Belgium over the last 10 years. We have both served
on the Committee for a number of years and I authored
the first Sub Brit handbook. Our other interests range far
and wide. We have a share in a narrowboat (‘Dragonfly ’,
based in Cheshire), I fly as a private pilot and, partially
thanks to British Airways retired staff concessions, we
travel extensively round the world. We’re also both keen
archaeologists and long-distance walkers.
On taking early retirement from BA a couple of years
ago it seemed an ideal opportunity to devote more time to
supporting and steering Subterranea Britannica. This
fitted well with Paul Sowan’s desire to give up the Sub
Brit Chair after many years.
As for the future of our society, 1 see a number of
interleaved priorities:
* Continue to study a wide (and deep!) range of sites of
all purposes (extractive, transport, defensive, storage,
supply, protective, artistic, religious....) be they military
or civil, ancient or modem. I’m particularly keen that we
include unusual and at-risk sites in our studies.
* Encourage discussion and cooperation between
members and with other bodies in the UK and worldwide.
Continue to be a recognised authority on man-made and
man-used underground space.
* Promote and arrange the safe and responsible
exploration of sites, especially those not normally publicly
accessible.
* Pursue the research, study and recording of sites. Publish
this research using our own website, Subterranea and
other publications.
During my own membership of Sub Brit, the Society has
grown to almost a thousand members; the scope of sites
studied has increased, as indeed has our geographic
spread. I look forward to continued growth. I have made
many friends for life through Sub Brit and hope and expect
to make many more as the years go on.
Ty Croes Camp, Anglesey, North Wales
Mark Dalton
The War Years and 1950’s
By-laws regulating the use of new anti-aircraft artillery
ranges on the coast of Anglesey were drawn up and
published in 1939. These ranges combined both land and
sea areas at a remote headland accessed off the road
between Aberffraw and Rhosneigr on the west coast of
the island. The ranges and associated military
infrastructure held a number of titles over the years but
were known locally as Ty Croes Camp.Opening in 1941,
the camp operated as a training ground for anti-aircraft
gunners using the Vickers 3.7 inch AA weapon. Targets
were provided primarily by the Anti-Aircraft Co-operation
Units (AACU) based at nearby RAF Bodorgan, which
had been built at the same time as Ty Croes. Initially a
remotely controlled version of the Tiger Moth biplane,
called the Queen Bee, was used for target work. Later,
manned target-towing aircraft, such as the Henley, were
also employed. Trials work commenced in earnest in 1943
and included trials on 40mm Light Anti Aircraft (LAA),
3.7 inch and 5.25 inch Heavy Anti Aircraft (HAA)
weapons systems and their associated predictors and
equipment. After the wartime peak, trials continued
through the late 1940s and into the 1950s. By this time
the facility was operating as “Trials Establishment. Royal
Artillery, Ty Croes Camp".
AACU was now provided by RAE Llanbedr on the
Cardiganshire coast following the closure of RAF
Bodorgan soon after the war’s end. The major projects
during the latter half of the 1950s were the “Yellow Fever"
radar-based fire control system for the 40mm LAA gun
and the final development of the 3.7 inch gun in the fonn
of the “Longhand" automated loading system. While these
trials continued it was becoming clear that anti-aircraft
guns would not be able to counter the threat of the new
generation of jet bombers. Anti Aircraft Command was
disbanded in 1955 and by 1958 the HAA weapons were
considered to be obsolete. LAA weapons would continue
in service for many years to come as local airfield defence
but the time of the gun as a viable defence of the UK was
over.
The Missile Era
The late 1950s and early 1960s were a period of transition
at Ty Croes with the site being renamed “Trials
Establishment (Guided Weapons), Royal Artillery". The
last 3.7 inch AA guns were retired from the Anny in 1959
and from then on anti-aircraft technology became focussed
on guided surface to air weapons systems.
The original WWII camp had been set out in a roughly
triangular pattern and included classrooms and domestic
buildings. In order to upgrade the camp for guided
weapons trials, the original camp was extended to the
south with new buildings specific to missile training and
'Thunderbird 1' lift off in July 1961.
Photo from Keith Holderness
handling being erected in these areas. A new series of
emplacements were built for missile firing at the south of
the site close to the coastline. A network of concrete roads
was also constructed to link the various elements of the
new facility. It is unclear if buildings to the west of the
original site plus a rifle range and loop road to the north
west were added at this time or were part of the original
camp.
Following the initial upgrades, further buildings appear
to have been added when required. These included a large
workshop building at the southern extremity of the site.
The domestic arrangements at the camp also appear to
have been upgraded sometime postwar with
approximately 15 houses being situated to the east of the
main camp and a further 7 close to the main gate. Within
the camp a cinema and NAAFI club (the ‘Rocket’!) were
available when duties allowed.
The primary Anny guided weapon under development at
this time was codenamed ‘Red Shoes’ and became known
One of 5 firing holdfast locations prior to demolition
in 2006. Photo by Gwynedd Archaeological Trust
in service as ‘Thunderbird'. This was a fully mobile anti¬
aircraft missile; Thunderbird 1 was in service from 1959
to 1966, with Thunderbird 11 lasting until 1977. During
the 1960s and 1970s 36 Heavy Air Defence Regiment
deployed to Ty Croes to live-fire their Thunderbird
missiles. Trials work also continued at Ty Croes and it is
likely that some early Bloodhound trials were done here,
although the main work was centred at the Aberporth
ranges. Other systems believed to have been tested at Ty
Croes include Rapier, Blowpipe, Petrel and Skua missiles
plus a 105mm light artillery gun. Training stopped at the
camp in the early 1970s and April 1973 has been given
as the date of final official closure.
Missile Service and workshop buildings in 1988.
Photo by Roy Sloan
Despite the end of large-scale activity at the camp there
appears to have been some more limited activity which
continued through the remainder of the 1970s and 1980s.
By the mid 1980s the only obvious manifestation of this
was the use of a rifle range on the northwest coast, and
the presence of the local Army Cadet Force which had
the use of several huts outside the main perimeter of the
camp. Aerial photos and maps from the late 1980s show
that the majority of the southern area of the camp had by
then been fenced off, with the missile emplacements and
associated service buildings falling outside this boundary
and apparently abandoned. While the main camp was
effectively mothballed and the old missile areas left to
rot, there was one last role for Ty Croes to play.
UK Air Defence Radar Site
Ty Croes Radar in 1992.
Photo from Air Defence Radar Museum, Neatishead
Radar compound in 1992.
Photo from Air Defence Radar Museum, Neatishead
Political necessity had resulted in the rapid closure of the
RAF’s radar facility at Bishop’s Court in Northern Ireland
in 1991. Ty Croes was identified as a suitable replacement
location as it was still MoD owned; RAF Valley could
support domestic arrangements, and the area of coverage
would be similar to Bishop’s Court.
With the above reasons in mind, Ty Croes once again
became an important military asset in 1991 when an RAF
Type 94 Plessey AR3D mobile radar was sited to the
west of the original camp. The site was officially opened
on May 14 1992 with the radar being operated by No. 144
Signals Unit using a combination of existing buildings
and the mobile trailer units of the radar system. The site
itself was secured within a new razor wire-topped
compound fence. The addition of six prefabricated
‘Yamold’ pillboxes provided defensive positions. The
radar itself was protected within a further smaller fenced
area and was weather protected by encasing it within a
large domed cover.
The site had a relatively short life and the increasing use
of civilian air traffic radar to monitor military flying plus
the financial pressures on an air force reducing in size
resulted in the closure of the radar station in 1995.
Anglesey Racing circuit
During the early ‘90s the main camp buildings were
demolished to make way for a motorcycle racing circuit.
Racing started in 1993 and significant upgrades in 1997
meant that the venue became more usable for larger bikes
and also cars.
The initial site clearance removed the main camp and the
housing to the east, plus the majority of the later, missile
era, buildings. However, several areas still remained. The
seven houses situated in a small MoD estate just outside
the original main entrance were retained and eventually
sold off into private ownership. The radar compound,
rifle range and loop road to the northwest of the main site
were retained. Various buildings, hard-standings and
roads associated with the missile era on the southern
periphery of the property also survived. The large
workshop building situated at the extreme south of the
site was reused as a ‘Performance Driving School’ and
two other buildings in the same area were used as storage
for the circuit.
20
The circuit itself followed the route of the old perimeter
road with several of the comers, such as ‘Radar’, named
to reflect the previous usage of the site. Access to the
race track, now known as Anglesey Race Circuit or ‘Trac
Mon’, was past the former MoD houses near the original
entrance and then down a service road to park on the old
drill square which had become the public car park.
The track operated in this configuration until 2006 and
in this time became well known to motoring enthusiasts
for track days and through TV media use for motoring
programmes such as Channel 5’s ‘Fifth Gear’. Ambitious
plans for improving the circuit originated in 2001 and
came to fruition in 2006 when extensive redevelopment
of the site commenced. This involved the complete
remodelling of the main site with the existing circuit being
demolished to be replaced by three interlinked circuits.
Although further remnants of the former military site were
to be demolished, this time a full archaeological survey
was required by the planners prior to the work
commencing.
Gwynedd Archaeological Trust (GAT) conducted this on¬
site investigation in May 2006 and identified five missile
emplacements, several buildings, a light railway and
various other features during their survey. GAT also
maintained a watching brief at the site during the large-
scale excavations that followed and identified further
features when topsoil was removed. By late 2006
extensive earthworks had removed the majority of the
features identified and recorded by GAT. The last retained
wartime workshop on the site of the old main camp was
also demolished at this time.
On May 26 2007 Anglesey Circuit reopened with a much
improved facility and with plans to upgrade the circuit
further to a Formula 3 & World Superbike venue.
The site today
Currently the ‘Performance Driving Centre’ and the two
associated storage buildings are still used by the circuit,
although the future of at least one may be in doubt. The
rifle range and loop road to the northwest are also still
extant. The main area of interest today is the former radar
compound which contains evidence of a number of
different periods in Ty Croes’s life.
The Radar Compound
The majority of the buildings within the compound are
sited on rising ground to the west and are easily observed
from the houses and racetrack. They appear to be of 1950s
origin and are in the main comprised of offices and
technical buildings. These are now being refurbished.
Several are already in use by Premier First Aid Ltd as a
‘Medical & Training Centre’ and a further, smaller
building is used by ‘Kickstart Bike Training’. There is
also a vehicle shed, a fuel storage bunker, a light railway
and several smaller buildings which probably held plant
equipment. Several concrete roads link the buildings and
one road terminates at a large concrete hard-standing now
divided by the compound fencing. The size of the hard-
standing and the central conduit ran would suggest this
may have been a missile launch pad.
Evidence of the more recent radar station can also be
seen. A large circular concrete slab was added near the
termination point of the light railway to act as a base for
the radar. Metal tie-down hoops for the radome are visible
around this. There is also a good-condition concrete
vehicle ramp with modem ancillary equipment situated
in the northeast of the compound. The Yamold defensive
positions also remain with one being situated on top of
what appears to be a holdfast for an earlier light A A gun.
The station headquarters building and a smaller building
behind it appear to be reused 1950s buildings. A tarmac
road with a white painted parking space and the letters
‘OC’ ends adjacent to these buildings. The buildings are
badly damaged due to their vulnerable location on the
reverse slope out of view from the main race track area.
Summary
Ty Croes Camp played a vital role in the war training A A
gunners and was used in the development of many
important weapons systems from wartime days, through
the early Cold War period and into the 1970s. Its final
role as a RAF air defence radar station saw out the last
gasp of the Cold War and the site finally gave up its
association with the military as a result of the shrinking
UK defence budgets of the 1990s.
The site remained remarkably intact until the early 1990s
and the small compound that still survives contains a
fascinating snapshot of elements from each era of Ty
Croes’s history plus an insight into how existing structures
were reused as dictated by necessity.
With thanks to:
John Roberts Nina Steele Roy Sloan
NickCatford Keith Ward Doug Robb
Keith Holdemess Ed Dalton 2Blackcat
Armed Forces in East Germany
Mike Barton
Perhaps a few words on the 'armed forces’ in East
Germany, the former German Democratic Republic,
might be in place for those of you who have only a
passing knowledge of the situation in East Germany
prior to reunification.
Basically, there were two elements: the Russian forces
and the German forces. Let’s take a brief look at the
Soviets as they were in charge. 'Soviet’, ‘Russian’ -
we already have two terms. They are often used
interchangeably, but some people do get upset
(particularly, non-Russians!). ‘Soviet’ referred to
things pertaining to the whole of the Soviet Union, i.e.
the Soviet armed forces. ’Soviet’ means ‘council’ in
Russian and dates back to the ‘workers’ councils’ which
met to discuss ‘democratically’ (yes, 1 also believe in
fairies) what action was to be taken post-revolution.
So the Soviet Union was a union or collection of
workers’ councils (and pigs are taking flying lessons
this week).
‘Russian’ refers to things in the largest republic in the
USSR, i.e. the huge area around Moscow, with White
Russia and the Ukraine to the west and southwest and
Siberia lying to the east, plus the central Asiatic
republics forming the soft underbelly of the USSR.
The Soviet forces in East Germany, or EGER as was
used by relevant circles in the British Army, had several
name changes in the period from post-WW2 to the final
collapse of communism in Eastern Europe, ranging
from Group of Soviet Occupational Forces in Germany
to, finally. Western Group of Forces. To simplify
matters I will refer to them as ‘the Group’.
‘Groups of forces’ were only found outside of the Soviet
Union. In Eastern Europe there were five Groups:
Northern, Central and Southern Groups of Forces in
Poland, Czechoslovakia and Hungary respectively, the
Western Group in EGER and the three Baltic countries
of Estonia, Latvia and Lithuania formed the Baltic
Group of Forces. In wartime, a group would have
formed a ‘front’, i.e. a front is a grouping of armies
under a single command.
The Group in the EGER consisted of six armies, of
which five were ground forces and the sixth was an air
army [16th air army]. The five land armies [1st, 2nd,
3rd, 8th. and 20th] each had four to five divisions made
up of motorized infantry and armoured units. In
addition, there were the normal support services, such
as engineers, supply, communications, transport, etc.
A ‘power’ indicator: a tank division would have
somewhat more than 11,000 personnel and some 300
tanks. Towards the end of the 80s, the Group was
350,000 strong. The Group of Soviet Forces in
Germany was far and away the largest group of forces
outside of the Soviet Union.
In addition to the Group there were two further
interesting Soviet parties present in East Germany in
significant numbers, i.e. the KGB and the GRU. The
KGB represented the Soviet counter-intelligence and
intelligence services of the Soviet Union and the GRU
was Soviet military intelligence. Both of these services
were directly subordinate to Moscow. Relations
between the KGB, GRU and the Group were not always
good.
On the East German side the ‘armed organs’ were made
up of a wide range of uniformed bodies, ranging from
the armed forces to armed factory groups. There is
only space here to deal with the major components:
the NVA, Stasi and border guards.
The NVA (Nationale Volksarmee) was the term given
to the armed forces in East Germany, i.e. it does not
just refer to the army. The three services were referred
to as Landstreitkrafte - LaSK (land forces),
Luftstreitkrafte - LSK (air force) and Marine (navy).
A fourth service, air defence (Luftverteidigung - LV),
was sometimes combined with the air force (LSK/LV)
and at other times existed as a separate service,
depending on what was happening in the Soviet armed
forces. Their individual roles were completely
subordinate to those of the Soviet Group of forces and
from there upwards to the Warsaw Pact, which was
totally under Soviet control.
The Stasi has a very negative reputation and rightly
so. However, like most things in life, there was a good
side and the bad side! The Stasi, or to give it its proper
name ‘Ministerium fur Staatssicherheit’ (Ministry for
State Security) was the East German equivalent of the
KGB (on which it was closely modelled) and consisted
of two main elements: the counter-intelligence side
(Abwehr) - who were the guys who got the bad press
and the HVA (Hauptverwaltung Aufklarung), which
was the foreign intelligence service. Both the Abwehr
and the HVA were organised into main departments
and departments, each responsible for various aspects
of their respective trades.
The Border Guards (Grenztruppe - GT) were at times
directly subordinate to the NVA, at other times they
formed a separate service. They were organized into
three commands - northern, central and southern; these
in turn were broken down into regiments and battalions,
just like a normal army. The border guards were heavily
armed and in the event of war, would have provided a
significant addition to the fighting capability of East
Germany and the Warsaw Pact.
22
Positively the last German tour!
Nick Catford
In 2000, Sub Brit member Mike Barton came over from
his home in Germany to attend the Hack Green conference.
Mike had lived in Germany since 1978 working as a
civilian German translator but first went to Germany in
1960 as a regular
soldier involved in
Russian signals
intelligence. Mike’s
approaching retirement
had rekindled his
interest in the military
and political situation in
East Germany during
Our Fuhrer. Photo by Mark Bennett ^ co)d war Wjth the
cold war over and the Russians long gone it should now
be possible to visit some of bunkers that had been left
behind.
At the time, organising a tour for Sub Brit members
seemed like a good idea so he posed the question at the
end of the Hack Green conference “If I can organise a
visit to a number of Soviet and East German bunkers
would anybody be interested?” Hands went up across
the room so Mike felt committed and started making the
arrangements. At that stage, he didn’t know the location
of a single bunker, German or Russian.
The tour took place at the end of April 2001 when 20
Sub Brit members drove to Germany to meet up with
Mike at the Bundeswehr (German army) barracks at
Magdeburg where we were to spend out first night. We
left our cars at the barracks and the next morning our
transport arrived, a brand-new Mercedes coach driven
by a former East German border guard, Jochen Becker.
Jochen didn’t speak a word of English, knew nothing
about bunkers and certainly didn’t know what he was
letting himself in for; his brand-new coach didn’t stay
clean for long!
The ten-day tour took in some 18 bunkers at a variety of
military and government sites and by the end of the tour
we were all ‘bunkered out’. When asked, shortly
afterwards, if another tour could be arranged Mike was
quick to say “Never again!” but he soon mellowed and
the following year another similar tour of different sites
was arranged and smaller tours have followed every year
since.
In 2008 Robin Ware persuaded Mike to organise one final
tour. Mike is now approaching 70 and is looking forward
to a more peaceful retirement. Robin looked after the
arrangements in England, while Mike arranged the sites,
booked the hotels and organised the transport. Although
Jochen Becker was unable to drive us, we were able to
get his son, Andy, a former Bundeswehr special forces
soldier. So everything was arranged and 16 members of
Sub Brit once again drove to East Germany to meet up
with Mike and Andy for what was described as “positively
the last German tour” until the next one of course!
Machern Stasi bunker- 25th May
The German Democratic Republic (GDR) was divided
into 15 ‘Bezirk’ or districts, each of which had its own
‘mini-government’ which included representatives from
the Stasi (Staatssicherheit, or more correctly: Ministerium
fur Staatssicherheit - Ministry for State Security). The
Stasi really came into force following the 1953 uprising
in East Berlin and other German cities.
Telephone Exchange. Photo by Nick Catford
The Stasi HQ in each Bezirk had its own bunker facilities,
including a remote transmitter, some distance from HQ
bunker. The Leipzig bunker was at Machem, 15km east
of the city, the remote transmitter was at the Runde Ecke
(for which see later). All Stasi bunkers were built to the
same design (designation V2b), consisting of a long
corridor giving access to a series of long narrow rooms
to one side. Next to the corridor there is a mirror image
with a second corridor and a further series of rooms on
the opposite side, the two corridors having a number of
interconnecting doors. Both sides of the bunker had air
conditioning plant rooms leading to an emergency exit
shaft accessed through one of the side rooms and running
parallel to the main corridor. There were also two sets of
three standby generators and fuel tanks located near the
entrance airlock. One or two of the bunkers in smaller
districts had only one ‘wing’ instead of the usual two.
Bicycle-powered ventilation plant.
The bunker comprises pre-fabricated sections (up to 650
parts with a further 70 parts for the approach tunnel).
The two entrances are generally located within a shed or
storage facility to conceal them. These buildings can also
be used to store spare parts, etc. Similar bunkers were
also used at other non-Stasi locations and the first bunker
of this type was actually built in Wandlitz in 1968 for the
bodyguards of the SED (GDR communist party) members
who lived in the village.
To ensure that as few people as possible knew of the
existence of the bunker each site was provided with a
‘cover story’: at Machem local residents were told that
the site was holiday chalets for waterworks employees.
As there were already such chalets in the vicinity this
would have been believed by most people; every effort
was made to conceal the true function of the site. The
diesel exhausts were positioned near a chalet chimney to
deceive thermal imaging, a radio receiving aerial was built
to resemble a tree within a wooded area and screens were
erected to obscure more obvious features.
The site was guarded by dogs and the entrance building
itself had a steel cable fixed to the front and rear walls
for dog runs. The bunker was built between 1969 and
1972 and had a staff of between 85 and 120 of which
five were women for cooking and cleaning. In the event
of war, three KGB advisers would have been sent to
Machem although in fact no Russians ever went to the
site, fifteen of the bunker personnel were technicians, the
remainder Stasi operations personnel.
We entered the bunker, turned into the initial airlock, then
into the main airlock which brought us into the two parallel
corridors running through the facility separated only by
a thin wall with a couple of doorways. The long rooms
left and right served as offices and donnitories or for
technical and support purposes and included a
communications room, encryption room, kitchen, medical
centre and a workshop. There was also a section for the
KGB representatives and another for the local Stasi head.
At the far end of the corridors were transformers (left)
and toilets (right) and two isolated corridors (extreme
left and right) which were used for ventilation and
filtration plant. These could be driven by fixed wheel¬
less bicycle in the event of a power failure. At the end of
the two ventilation tunnels there were emergency exit
shafts reached through further airlocks.
Water was normally provided from an external deep well.
The diesel generators were located between the entrance
airlocks; the fuel tanks in an adjacent passage contained
up to 10,000 litres of fuel which was sufficient for
maximum of 35 days, although there were only stored
food rations for 6 - 14 days. The remote radio site was
located some 2 km away and was connected by landline
with the bunker. The bunker would normally only have
operated in receive mode until war broke out.
Two standard design Stasi bunkers have been restored as
museums; the other at Suhl was visited on the 2001 tour.
Machem is the better of the two bunker museums and
although it was largely stripped when the Stasi left it has
now been almost fully re-equipped and restored. The
bunker is open on the last weekend of the month from
13.00 - 16.00 and admission costs 3 Euros. The bunker
is ran by the Citizens Committee Leipzig Association
which also administers the memorial museum at the Runde
Ecke which was to be our next port of call.
Runde Ecke - 25 May
The Runde Ecke (Round Comer) was the name given to
the Stasi HQ for the Leipzig Bezirk and was so named
because it was a round-fronted building located at the
junction (comer) of Dittrichring and Goerdelerring. The
building now houses a memorial museum on one side of
the ground floor. Although everybody in Leipzig knew
what the building was, it wasn’t shown on any DDR-era
maps of the city. It was in this building that officers of
the Stasi worked on their surveillance of the citizens of
Leipzig, checking post, tapping phones, poring over
photos or reading people’s letters.
When the protests began in Leipzig in 1989 that would
eventually lead to the collapse of the East German state,
External view of the Stasi headquarters in Leipzig.
the ‘Runde Ecke’ was an obvious focal point and one of
the famous banners of the time states ‘When will there
be a Museum here?’ it now hangs proudly above the
boards that document the former inhabitants’ work. In
1989 there were 2,400 Stasi personnel in Leipzig and
when the demonstration started 30,000 anti-communist
protesters were expected. In the event 75,000 people
turned up and the Runde Ecke was seized without a shot
being fired. The demonstration in Leipzig quickly spread
throughout the DDR, eventually leading to the fall of the
Berlin Wall and the reunification of Germany. The
peaceful demonstrations in Leipzig in 1989 and their
progress take up one section of the exhibition.
Elsewhere, the exhibition covers how young people were
trained in the Ministry, the use of sport in the DDR to
further the ideology of the state and surveillance
techniques. Various artefacts from the offices that were
found when the Stasi abandoned the building are on
display as are numerous photos, letters and memos taken
from the Stasi files. Most of the rooms contain display
cabinets or wall boards with photographs and documents
but two rooms have been retained with their original (or
recreated) furniture and fittings; one is an office and the
other is a small holding cell. One of the most depressing
documents refers to the reporting of a fifteen-year-old
boy by his teachers for something he wrote in class; two
years later that ‘black mark’ was causing him trouble
with job and education applications.
Although all the interpretation panels are in German we
had an English-speaking guide with a good command of
the language; she was able to tell us a lot of information
about the function of the building although she appeared
to know little more about the site than her pre-leamt script.
The Runde Ecke is open daily from 10.00 - 1800.
Admission is free but there is a charge of 3^ for a guided
tour (minimum of 5 people). On one day of the year other
parts of the building are also opened to the public on
Leipzig’s equivalent of our ‘Open House’ weekend. On
this day, the basement is open and visitors are able to see
a large telephone exchange; our guide told us that she
has only been to the basement once and got lost!
Kossa 25/26 May
From Leipzig, we drove to Sollichau where we were to
spend the night in barrack accommodation at the former
Warsaw Pact facility of Kossa.
East Germany was divided into two military districts or
commands known as ‘Militarbezirk’ (MB). The southern
command (MB III) had its headquarters at Kossa near
Sollichau while the northern command (MB V) was at
Alt Rehse, a former WW2 Nazi medical facility. The East
German armies operating in these areas had their own
local headquarters, Kossa being the central command HQ
(bunker complex designation 16/7/301).
The telephone exchange in the communications centre.
The site has a long history dating back to 1935 when an
armaments factory was built in 400 hectares of forest at
Sollichau. Its buildings were largely blown up by 1951
by the Red Army in accordance with the Potsdam
Agreements. In the 1950’s, the Volkspolizei (GDR
National Police), later theNVA(Nationale Volksarmee-
East German Armed Forces), started to use the site. From
1958 onwards, workshops, an equipment depot and
accommodation appeared. These units vacated the site
by 1979 and Kossa gradually developed into the bunker
complex seen today.
The complex is spread over an area of approximately
397 hectares. Some 350 personnel would have been
stationed in Kossa with further personnel stationed in
nearby Bad Diiben; 240 operational personnel would have
served in the bunkers, backed up by 85 logistical staff.
There was food in store for three days and the bunkers
could have been hermetically sealed for 6 hours. The
25
bunkered garages would have housed some 24
communications vehicles which were connected to the
bunker communications system until departure. Four
complexes of this type were built - two each for the
territorial commands and two for their respective armies.
The Kossa site would have been the territorial command
HQ for the 3rd Army in Mosel.
Apart from ancillary facilities, there are six main bunkers
designated BW (Bauwerk) I - VI. The key element at the
site is the communications bunker (BW V) with its six
wings for housing the communications vehicles. At the
heart of the bunker is the communications centre itself
with its racks of radio equipment and a telephone
exchange. Four bunkers (BW I - IV) were for staff
officers; each had 50 workplaces and would have been
used by NVA and Soviet general staff officers, one had a
mainframe computer. The equipment Bunker (BW VI)
completed the complex; this served the whole facility and
included a 400 kVA diesel-generator in the event of a
mains supply failure. The total power consumption was,
on average, 520 MWh. A total of 36 vehicle revetments
were also located in the woods around the site and an on¬
site fire station was located close to the comms bunker.
The site has several large underground aerial fields; each
antenna was comb-shaped and occupied the area of a
small football pitch. The actual transmitter sites were
located some 10 - 12 km away and were connected by
cable to the Kossa complex; this aided security as no
radio masts were visible from the air. In addition, there
was an over-flight ban even for Soviet and East German
military aircraft.
The facility was built between 1976 and 1979 by NVA
construction engineers. The bunkers provided biological
and chemical protection, but would not have provided
any substantial protection against a nuclear strike. The
site was used occasionally during Warsaw Pact and major
NVA exercises. Construction costs were some DM 100
million, (about £40 million) for material alone. In contrast
to the northern bunker at Alt Rehse, Kossa had strategic
importance since a computer complex was installed for
use by the general staff of the Warsaw Pact.
As you enter the gates at the west end passing through
the high-voltage fence that surrounds the site, the road
leads into the U-Zone (‘Unterkunftszone’ =
Accommodation area). Close to the gate there are two
long buildings: on the left for sleeping accommodation
for the site guards and offices for daily administration of
the base. From here, access is controlled to the P-Zone
(Parkzone = Bunker area) 100 metres to the east.
Personnel entering the inner zone had to key in a number
and their codename, which was checked by the duty
officer. Opposite the administration buildings there is a
large range of garages for the guards’ vehicles.
The bunkers are constructed of 40 cm thick reinforced
concrete arc segments. They are covered with a 2cm thick
plastic layer which, in turn, is covered by two layers of
loose brickwork; the whole structure is then covered by
2m of earth. Two thirds of the bunker height is
Z ■■ Z
26
One of the bunkerd garages for housing comms vehicles,
underground, the top third forming a small mound; the
total height is 10m. Although the bunkers would not have
withstood a nuclear strike, they were capable of moving
laterally up to 20cm in each direction.
In 1997 Kossa was recognised as a cultural monument
and an association was set up to turn the complex into a
museum under the leadership of Dietrich Krumnow, the
last commandant from 1984 - 1990. It was thanks to his
huge personal effort that the site was maintained and
developed as a museum. The museum opened on 24 May
2002. Sadly Dietrich Krumnow died at his desk in August
2006, ‘on duty’ to the very end.
Although we arrived late in the day, our tour of the site
started on arrival with the main communications bunker
which has been fully restored. All the rooms within the
bunker have been re-equipped and several of the wings
have an impressive array of NVA communications
vehicles, I think a number of our party could have gladly
spent more time in the bunker looking at the vehicles.
Our guide was very knowledgeable but for those who
preferred to ‘do their own thing’ there was ample
opportunity to wander round at will looking at the
impressively restored rooms and vehicles and to take
photographs.
We returned to the barracks for an outdoor ‘pea supper’
before lighting a log fire as the sun went down after which
copious amounts of alcohol were consumed before retiring
to our respective barrack rooms. Our group was divided
into snorers and non-snorers but it was soon obvious that
a number of our members had lied! After breakfast, we
went back into the ‘P-Zone’ to look at the other five
bunkers in the complex; they have all been equally well
restored apart from one of the staff command bunkers
which has been turned into a museum with exhibits,
display boards, photographs etc.
Despite its isolated location at the end of a long twisting
road several kilometres northeast of Sollichau, Kossa is
one of the best bunker museums 1 have seen. The museum
is open Tuesday - Sunday with tours lasting two hours
at 10.00 and 13.00. Admission is 10 euros. Our thanks
are due in particular to the staff there who opened the
complex on Monday so that our programme did not have
to be altered.
Grossenhain 27 May
There was only one site on our programme for the
following day, the former Soviet Air Force Base at
Grossenhain, 30 km north west of Dresden.
The airfield at Grossenhain was built between 1913/1914
as a Prussian Military Airfield and was home to the Royal
Prussian Flying Corps Flieger-Bataillon Nr. 1. The first
hanger was completed on March 15th 1914 and the
airfield was operational the following day. Military flying
schools were established at the airfield between 1915 -
1918, training a large number of pilots and observers;
one of the pupils was Manfred von Richthofen, the
German fighter pilot known as ‘The Red Baron’.
One of the Granit nuclear storage bunkers.
Following the Treaty of Versailles in June 1919 which
ended WW1, most of the buildings on the airfield were
demolished. The airfield took on a civilian role with a
Flying Association operating there in the 1920s and 30s
but gradually it returned to military use after the National
Socialist (‘Nazi’) Party came to power in 1933. A remote
reconnaissance squadron was stationed there from 1934
and pilots from Grossenhain participated in the Spanish
Civil War. During WW2, the Immelmann squadron of
Ju 87 Stuka dive bombers was stationed at Grossenhain.
Towards the end of the war in April 1945 the airfield was
occupied by the Red Army and Grossenhain was
developed as a garrison town. During WW2 the length
of the runway had been 1,375 metres but this was
lengthened during the 50s and 60s, and forty Flardened
Aircraft Shelters (Type GDF-2A/13) were built at
dispersed sites around the airfield.
The runway was further extended to 2,400 metres and
the airfield enlarged in 1983/4 and the airfield was given
the code name ‘Ararat’. The airfield also took on a nuclear
role with the construction of two ‘Granit’ bunkers for the
temporary storage of nuclear weapons, ‘Granit’ being the
Russian codeword for this type of bunker design.
Following the end of the cold war, the local population
were able to visit the airfield for the first time when it
27
was opened up to the public on 15/16 August 1992. On
22 March 1993 the Soviets started leaving Grossenhain
and the withdrawal was completed in the middle of August
that year when the airfield was handed back to the civil
authority.
The airfield is still in use with commercial flights operated
by Kilianair; the airfield is also home to a number of
flying clubs and flying schools. In recent years the airfield
has been developed as an Aero-Park attracting both
aerospace-related and other companies. The development
of the Aero-Park has led to the demolition of many of the
buildings around the perimeter of the airfield. One large
hanger dating from 1918 remains as do approximately
half of the hardened aircraft shelters, some have now been
put to commercial use while others remain empty. A
number of interpretation boards have been placed around
the airfield.
A restored but engineless Russian MIG-21 in one
of the hardened aircraft shelters on the airfield.
In 2004, one of the Granit nuclear storage bunkers was
opened as a museum telling the history of the airfield
from 1913 to the present day. The museum has a model
of the airfield showing all the buildings, many of which
have now' been demolished. The adjacent Granit bunker
is used by local radio amateurs. After seeing the museum,
we drove round the remaining structures on the airfield
in the coach; the highlight was a Russian MIG-21 which
is kept in one of the aircraft shelters, although sadly it
doesn’t have an engine.
After leaving Grossenhain we headed northeast towards
Poland, but applied the brakes on the northern outskirts
of Cottbus.
Kolkwitz 28 May
Kolkwitz is the former home to the 3rd Air Defence
Division, responsible for the southern half of East
Germany. The bunker, which was built between 1965 and
1967, has been partially restored to provide an insight
into the air-defence concept of the country and as part of
the overall Warsaw Pact air defence system. Kolkwitz
lies just to the west of Cottbus in the southeast comer of
the state of Brandenburg; the facility is therefore also
sometimes known as Cottbus.
The filter room; similar Russian drum filters are found in many
Russia, Stasi and NVA bunkers throughout East Germany.
In line with the organization of the USSR armed forces,
the East German armed forces (NVA) consisted of three
services: Land Forces (LaSK), Navy (Marine) and Air/
Air Defence Force (LSK/LV). At different times the Air/
AD Force operated in the Warsaw Pact countries as a
single service or as two separate services, depending on
current military thinking. The two independent services
were combined into one in May 1957 with its headquarters
in Cottbus. In 1958, the HQ moved to Strausberg-
Eggersdorf, just to the south of Strausberg, east of Berlin,
the site of the EGER Ministry of Defence. In 1960, the
Air/Air Defence Force took over ‘Fuchsbau’ in
Furstenwalde as its main command post (ZGS-14).
By 1990, the LSK/LV numbered some 35,000 personnel,
of whom 29,900 were in air defence and the SAM
(Surface to Air Missile) units. The service operated in
132 facilities and had 21 airfields at its disposal. So the
organisation chart looked as follows:
The 1st Air Defence Division in Kolkwitz was tasked
with defending the southern air space of the GDR. It was
established in 1956, underwent various name and
organisational changes and Finally acquired this title at
the end of 1961. The division HQ was located in a
barracks at the Cottbus airbase a few minutes away from
its command post in Kolkwitz, officially designated GS-
31. As in the 3rd AD Division, the 1st AD Division
comprised flying personnel, SAM troops and radar troops,
together with supporting personnel for communications,
transport, etc.
The organisation of the 1st AD Division was as follows:
Although signposted, the museum is difficult to find in
the middle of a small residential/industrial area. The three-
level bunker lies beneath a single storey administration
building and the surrounding grounds and the only
evidence of it on the surface is a covered stairway
descending into the ground in front of the main entrance
into the admin block.
At the bottom of the stairs, the usual airlocks and
decontamination suite open onto the main spine corridor
on the upper level. Once the bunker was abandoned it
was largely stripped of fixtures and fittings and most of
the rooms on the upper level are still empty or have been
filled with display material or artefacts not necessarily
relevant to the bunker itself (in one room there is a section
of high-voltage electric fence!).
Controllers’ positions overlooking the situation boards at Kolkwitz
The air conditioning and filtration plant is located at the
far end of the upper level with the usual bank of brown
Russian drum filters found in most bunkers in East
Gennany. The middle floor is far more interesting with a
large telephone exchange, sick bay and a very impressive
operations room which still contains its original maps
with the controllers’ positions behind a glass panel to the
rear of the room. The room is very atmospheric and gives
a good impression of what the bunker must have looked
like when in use. On the lower floor, the kitchen and
canteen have been fully kitted out, there is another
telephone exchange and adjacent battery room, but again
many of the rooms on this lower level are empty and
awaiting restoration.
The bunker is open on the third Saturday of every month
from 9.00 - 12.00; admission is 6^.
From Kolkwitz we headed back towards Berlin; there
were no other sites on our schedule for that day but once
aboard the coach Mike informed us that we now had an
additional bunker to visit at Gosen.
Gosen 28 May
The Gosen complex was built for the Hauptverwaltung
Aufklarung (HVA) which was the foreign intelligence
service of the GDR and was an integral part of the
Ministry of State Security (Stasi), the equivalent of our
Secret Intelligence Service (MI6). The HVA was under
the control of Colonel-General Markus Wolf, who was
succeeded in the late 1980s by Lieutenant-General Werner
Grossmann. From the late 1950s, the HVA were based in
the building complex of the Stasi’s headquarters in the
Berlin borough of Lichtenberg. After completion of new
office buildings at the corner of RuschestraBe and
Frankfurter Allee, the HVA established its base of
operations there. In 1988, the HVA school, including the
School of Foreign Languages, moved to Lake Seddin in
Gosen 4.5 miles south of the city of Erkner on the outskirts
of Berlin. A backup bunker for the headquarters of the
HVA was also built there.
This huge shed conceals the two entrances to the Gosen bunker;
the other entrance can be seen at the far end. This protected
entrance is not provided at other standard Stasi bunkers.
Photo by Dan McKenzie
The cover name for the HVA school was ’Central School
for Sport and Technology’, but was known by its students
as ‘The Forest School’. In 1989, there were over 300
employees at the school which was run by Colonel
Bernard Kaufmann. The college had three faculties:
Faculty A- political theory training. Faculty B - ‘special
disciplines’ and intelligence methodology and Faculty F
- foreign language training for operational purposes,
including interpreting.
The bunker was designated 'Objekt K81/1’ by the PBS,
the EGER bunker planning group and was one of four
bunkers on the site (one of the others was a bunkered
garage): its codename was ‘Kombinat’. The design was
based on the standard Stasi bunker type with two identical
halves, using prefabricated concrete sections and then
adding reinforced concrete to form a blast cap; the
foundations are 20 cm thick and the roof slab is 25 cm.
The bunker was designed to withstand a blast wave of up
to 300 kpa/cm" and high radiation and thermal levels and
to provide protection against chemical and biological
weapons.
The bunker was provided with 6 X 15kVA standby
generators and two 2500 litre fuel tanks which were
sufficient for 6 - 8 days autonomous operation. In the
event of the bunker having to be completely sealed it could
have operated for two spells of 12 hours. There were two
identical ventilation systems, each with a capacity of 800
m=/h, i.e. 11.8 m=/h per person. Emergency ventilation
would have been achieved manually using two fixed
bicycle frames.
The water supply came from a deep well within the bunker
with a capacity of 2.5 m=/h. There was also a water
filtration plant available with a capacity of 300 litres per
hour. The bunker differed from the standard Stasi design
in several ways with additional hardening including blast
doors at the top of the entrance stairs and improved air
intakes; perhaps this was a later modification as Gosen
was one of the last standard design Stasi bunkers to be
built. When fully manned the bunker would have had a
staff of 135, of which 70 were operational personnel and
65 supply and support personnel.
Most of the sites on this year’s tour were museum bunkers
where knowledgeable guides are generally provided.
Gosen is a derelict site so prior to the visit, Mike contacted
Werner Grossmann to see if he would be prepared to guide
us round ‘his’ bunker. Unfortunately he had other
commitments on the day but offered to send his second-
in-command Major-General Heinz Geyer and Colonels
Nickel and Lohse; Nickel
was the last bunker
commandant at Gosen.
Geyer had worked closely
with spy chief Markus
Wolf during the period
when spies were infiltrated
into NATO headquarters in
Brussels and most
notoriously of all, into the
private office of the West
German Chancellor, Willy
Brandt. Sadly, Heinz
Geyer died of a heart
attack a few days after our visit at the age of 79 so this
was, perhaps, his last engagement.
The bunker is entered from a large storage shed on a hill
overlooking the school; the shed is completely empty apart
from the two covered stairways, one at each end of the
building. Once through the entrance blast doors it was
clear that the bunker had been fairly thoroughly stripped
but some equipment and plant still remains. The six
generators have been removed but most of the ventilation
and water plant, including the bicycle frames, are still in
place as is part of the main distribution frame (MDF) in
the telephone exchange.
Gosen also has its place in Cold War history: the 80s saw
increasing tension on the missile front with the Soviet
Union, on the one side, wanting to install the intermediate
range ballistic missile SS-20 (NATO designator Saber)
in the Soviet Union, with Germany well within its
operational range, and President Carter’s record defence
budget (157 billion dollars) for the Trident, MX, cruise
missile and nuclear submarine programmes on the other
side.
The group with the HVA Generals at Gosen.
Photo by Tim Robinson
Carter was followed by Reagan (and the NATO double¬
decision in 83/84), and the Soviet Union saw the stakes
being raised even higher with threat of a potential first-
strike by NATO becoming even more threatening in their
eyes. In an attempt to forestall this, the Soviet Union /
Warsaw Pact set up the “Ryan” programme. “Ryan”, the
initials in Russian from the term “raketno-yademoe
napadenie” or “nuclear missile attack”, was designed to
track every single possible indicator of such an attack
being prepared. This included not only reports from agents
in the various ministries and government bodies in the
West, but also from detailed observation of the Pershing
2 and cruise missile sites by agents on the ground.
To this end, the HVA set up a special reporting centre in
EGER with direct links to Moscow, and a special working
party of the Stasi head (Mielke) was organised to plan
the urgent construction of bunkers for key elements of
the HVA and Stasi. As a result, Gosen was planned to
house the HVA leadership, although Markus Wolf, the
then head of the HVA, was not particularly enamoured
of the scheme since he doubted whether such bunkers
really offered any real advantage. However, he did
consider the large sheds and halls built to camouflage the
bunker entrances “as being ideally suitable for social
gatherings and for accommodating guests”.
From Gosen we drove to Helenenau where we were to
spend the next three nights. This is a former Stasi training
facility, now a riding school.
Major-General Heinz Geyer.
Photo by Tim Robinson
30
Garzau 29 May
We had a short drive to Garzau, the former NVA computer
and reporting centre. Each day all military units would
upload their current status to the next higher level and so
upwards until all the information arrived at Garzau where
it was processed and a daily reporting chart was submitted
to the NVA defence ministry in Strausberg and to the
relevant ministers. The bunker has been retained as a
museum.
The computer centre.
The Garzau computer centre is about 6 km southeast of
Strausberg. Construction started in 1972 and the bunker
was fully operational by 1976. The main entrance is from
the basement of the administration block from where a
200-metre uphill tunnel leads to the lower floor of the
two-level bunker covering approximately 4,000 sq.
metres. The bunker was built by cut and cover with a
reinforced concrete blast cap above the structure and is
built into a nearby hill, with rooms being accessed from
a ring corridor on both levels. There is an emergency exit
from the upper floor with an adjoining shaft for heavy
plant.
The bunker was designed to withstand a direct hit from a
nuclear bomb and a displacement of 0.4 metres laterally
and/or vertically was allowed for in the event of such an
attack. Many of the internal floors are mounted on shock
absorbing springs and the entire structure is contained
with a ‘Faraday Cage’ to protect the electronic equipment
from external interference following a nuclear attack. As
in most bunkers, an overpressure was maintained inside
the bunker to exclude dust, radioactive fallout particles
and biological and chemical warfare agents. The bunker
has its own water supply, with water being drawn from
an 80-metre well. The bunker was designed to operate in
self-contained mode for 24 hours before a decision had
to be taken whether or not to continue in totally sealed
mode for up to 14 days.
The original East German computers were removed but
some have now been reinstated. The bunker contains all
the usual plant and equipment, four marine diesel
generators, air conditioning and filtration plant, water
pumps and purification plant etc; this is all in working
order. There is also a fully equipped kitchen and an
extensive telephone exchange.
The museum is open on the last Sunday of each month
throughout the year with guided tours lasting 90 minutes
at 4pm. The bunker can be opened on other days by
special arrangement. Admission is 10 t .
Wollenberg 29 May
From Garzau it was a short drive to Wollenberg, a former
NVA tropospheric site and one of the three stations in
East Germany of the Warsaw Pact BARS tropospheric
The telephone exchange.
link back to Moscow. This facility was covered in detail
in Subterranea 11.
Harnekop 30 May
Our first excursion of the day was to see the NVA's
underground communication and command centre at
Flarnekop (designation Objekt 16/102), a three-level
bunker serving the East German defence ministry at
Strausberg. In the event of war, Harnekop would have
Dispatchers Room.
The operations room.
served as the main command post for the N VA within the
Warsaw Pact Supreme Command
Hamekop is about 14 km north-northeast of Strausberg
and was a very closely guarded secret. The bunker is
hidden deep in the forest to the west of the village.
It was built under great secrecy between 1971 and 1976.
In order to draw attention away from the genuine
excavation a ‘decoy’ excavation was made elsewhere and
the real hole excavated at night under cover of
camouflaged tarpaulins. Workmen were only employed
for short periods and then replaced, so none knew the full
extent or nature of the construction; excavated spoil was
sprayed with liquid manure to disguise it. Visiting officers
from Strausberg were driven at night in buses with blinds
down and via a long and tortuous route. The 16km round
trip from Strausberg could take up to two hours; NVA
staff even wore East German Post Office uniforms to
maintain the cover. As usual there was a ‘cover story’ at
Hamekop, local people being told that the facility was a
weather monitoring station for aviation.
As with the computer centre at Garzau, Hamekop has a
high level of protection against a nuclear attack. Many
of the rooms have sprung floors and the bunker was able
A main-frame computer was exported to Russia, then
immediately brought back to Hamekop in secrecy.
to withstand 0.4m lateral and/or vertical displacement.
External walls are 3m thick and internal walls 1 m thick.
The main entrance into the bunker is from the basement
of the HQ block, from where a tunnel leads into the upper
ring corridor.
In wartime, the bunker would have had a staff of 450,
comprising 200 officers and 250 technical and domestic
staff and could have operated in sealed mode for 25 days.
There are four dining rooms and beds for 160 people so
a ‘hot bed’ system would have been in operation.
Outgoing signals from the bunker would have been carried
by buried cables to remote transmitters at Kunersdorf
and Wollenberg, so as not to give away the bunker’s
position to persons monitoring the radio frequencies, but
it could, if required, transmit directly up to 200 km from
antennae buried 0.8m below the ground around the
structure. It was also possible to broadcast via DDR radio
or television networks.
A main-frame computer, made in Jena, was exported to
Russia, then immediately brought back to Hamekop in
secrecy. Much of the original equipment remains in place
but the computer is not original although it is the same
type.
In the event of a power failure, the bunker was equipped
with four marine diesel generators which could be in
operation within 20 seconds and if they failed there was
sufficient battery power to keep the bunker functioning
for 24 hours.
Throughout the 1980s, the bunker remained undetected
by NATO Intelligence and was only revealed in 1990, on
the day of German reunification. In May 2000 an
association was established to restore and administer the
bunker with the eventual aim of opening it to the public.
The bunker was declared a national monument in 2001.
Public tours take place on weekdays March - October at
midday and at weekends every two hours from 10.00am.
From November - February there are weekend tours at
12.00 and 14.00. Admission is 10 t .
When we first visited the bunker in 2001 photography
was strictly prohibited but this has now been relaxed, at
least for foreign visitors. Hamekop is a big well-equipped
bunker with plenty to see and I felt we were rather hurried
round and probably didn’t see everything. There was
always a member of staff at the back of the party to ensure
that nobody wandered off but we were still given an
excellent tour.
Ladeburg 30 May
Ladeburg was the headquarters of the NVA’s ‘Hermann
Duncker’ 41 st Surface-to-Air Missile (SAM) Brigade. It
was part of the 1st Air-Defence Division with its
headquarters at Cottbus and its command post at
Kolkwitz, within the East German Air Force/Air Defence
Service. The NVA SAM units were formed into three
SAM brigades, one being at Ladeburg and a further three
32
The two-level situation room before the equipment was removed.
SAM regiments with a total of 3000 surface-to-air
missiles.
The 41 st SAM Brigade itself consisted of three air-defence
complexes, each comprising four SAM battalions, armed
with Volchov SA-2D missiles (NATO ‘Guideline’), for
short and medium ranges, six ramps each with one missile
and Neva SA-3C missiles (NATO ‘Goa’), for low to very
low flying aircraft, four ramps each with four missiles)
and a technical battalion, plus a special SAM Group
(FRAG-411) at Badingen/Osteme, armed with the long-
range Vega SA-5 missile (NATO ‘Gammon’), for
important targets such as AWACS, incoming missiles,
etc., high range, high speed, six ramps each with two re¬
loaders.
The Ladeburg facility included a Technical Battalion (TA-
4120) and a radar battalion (FuTA-4101). The latter, via
several links upwards, would eventually have been
reporting to the NVA HQ for air defence at ‘Fuchsbau’,
Fiirstenwalde. Both the Soviet equivalent, ‘UK-20’, and
‘Fuchsbau’ would have passed on the air defence air
picture to the Warsaw Pact air defence HQ in Minsk.
The command post at Ladeburg was built between 1983
- 1985 amongst its other roles the radars provided ground
control intercept cover for the fighter squadrons at
Uolzdorf and Marxwalde. The complex comprises the
two-level command bunker and an adjacent range of
garages, three radar ‘hills’ and a staff bunker for the radar
personnel. We walked up to one of the radar platfonns
which are all located at the top of artificial hills within
the radar technical compound; there is little to see apart
from the mountings for the radars and ventilation shafts
for the garages below the hill.
The command post has a floor space of approximately
1,500 m" with 68 rooms. The heart of the bunker is a two
level situation room with a map wall overlooked by offices
on two-levels. The room is very similar in size and design
to our own regional war rooms. The bunker is protected
by a 3.75-metre reinforced concrete blast cap. It was
permanently manned as part of the Warsaw Pact alert
system and at any one time a minimum of 30 people would
have been in the bunker; but when fully manned the bunker
had a complement of 110 with a further 60 in the adjacent
garages.
The upper level comprises; air conditioning plant,
filtration and ventilation plant, compressed air system,
medical centre, kitchen, dining room, restrooms,
washrooms and toilets. A number of offices overlook the
situation room below. The lower level comprises;
dispatcher’s room, standby generators, fuel tanks,
waterworks, communications and encryption centre, radio
room, communications room, office and the situation room
itself. The command centre itself has been well restored
with most of the kit back in place. Here we were given a
free hand: either stay with the tour or wander round on
your own. The bunker and the adjoining garages are
separated by a 2m layer of gravel, but were linked by a
system of airlocks. The two garage complexes were some
48m long, 15m wide and 7 m high and were protected by
heavy blast doors. These have now been sold for scrap
and have been replaced by wooden doors; each garage
complex had its own ventilation system. The garages are
now in private hands and not part of the museum.
In 1990, the Bundeswehr took over the site and intended
to carry out explosives trials in the bunker but this was
not well received by local residents. The Bundeswehr left
the bunker in December 1991 and the bunker was first
opened to the public in 2002.
The situation room as it appears now.
The site also has two further bunkers: a Type FB-3 and
an FB-75. The FB-75 is identical in design to the staff
bunkers we had seen at Kossa and is also used at other
NVA sites. It is located within the radar technical area
and provided protection for radar personnel. It is a two-
level bunker; the upper entrance level contained the
airlock, toilets and washrooms and the filter system with
stairs down to the lower level from where the corridor
radiates in three directions. The lower level has a switch
room, air-conditioning and water supply/sewage and three
large rooms that were used as classrooms and offices.
The bunker is largely stripped apart from plant. From
the lower corridor, there is further access to the upper
level where there was sleeping accommodation and an
emergency exit shaft.
33
The bunker is open at weekends and holidays by
appointment only; tours last 90 minutes for which there
is a charge of 5 L . Compared to the other bunker museums
we visited during the week which are well established
and professionally run, Ladeburg is run by a small group
of very enthusiastic young people almost as a hobby. The
bunker is owned by an animal sanctuary and all the
proceeds go to them rather than the group who run the
bunker. Our tour was considerably longer than the usual
90-minute public tour. We were all impressed by the
enthusiasm of this young group and we decided to make
a donation to them as well as to the animal sanctuary as
we felt the money would be put to very good use in the
bunker.
Mohlau 31 May
In wartime, the Western Group of Forces (WGF),
previously known as the Group of Soviet Forces in
Germany (GSFG), would have become a ‘front’. This is
a Soviet/Russian strategic military term and is not the
same as being in the front line; more a collection of annies
and supporting forces. WGF would have become the 1 st
West Front. Its main command post (CP) would have
been in Mohlau south east of Dessau, its forward CP in
Lossa, its alternative CP in Bardenitz (NW of Jiiterbog)
and its rear CP in Merzdorf (E of Jiiterbog), sites that
Protection against asbestos and other toxins was a
requirement at Mohlau. Photo by Mark Bennett
numerous Sub Brit members have previously visited.
There was also an air defence command element at
Felgentreu (near Jiiterbog).
Access to the bunker was originally via the basement of
the headquarters building, as is normally the case. The
main bunker is cast concrete and was built in the 1970s
adjacent to the headquarters building. It was constructed
specifically for its role and resulted in changes to the
functions of existing high-level bunkers and facilities,
which had not lived up to expectations. The original two-
level bunker was extended at a later date with the addition
of two ‘wings’, each comprising two tubes and a head
unit constructed of pre-cast arched concrete sections and
joined to the main bunker by tunnels. There was also a
garage complex which could house a mobile Almaz front
command air-defence display system. There is also a
further, smaller bunker complex to the south of the main
site which would have been used for air defence purposes.
Smoke-damaged airlock between the main bunker
and one of the wing bunkers.
Although stripped by the Russians when they departed,
the bunker initially remained in good internal condition
until it was further stripped of all its internal wiring by
illegal scrap dealers. This involved pulling up the floor
and burning the insulation off the wiring inside the bunker
leaving it in an appalling and dangerous condition.
Following this theft, all the surface buildings and
associated structures have been demolished leaving no
trace whatsoever; these included satellite facilities and
underground aerial masts which could be raised when
required. The bunker was sealed but in recent years access
has been restored through one of the emergency exits.
The barracks which were located some distance away
from the main site have been retained as temporary
accommodation for asylum seekers.
For some members of the group, Mohlau was the highlight
of the week, but for others it was an anticlimax. It had
always been intended that we would end the tour with the
massive Nazi underground weapons factory at
34
Halberstadt which was later used by the NVA and then
the Bundeswehr as a stores and mobilisation depot. We
were able to visit Halberstadt in 2003 but due to the recent
illegal dumping of rubbish there criminal proceedings have
recently been initiated against the owner so Mohlau was
included as an alternative.
There is a private road through the forest to the bunker
site so we were able to get the coach very close to the
bunker which to the untrained eye is now invisible in the
forest. We walked a short distance and then climbed up
onto a ridge which was, in fact, the top of one of the wing
bunkers. At the far end of the ridge one of the emergency
exits had been reopened and we were able to drop down
into the bunker with the help of an old ladder which was
found inside.
We had been pre-wamed to bring face masks due to the
internal condition of the bunker, for not only is there
asbestos everywhere but also dioxins and furans given
off when the insulation was burnt off the wiring. Once
everybody was adequately dressed for the occasion we
proceeded through the bunker. Being such a large and
complex bunker most people walked round at their own
pace on the strict instructions that we had to be out by
4pm.
One of the many stripped plant rooms at Mohlau.
The west wing bunker is on two levels with stairways at
each end. Most of the rooms appeared to have contained
equipment or plant most of which has now been removed.
At the east end of the bunker there is a system of airlocks
and decontamination rooms from where a tunnel runs east
to the upper floor of the main bunker where there is a
blast door and further decontamination rooms.
Progress is at times difficult along the corridors on both
floors following the removal of the floorboards and the
stripping of the wiring beneath. Most of the rooms are
empty apart from engine beds and the metal framework
for supporting machinery and plant. On the lower floor,
the largest room in the bunker was clearly used for burning
the insulation of cables and is completely burnt out.
On the upper floor of the east side of the bunker there is
a further exit through decontamination rooms and another
blast door; this leads to a long tunnel that eventually ends
in a blockage. Part way along this tunnel a further tunnel
branches to the south passing through further
decontamination rooms into the south wing bunker which
is identical in size and construction to the west wing.
This bunker is generally clean and free from
contamination. A few rooms have had equipment or plant
but most of the rooms appear to have been used as offices.
At the south end a further blast door leads to a blocked
exit. There are some signs, all in Russian, in various
rooms throughout the bunker.
Everybody was out of the bunker on time; the last to
emerge was our coach driver, Andy Becker, who had been
in the bunker with an attractive young lady reporter keen
to write a story on bunkers. Andy knows nothing about
this bunker in particular or bunkers in general so I can
only guess at what they were getting up to underground
for four hours. Gives a whole new meaning to
subterranean exploration!
We overnighted in Halberstadt before the long drive back
to Calais the following day. It was a tiring but thoroughly
enjoyable week; the pace was slightly slower than the
inaugural tour in 2001 with a maximum of two bunkers
per day, most of which were museum sites and easy going
but I know everyone had a good time and we are all
looking forward to the next tour. Mike and Robin are
both very adamant that there won’t be another tour on
this scale but that’s what Mike said on the first tour in
2001 and I’ve been back to East Germany with Mike
every year since on much smaller tours - so never say
never!
Sources:
Notes supplied by Mike Barton
Notes from Paul Sowan on Machern, Garzau and
Hamekop visited in 2001
Bunker museum web sites:
Machern & Runde Ecke http://www.runde-ecke-
leipzig.de/cms/ (includes poor English version)
Kossa http://www.bunker-kossa.de/
Kolkwitz http://www.kbf-gs31 .de/intro.html
Garzau http://www.outdoor-sports-paintball.de/bunker/
home/index.htm
Wollenberg http://www.bunker-wollenberg.de/
Hamekop http://www.atombunker-16-102.de/ (includes
one page in English)
Ladeburg http://www.beepworld.de/members77/bitti62/
(includes one page in English)
All photos by Nick Catford unless stated.
35
Colonel Stephens’ Light Railways and Tunnels
Paul W. Sowan
Colonel Holman Fred Stephens [ 1868 1931] operated a series
of light railways (many of them authorised under the Light
Railways Act, 1896) throughout the southern half of England
and parts of Wales and the Welsh Borders, all controlled from
his office at Tonbridge in Kent Numerous others such were
projected but never built.
Notoriously cheaply constructed and operated, the majority of
these lines were laid on flat ground, calling for minimal
earthworks. He has only two railway tunnels to his name, one of
them half-completed, the other never commenced.
Golgotha Tunnel west portal in April 2008.
t he Golgotha tunnel on the East Kent Eight Railway
The East Kent Light Railway, opened in 1911, was projected
primarily to serve the freight needs of the Kent coalfield, although
subsequently passengers were also conveyed between
Shepherdswell, on the London, Chatham & Dover Railway’s
Canterbury to Dover main line, to a junction at Eastry, from
w hence ran lines to Richborough Port and Canterbury Road
(some 6 miles short of Canterbury.) Anumber of collieries (such
as Wingham at TR 2557 and Woodnesborough at TR 2956),
partially developed in the district, failed before production
commenced, although that at Tilmanstone (TR 2850) sent coal
to the docks at Dover via the EKLR and the main line, at least
until the mine short-circuited this route when it constructed an
independent overhead conveyor system direct from the pit head
to the Eastern Docks (via its own twin tunnels through the chalk
cliffs, the bricked-up entrances to which can be seen from the
ferry terminal).
The line from Shepherdswell (TR 2548) to Eythome (TR 2849)
was to have run across flat land around a small hill, but
disagreements with a landowner led to Stephens driving his only
tunnel, the 550 yards Golgotha tunnel (TR 265488 - TR 269490)
between those two stations.
This, approached from Shepherdswell via quite a deep cutting,
was planned to be a single bore twin-track tunnel, and was
equipped with appropriately wide portals. However, to save on
costs (the hallmark of Stephens’ lines) only half the chalk was
excavated and a single track laid through the opened-out western
side of the structure. The line through this tunnel opened for
business in 1912, but was closed (by then operating freight only)
in 1987. It has subsequently been reopened and is now used for
trains operated by a railway preservation society - the East Kent
Railway - based at Shepherdswell, running standard gauge trains
through the tunnel to Eythome and back.
To save costs only half the chalk was excavated. The remaining
chalk could be removed if the line through the tunnel was ever
doubled. This view is just iaside the west portal in June 1994.
The intended Iatsfield tunnel on the proposed but never built
Southern Heights Light Railway
Among the numerous intended lines that were never built,
Stephens in the 1920s backed the so-called Southern Heights
Light Railway which was to have taken a circuitous and in places
steeply graded route over the North Downs, from the existing
Sanderstead station on the Croydon to Oxted line, to the existing
Orpington station on the line from London to Tonbridge. It was
intended to work this by third-rail electric traias to be operated
by the Southern Railway, these being capable of the envisaged
gradients. There would have been intermediate stations (from
west to east) at Mitchley Wood, Hatnsey Green (near
Warlingham), Chelsham (for Warlingham), and thence via a
tunnel to Tatsfield, Westerham Hill, Cudham & Biggin Hill,
Downe & Kcston, and Green Street Green (for Famborough.)
The thinking behind this plan was to encourage the spread of
suburbia southwards from Croydon and Bromley, much as the
Metropolitan Railway had done to the north and west of London.
Plans made in or around 1928 were subject to much debate, but
on Stephens’ death in 1931 no further progress was made.
Other inter-war proposals to expand the railway net and
suburbanisation south of London were more successful. The
line from Wimbledon via West Sutton to Sutton, opened
throughout in 1929 -1930, includes a steeply graded deep chalk
cutting on the approach to Sutton. The intended line from
Motspur Park to Leatherhead was completed and opened for
traffic only as far as Chessington South in the years 1938 - 39,
but never completed southwards after World War 11. Thus there
still stands a length of abandoned embankment beyond the
tenninus.
36
Underground Darwin and the Second World War
Martin Dixon
The Bombing of Darwin
Almost everyone has heard of the Japanese attack on Pearl
Harbour that took place on December 7 1941. What far
fewer people realise (even in Australia) is that the Japanese
fleet responsible for the attack later headed southwest and
on February 19 1942 launched a devastating attack on
Darwin. Darwin, on the north coast of Australia and capital
of the Northern Territory, was an important staging post in
supplying Allied troops in the southwest Pacific. During the
attack ten ships were sunk in the harbour and many others
damaged. What little air cover there had been mostly
destroyed on the ground and over 240 people were killed. It
is said that more tons of bombs were dropped in this initial
raid than were dropped at Pearl Harbour.
This first raid happened just a few days after the Allied
surrender in Singapore and the relentless progress of the
Japanese across the Pacific posed a huge threat to the
Australian mainland. Darwin suffered a further 62 air raids
in the following 20 months. Much of the Allied shipping
was dispersed around other Australian ports but a large
number of airfields were built in the area, and troops
numbered in the hundreds of thousands. Australian troops
returning from the European theatre were supported in
particular by US Forces. The defences at Darwin were
significantly increased including the building of a number
of underground installations, some of which we visited on a
recent trip to Australia. The four Japanese aircraft carriers
that took part in the initial air attack on Darwin were later
sunk in the Battle of Midway in June 1942.
RAAF Explosives Storage
We first drove to the outskirts of Darwin to what is now the
Charles Darwin National Park. This has been established
on what was one of a number of dispersed explosive,
ammunition and bomb storage facilities for the Royal
Australian Air Force. The site was constructed in 1944 and
in use until the mid 1980s. It consists of 12 concrete semi¬
underground bunkers, built into the natural contours,
Store 8 at the RAAF Explosives Store
protected by natural rock and covered over with earth and
vegetation. Each bunker was protected by hose reel and
standalone fire extinguishers, evidence of which remains.
One of the bunkers has been laid out with Second World
War displays and material and the structures all appear to
be in good shape.
It is pleasing to see the military structures remain well
maintained alongside natural features as part of the Australian
National Park system. Indeed, they are listed as Heritage
structures as are a few other associated buildings (probably
providing accommodation, test and assembly facilities). The
site was once serviced by a narrow-gauge railway. One of
the shelters has evidence of 12.7mm projectiles, attributed
to Japanese strafing. We didn’t have time to locate this,
partially due to attacks by the local ‘sand flies’ (similar to
Scottish midges and just as persistent).
East Point Command Post and Gun Emplacements
Several gun emplacements were constructed to protect
Darwin harbour and one of these - at East Point - is
particularly accessible. It is located within what is now East
Replica 9.2 inch gun at East Point Battery
Point Reserve - a 200-hectare area managed by Darwin
City Council. The military remains are on Australia’s
Register of National Estate and represent the last fortress
built in Australia in what is its only battleground. It is again
commendable the extent to which recreational activities co¬
exist with the built environment so harmoniously. The site
was home to both 6 inch and 9.2 inch emplacements and
associated control and storage buildings. The main command
post bunker operates as a museum and includes a wide range
of artefacts and memorabilia. There is also a well put together
film of the events of the Second World War as they affected
Darwin.
The displays include the ranging tables for both the 6 and
9.2 inch batteries which are in good condition. An additional
entry has been cut into the bunker for tourist access. As well
as underground storage associated with each gun, there are
Underground Magazine at East Point Battery
also underground ammunition stores with only their
ventilators visible. One of the 9.2 inch sites, which is
reminiscent of contemporary Atlantic Wall structures, has
had a fibreglass replica of the gun installed which is a nice
touch. The original gun cost 284,000 Australian pounds and
the scrap value was just 550 Australian pounds. In the
ultimate of ironies the guns were scrapped in 1959 to the
Japanese Fujita salvage company....
Underground Oil Storage tunnels
In an air raid in 16 June 1942, oil storage tanks around the
harbour at Darwin were set on fire. Of the original eleven
tanks, dating from 1924, seven were totally destroyed. By
November 1942 a decision was made to construct eight
Main entrance to Oil Storage Tunnel complex
(large pipe on left is recent air-handling)
underground oil storage tunnels, of which five were eventually
completed. Access tunnels with a horseshoe-shaped cross-
section were built from the dock level back into the higher
ground on which the main city of Darwin stands. Dug using
hand-held pneumatic picks, these access tunnels are around
2 metres high and lined in concrete and steel. Oil pipes, vents
and air-handling ducts still run along the tunnels. The oil
storage tunnels themselves lead off from deeper inside the
complex. They have a cross-section of 4.5 metres in width
and 5.4 metres in height and vary in length between 77 and
184 metres. In total they had a capacity of around 15 million
litres of fuel oil. Each of the tunnels was lined with concrete
and an inner tank of welded steel fitted within.
The tunnels were completed too late to be used for their
intended purpose but two of the tunnels (numbers 5 and 6)
were used in the 1950s for the storage of jet fuel (kerosene).
In 1992 - 50 years after the initial bombing raids - the tunnels
were opened as a tourist attraction. It is possible to enter
Oil Storage Tunnel number 5(171 metres long)
storage tank 5 along an access tunnel which is around 50
metres long. An entrance has been cut into the storage tunnel
itself and the full length can be explored. The steel lining
exists except at floor level where it has been removed for
safety. The concrete floor clearly shows a water drainage
channel (the tunnels continue to suffer water ingress,
particularly after heavy rain of which Darwin has lots).
Photos of the construction and of Darwin in the Second World
War line the tank. The oil filling and extract pipes can still
be clearly seen though the pumps which lived in a lobby
area outside each tank have been scrapped. It is also possible
to view storage tank number 6 though entry to this is not
possible.
Darwin suffered the catastrophic Typhoon Tracy on
Christmas Day in 1974. [As an aside a world record was set
when Qantas loaded 673 passengers on a Boeing 747 during
the subsequent evacuation.] Many of the surface buildings
were destroyed and so today Darwin has a modem and fresh
feel. Its underground structures fared better and Darwin is
to be congratulated for preserving and presenting this
heritage.
All photos by Martin Dixon
38
Ghost Metros of Belgium
Keith Ward
There is a fascination with closed stations and lines on
the world famous London Underground, Paris Metro and
New York Subway systems which have many closed
stations and lines. However a lot of the smaller metro
systems have their own interesting odds and ends. One of
the most fascinating countries for this is Belgium, where
similar indecisive planning to the UK has resulted in a
number of ‘white elephant’ schemes, most notably the
Charleroi light metro.
Charleroi Light Metro
This scheme, in the planning since the 1960s, was to
replace the local tram network (part of the vast Vicinal
system whose inter-urban lines had criss-crossed Belgium
until succumbing to buses) with a subway and elevated
metro system. The Charleroi area and interurban route
90 to Anderlues and La Louviere were incorporated in
the light metro scheme.
The scheme came to fruition in 1984 with construction
of a vast four-platform semi-underground station at Beaux
Arts in the centre of Charleroi. Many street tracks were
transferred to new concrete viaduct alignments with vast
stations and infrastructure. Charleroi was a major steel
production area heavily hit by the recession and this
scheme was seen as a stimulus for growth which
unfortunately didn’t happen. The trams remained empty;
the small two-car BN light rail cars delivered for the
scheme looked out of place in the vast empty stations.
The main components of the scheme were two
underground and elevated new Metro lines to Chatelet
and Gilly. These lines were built with the usual vast
infrastructure and in most cases the track was laid but
never opened. Now the stations are the playground of
graffiti artists who walk through the weed-strewn track.
In some places the catenary masts were put up but the
track never laid.
Station Sart Culpart Station on the Gilly line of the Metro
Leger Charleroi (Charleroi Subway) was never completed,
although there are still plans to open the station.
In May 1990 1 visited Charleroi and without the help of
the web was unaware of the unopened sections. However
I visited Beaux Arts station to ride the interurban metro
to La Louviere. On a Saturday afternoon the vast station
was deserted until the hourly tram arrived - a modem BN
car. 1 joined about six passengers as we whisked through
the vast stations and along the impressive concrete
viaduct. Not a single passenger was picked up until we
reached Anderlues depot where myself and the other six
alighted allowing one old lady to board for Louviere! Not
surprisingly the service to La Louviere was cut back in
the early 1990s to Anderlues which enjoys a 30 min
service.
Beaux Arts Station is an underground four-platfonn station
in the centre of Charleroi. There is an underground loop
line to take trains from one side of the station to another.
This is the most lavishly built station on the light metro.
The line from Anderlues to the start of the metro alignment
is classic Vicinal single track roadside with automatic
signals that only light up when the trams are in section.
At one point the single track suddenly swings onto the
massive concrete viaduct and onto quality infrastructure
and double track. As part of the scheme many tram routes
were temporarily replaced by buses but the trams never
returned. Politicians talk about completing the Metro from
time to time but nothing happens apart from the closed
stations getting further graffiti. Many websites feature
this Metro graffiti.
On my visit 1 found Charleroi to be a very down-at-heel
town and there cannot be any justification to open the
Metro further unless justifying the millions already spent
on the first stage of scheme.
Liege Metro
This is more bizarre than Charleroi in that there are so
many stories circulating that it’s become an urban legend.
In the early 60s plans were made to put trams in a subway
in the centre of the city. Some cars had destination blinds
created for the subway (whence the legend!) but a change
in policy saw the trams ousted by buses in 1967. In the
late 1970s plans for a 22-station VAL (French style
automated metro as in Lille/Lyon) came to nothing
although some short tunnels were partly built. Belgium’s
preoccupation with roads saw a number of road tunnels
built and one of the VAL tunnels was converted to an
underground garage. The scheme kept rearing its head
but nothing happened. Finally, in 2006, part of the VAL
tunnel (according to the press release) was converted into
a bus tunnel to serve a new central bus station. There is
also a busway from the main rail station to the town centre
which allegedly uses the alignment reserved for the VAL,
although this is on the surface. There are supposedly two
complete stations built (this is shallow sub-surface
construction) with subway entrances. Perhaps we should
have a Sub Brit recce to find out the truth!
Antwerpen pre-Metro
In Brussels and Antwerp as in many German cities, the
trams were put in subways in the town centre with
conversion planned at a later date to full Metro operation.
Some stations had short low platforms for trams with
high platforms next to them for the future Metro fenced
off. In Brussels a full metro system was developed using
some of the ‘pre-Metro’ tunnels however some tram-only
subways remain in use solely by trams.
Antwerp operates an extensive tramway network and from
1975 the central area track was put underground with a
number of underground stations. However a number of
stations (7 in all) were built underneath the tram stations.
During construction a two-level box was built with trams
on top and future Metro station below; these Metro
stations were just empty shells. A new project Pegasus is
being planned which will see the low-level stations opened
as tram stations to serve three new fast tram routes to the
suburbs. In view of the complicated politics of Belgium
whether it happens is anybody’s guess!
Heyzel Tram Subway, Brussels
The City trams terminate at an impressive four-platform
station at the Heyzel stadium and exhibition centre.
However the former Vicinal tramways had a lengthy tram
subway with two shallow underground stations running
through the grounds. This line closed in 1967, with the
non-subway section taken over by city trams, but in 1994
the subway was reopened as an extension to the extensive
city tram network. 1 was able to walk the subway in 1991
when it was derelict.
Ghent Tram Subway
There were proposals from the 1950s onwards to use old
canal beds as the basis for tram subways in city centre.
As far as is known, nothing was ever built.
Malmo’s “Crossrail”
Robin Cherry
There is a new tunnel (more precisely two parallel tunnels,
like the Channel tunnel) being built under the city of
Malmo in southern Sweden. In 2011, the first scheduled
train will leave the new underground station at Malmo
Central. It will travel 25 metres below ground, through
the new tunnel, via Triangeln Station al 1 the way to Hyl 1 ie
Station. After 6 km in a tunnel, it will reach the surface
in southern Malmo. The railway will divide here and go
west towards the Oresund Bridge, south towards
Trelleborg and east towards Ystad.
At present, Malmo Central Station is a dead-end and trains
going onward from here have to change direction which
causes delay. The plan is for 17 km of railway above and
below ground, the two parallel tunnels having an inner
diameter of 7.9 metres. The distance between the tunnels
will vary between 10 and 30 m and they will be linked by
13 cross/evacuation tunnels at 300 to 400 metre intervals.
In addition, there will be two access shafts to the surface.
Including Triangeln Station, that means there will be
access to the surface for every quarter of the tunnel.
At Slottsparken (Castle park) at Kung Oscars vag today,
next to nothing is visible. All that remains of the
construction site is a small hut that that has been there
for some time and will be replaced by a more permanent
access point. Restoring groundwork has been in progress
for a while and is almost finished, but there is still activity
underground. Stairs will provide access from ground level
to the tunnels and will join a cross passage between the
two tunnels. This is one of the rescue service access points
in case of a future accident in the tunnel.
Source: Observation and website: www.malmotunnel.com
Building a station under a road junction in Malmo called
'Triangeln' (The Triangle). Photo by Klas Andersson
40
Another weekend on the London Underground
Nick Catford
When Sub Brit member Philip Lindhurst first mentioned
that he was planning to organise a visit to some disused
tube stations I don’tthink he had any idea just how popular
this was likely to be. The first excursion on 19 January
2008 attracted 22 members who answered what was
almost a throwaway post to the e-mail list the previous
October stating that he “might be able to arrange
something”; so vague in fact that many members
dismissed it. It was soon clear however that Philip could
deliver the goods, so when a second excursion was
arranged for weekend 1 - 2 March he was inundated with
requests for a place. I managed to go along on both days.
Highgate Station
Our first site was Highgate Station, probably the best
preserved closed station anywhere in the London area.
Highgate High Level Station in the 1950s
- note the London Transport roundel.
The Edgware, Highgate & London Railway (EH&LR)
obtained an Act in 1862 to build a line from a junction
with the Great Northern Railway (GNR) at Seven Sisters
Road (now Finsbury Park) to Edgware. The following
year, the Midland Railway received authority to build a
line between Bedford and St. Pancras which would
provide a quicker route into central London from the Mill
Hill area. To improve the prospects of their Edgware line,
the EH & LR proposed a branch from Highgate to
Muswell Hill (serving the new Alexandra Palace leisure
complex) with an extension of the main line from Edgware
to Watford.
Both proposals were approved by Parliament in 1864, as
was a further branch from Finchley to High Barnet in
1866. In 1866 a further act was obtained by the
independent Muswell Hill & Palace Railway to extend
the branch from Muswell Hill to a terminus adjoining
Alexandra Palace.
The ‘main line’ between Seven Sisters Road and Edgware
proved more costly than expected and shortly before
completion the local company was taken over by the Great
Northern who opened the line on 22nd August 1867. There
were intermediate stations at Crouch End, Highgate, East
Highgate High Level Station in May 1968.
Photo by Nick Catford
End Finchley, Finchley, Hendon and Mill Hill; the
extension to Watford was never built. On 1 April 1872
the High Barnet branch was opened with the Alexandra
Palace branch opening on 24 May 1873.
In 1935 the London Passenger Transport Board
announced their ‘New Works Plan’ which included a
proposal to take over the ex-GNR line between Finsbury
Park and Edgware and High Barnet, including the
Alexandra Palace branch. These would be incorporated
into the Northern Line with a new connection with the
Northern City line at Finsbury Park providing a fast and
frequent service of electric trains into central London.
The ‘New Works Plan’ was adopted and shortly before
the start of WW2 the lines began to appear on
underground maps. It was expected that Northern Line
trains would be running into Alexandra Palace by 1940.
Work on the electrification and new infrastructure started
alongside the steam service which continued to operate.
With the start of WW2, work on the electrification of the
Alexandra Palace branch ceased in 1940 although some
work continued north of Highgate on the Edgware and
High Barnet lines. London Transport had every intention
of completing their ‘New Works Plan’ and although
several lines (including the Alexandra Palace branch) were
shown ‘under construction’ on some underground maps
until 1950, work never restarted.
With the opening of the Northern Line Extension from
Archway to East Finchley on 3 July 1939, the steam trains
which formerly served High Barnet and Edgware were
cut back to East Finchley and after March 1941 all trains
were diverted to Alexandra Palace instead but this
improvement in service was short lived with all through
trains being withdrawn and replaced by a limited shuttle.
Through services to Kings Cross were reinstated after
the war but were suspended to save coal between 29
October 1951 and 7 January 1952. After local pressure a
Highgate High Level Station in 2008.
Photo by Nick Catford
peak hour only service using Victorian locomotives and
ancient rolling stock was reinstated but it was clear that
final closure couldn’t be held off for long and closure
was announced in 1953 as the number of passengers
travelling on the line didn’t justify its electrification. A
shuttle service continued to run until the 3 July 1954 when
all stations closed to passenger traffic.
Highgate Station was sited in a deep cutting immediately
west of the Highgate East tunnels and when opened in
1867 had two side platforms, with the main station
building on the ‘down’ (south) side at the end of an
approach road and a waiting shelter on the ‘up side’. A
passing loop was provided between the running tracks to
accommodate trains that terminated at Highgate. A
covered footbridge ran from the upper floor of the entrance
building to a brick ‘tower’ on the up platform adjacent to
the shelter.Immediately west of the station the line entered
the Highgate West tunnels. In c.1868 an additional
entrance was provided high above the station on Archway
Road.
The station was rebuilt during the 1880s with a new island
platform on the site of the former passing loop, with a
new booking office in the middle of the footbridge; the
two side platforms and the original buildings were disused
at this time. As part of the 1935 ‘New Works Plan’ to
The Sub Brit party about to enter the east tunnel.
Photo by Nick Catford
incorporate the Edgware, High Barnet and Alexandra
Palace lines into the London Transport network the station
was once again rebuilt with a new brick platform building.
A short section of the 1880s building, including toilets
and the canopy, was retained at the east end. New
entrances were provided on Archway Road and Priory
Gardens on the north side of the line, with a stairway
down from the platform to the Northern Line concourse
below. No further work on the station took place after
the war, with the steam service retained until closure in
1954.
Highgate now has the distinction of being the best
preserved closed station in Greater London. Although
the track was lifted in the early 1970s, the platform and
station buildings are intact, including the platfonn canopy.
The original side platforms of 1867 are also intact, as is
the original timber-faced station building.
Highgate west tunnel; this is what we would have seen
had we been able to get in. Photo by Nick Catford
The line between Finsbury Park and the south portal of
Highgate East tunnel was reopened in 1984 as a footpath
and cycleway called Parkland Walk. Parkland Walk
continues a short distance beyond Highgate West tunnel,
but the tunnels are securely grilled and the deep cutting
and station remain the property of Transport for London;
the whole area is surrounded by a high fence with no
public access.
There is still direct access onto the platform with stairs
up from the Northern line concourse but our point of
entry was a narrow gate alongside the station entrance in
Priory Gardens. Having collected the keys from the
station, 40 Sub Brit members made their way up onto the
platfonn. Until recently the site was heavily overgrown,
but following tree and shrub clearance early in 2007 the
station is now easily seen.
The platform buildings built in 1940/1 for the Northern
Line trains that never came are largely intact although in
recent years they have been painted brown. On the wall,
the positions of the London Transport roundels are still
clearly visible. The waiting room windows have lost their
glass but this was removed after closure to avoid later
42
vandalism. In the middle of the platform, steps lead down
to the Northern Line concourse which is immediately
below the high level station. There is a staff mess room
at the bottom of the stairs and staff using this room can
look out of a window up the stairs to the abandoned
station. Both side platforms also remain intact, as does
the original 1867 station building which stands on the up
platform and is now a private residence. The track bed
at the west end of the station has been infilled to platform
level and above the Northern Line concourse, corrugated
metal sheeting has been placed across the track to prevent
water seepage onto the concourse below; this has been a
serious problem in the past, especially before the
undergrowth was cleared.
Most of the cable runs built for the electrification are
still in place along the side of the cutting. Both tunnels
have been sealed with metal grilles with locked gates; we
had keys to both tunnels but the lock at the west end was
jammed. We were, however, able to open and explore the
Highgate East tunnel.
Highgate is the only disused station on the underground
network (albeit not a tube station) where public access is
still relatively easy. There are regular public open days
and even in recent times a request to the station manager
for access has produced favourable results. For a full
history of Highgate Station and the abortive Northern
Heights scheme see http://www.subbrit.org.uk/sbsites/
stations/h/highgate/index.shtml.
From Highgate we caught the Northern Line to Kentish
Town for a repeat visit to South Kentish Town Station
which was visited on Philip’s first excursion on 19
January. With so many more people attending this time,
it was decided to repeat this station for those that missed
it the first time round. Once again our guide was Camden
Town Group Station Manager Margaret Rojugbokan who
was clearly impressed by the enthusiasm and knowledge
of the visitors. For a full report on South Kentish Town
see Subterranea 16.
Waterloo Station
The WW2 railway telephone exchange at Waterloo was
located in this room. Photo by Nick Catford
Staying on the Northern Line, we made our way to
Waterloo Station to look at some of the voids beneath the
main line station; our guide was Ian Liscoe from Network
Rail. Unfortunately, essential construction work to
provide new access to the underground was underway
which limited the areas that could be visited easily, but
we saw a number of interesting features including several
brick arched rooms that have been used for storage.
Within this area a number of brick and breeze block
buildings have been erected; these date from WW2 and
could have been used as air raid shelters or offices.
One area that has been used for storage in recent times
was originally a railway telephone exchange during WW2
with gas tight doors still in place at the entrance.
We were hoping to see an area that had been described as
a first aid post and hospital during WW2 but was in fact
used as a marshalling area for troops travelling to
Portsmouth and Southampton docks - hence the WW2
vintage signs pointing to toilets etc. However, we didn’t
get to see it because a key was broken in a lock and despite
the best efforts of a number of Network Rail staff the
door could not be opened.
Moorgate Station
From Waterloo, it was back on the Northern Line to
Moorgate Station which has a complex and interesting
history. Although the station has never been closed it has
a number of abandoned parts linked to the abortive
Lothbury extension to the Great Northern and City line
in 1902 and the modernisation of the station between
1922-1924.
City & South London
Subway from the lower lift landing. Photo by Nick Catford
The City and South London Railway (C&SLR) opened
between Stockwell and King William Street on 18
December 1890 and the new line was an immediate
success, with an average of 15,000 passengers a day; it
was difficult for the new terminus at King William Street
to handle that volume of traffic. Because of its position
it was not possible to extend the line and in 1891 a Bill
43
was put before parliament for a ‘branch line’ leaving the
existing line short of King William Street station and
running to the Angel via Bank and Moorgate Street.
The Bill failed but a further Bill was immediately prepared
proposing a new station at London Bridge from where
twin tunnels would run under the Thames to a new station
at Lombard Street and then on to the Angel. After some
delay this Bill was passed in 1893 and in 1895 the
company directors agreed to start work on the extension
as far as Moorgate Street, with an intermediate station at
Bank. Moorgate Street would become a temporary
terminus until the line was extended to Angel at a later
date.
The original stations on the line had island platforms,
but the new stations at London Bridge, Bank and
Moorgate Street had two station tunnels at the same level
joined by cross passages. At Moorgate Street there was a
scissors crossing in a double tunnel just short of the station
with a signal box on girders over the line. The three
stations were provided with electric lifts. King William
Street closed on 24 February 1900 and the extension to
Moorgate Street opened the following day, a Sunday. On
17 November 1901 the line was further extended to Old
Street, City Road and Angel and on 11 May 1907 the line
was extended once again to Kings Cross and Euston.
There are two landings at the top of the emergency stairs.
This subway, now blocked after a few yards, led to the sub
surface Metropolitan Line platforms. Photo by Nick Catford
In 1913 the C & SLR came under the control of the
London Electric Railway (LER) and a Bill was
immediately put before Parliament to enlarge the tunnels.
This would bring them to the standard of other tube lines
in London which were now also under the control of the
LER. Some of the tunnels were 10’ 2" in diameter whilst
others were 10’ 6".
Work on the reconstruction of the line had only reached a
planning stage when it was stopped at the outbreak of
War in 1914 and didn’t restart until the August 1922 when
the line between Euston and Moorgate Street was closed.
The old tunnel segments were reused, with four extra
segments being added giving a slightly irregular shape
but close to the 11’ 8' underground standard.
The northern section of the line reopened on 20 April
1924 with through trains running between Moorgate (the
station was renamed from Moorgate Street on reopening)
and Hendon; City Road which had closed with the other
stations on the northern section was not reopened. The
southern part of the line was reopened on 1 December
1924. Apart from the enlargement of the running tunnels,
a number of stations were modernised; all but seven of
the stations (including Moorgate) were equipped with
escalators and the redundant lifts and associated subways
were taken out of use.
The Great Northern & City Railway and the extension
to Lothbury
The Great Northern & City Railway was intended to allow
mainline trains of the Great Northern Railway to run from
Finsbury Park directly into the City of London at
Moorgate. The tubes were made large enough to take a
main-line train, unlike those of the other tube railways
being built in London at the time. The internal diameter
was 16 feet compared with less than 12 feet for the Central
London Railway and smaller still for the original City &
South London Railway tunnels. However, the Great
Northern was lukewarm about the scheme and the
GN&CR had to settle for a northern terminus in tube
underneath Finsbury Park station.
In November 1901, the Great Northern & City Railway
published a notice of its intention to present a private bill
to parliament seeking permission for an extension of the
company’s tunnels then under construction between
Finsbury Park and Moorgate. The bill proposed a short,
270yd southward continuation of the line to Lothbury
which would become the southern terminus in place of
Moorgate Street as originally planned. The bill received
Royal Assent on 8 August 1902 as the Great Northern
and City Railway Act, 1902.
The Greathead tunnelling shield left in place at Moorgate
Station in 1904 when the Lothbury extension of the Great
Northern & City Line was abandoned. Photo by Nick Catford
44
The station was to have been entirely below ground with
access to the surface by lift and pedestrian subways to
the comers of the junction of Lothbury, Gresham Street,
Moorgate and Princes Street. One peculiarity of the
scheme was that the running tunnels between Moorgate
Street and Lothbury stations were to have been shorter
than the platform tunnels at the two stations; meaning
that the front of a full length train would have arrived at
Lothbury before the end had left Moorgate. The line could
not be extended any further south due to the proximity of
the City & South London Railway’s tunnels under Princes
Street. Work began on the Moorgate to Lothbury section
but was abandoned almost immediately, with the
Greathead tunnelling shield left in place at the end of the
southbound tunnel just south of Moorgate station. The
line opened to Moorgate on 14 February 1904.
The Great Northern & City Railway (GN & CR) Act,
1907, which received assent on 26 July 1907, granted
additional time for the construction of the Lothbury
extension but the money could not be raised and no further
work was done.
The GN&CR was bought by the Metropolitan (‘Met’)
Railway in 1913; the Met made various plans to link it to
some point on the Circle line, but this never came to
fruition. The Met also revived the Lothbury station
proposal in a modified form as part of a number of plans
to connect the GN&CR to the Waterloo & City Railway
(W&CR) and the Met itself. When the Metropolitan
Railway Act was passed on 15 August 1913, neither of
the proposals for connections were permitted, but
Lothbury station was allowed, again as the terminus
station. In 1914, the Met introduced revised proposals
for its connections between the GN&CR and the Met
and the W&CR which removed the need for a station at
Lothbury. Although these connections were never made,
Lothbury station was not revived again.
After the Metropolitan was nationalised (along with the
other underground lines) in 1933, the line was renamed
the Northern City Line and became part of the Edgware-
Morden Line (which became the Northern line in 1937)
for operational purposes. As part of London
Underground’s ‘New Works’ programme, plans were
made to connect the Northern City Line to the surface at
Finsbury Park, and then join suburban branches to
Alexandra Palace, High Barnet and Edgware as described
earlier.
When the ‘Northern Heights’ plan was dropped after the
war, the Northern City Line remained isolated from the
rest of the network. Services were cut back from Finsbury
Park to Drayton Park in 1964 to make room for the
Victoria line to use the platforms at Finsbury Park (low
level). In 1970, the line was renamed Northern Line
(Highbury Branch). The following year, an agreement
was made to transfer the line to British Rail and connect
it (as was intended by its original promoters) to the main
line at Finsbury Park. By running commuter trains to
Moorgate instead of King's Cross, congestion at King’s
Cross was relieved.
The last London Underground services ran in October
1975 and British Rail services commenced in August
1976. These BR services used the name ‘Great Northern
Electrics’. The track is now owned by Network Rail and
services to Hertford North are provided by First Capital
Connect. The name ‘Northern City Line’ has been revived
to refer to the subsurface part of the route.
Tour of Moorgate
Emergency stairs adjacent to the abandoned lifts
Photo by Nick Catford
Our guide at Moorgate was Customer Service Assistant
Martin Davis. From the concourse we made our way down
the emergency stairs towards the present ‘Great Northern
Electrics’ platforms. Nearing the bottom of the stairs, a
nondescript wooden door on our right opened onto the
abandoned subway to the lower lift landing that was taken
out of use in 1922; the subway is still used for ventilation
and is lit. The white tiled walls are grubby but still in
good condition with some signage including ‘Way out’,
‘To the City Line’ and ‘No Smoking’. There were two
lifts shafts, each with two lifts and an emergency spiral
staircase. The lifts have been removed but both shafts
are open and by looking up it was possible to see the
doors onto the upper lift landing. The shafts are still in
used for ventilation and one of the lift shafts has been
turned into a machinery room with ventilation plant,
electrical switchgear and a metal stairway down into the
lift well from where a short passage (well grilled!) led
into the Northern Line running tunnels. On the far side of
the lift shafts, a grimy, unlit subway curves away to the
left but is eventually blocked by a brick wall. This subway
clearly hasn’t been used since the lifts were taken out of
service in 1922 and although the brown tiles are still in
place, the floor has lifted in places.
Back on the lift landing, a wooden door opened onto
another grimy, unlit stairway up to a landing at the bottom
of the emergency spiral staircase. The spiral staircase
has been removed and replaced by a new metal stairway
which has, itself, clearly been out of use for many years.
The stairway goes up to two landings where short
subways are blocked at a point where they presumably
rejoin the existing subway network, the lower landing
led to the sub-surface Metropolitan Line platforms while
the upper landing led to the booking office. At the lower
of the two landings there is a sign fixed to the tiled wall
which says “To Metropolitan Railway for Aldgate, Essex
Road, Drayton Park, Farringdon Street, Finchley Road,
High Street Ken, Liverpool Street, Wembley Park”. Both
landings are hot and humid with no through ventilation.
Returning to the current emergency stairs we made our
way down to the Northern City line platforms 9 and 10.
Both tunnels extend for about 50 yards beyond the station.
These tunnels were part of the incomplete extension to
Lothbury, which was abandoned in 1903. The station was
the site of the infamous Moorgate train crash in 1975
when a southbound Northern City line train ploughed
into the buffers beyond the station killing 46 people and
injuring 74.
This subway originally led to the Metropolitan line platforms
but is now only used for ventilation. Photo by Nick Catford
We made our way along a walkway along one side of the
opposite tunnel where, at the end, the Greathead shield
was left in place when the extension was abandoned in
1903. The shield is still in situ and is in surprisingly good
condition. Just before the shield, a pedestrian bridge
crosses the track and enters the Moorgate sub-station
which is still in use and was not part of our visit.
We made our way back along the walkway and just before
the platform we turned left into a long abandoned
pedestrian subway that once led to the Metropolitan Line
platforms. The tiling is very dirty but it was still possible
to make out a number of old posters. The subway is now
used for ventilation with ventilation trunking suspended
from the ceiling at one side.
Part way along the subway there is a vertical shaft. It has
been suggested that this was another lift shaft, but it seems
more likely it was built for ventilation and there is no
evidence of lifts ever having been installed. At the end of
the subway there was a large fan filling the tunnel which,
luckily, was not working on this occasion.
It was now gone 6pm and we assumed that this was the
end of our visit to Moorgate, but Ian had more in store.
Having got special permission, we climbed back up the
emergency staircase and out on to the sub-surface
platforms comprising the Metropolitan Line and the First
Capital Connect service to Bedford. We walked along
one of the Bedford line platforms and along the track
(there is no service on a Saturday!) before descending a
ramp below track level. Having passed through a number
of low doorways we entered a series of plant rooms on
two levels; these contained pumps for de-watering the
Moorgate Spring. Our guide jokingly said they were going
to bottle it and sell it. After climbing a stairway back up
to track level we entered a ventilation plant room with
two huge fans for ventilating the Bedford line tunnels. A
further stairway led to a tunnel with a small grille door at
one end. Passing through the door we found ourselves at
ceiling level in one of the underground loading bays
beneath the Barbican Centre. A cleaner working below
seemed shocked when I emerged into the loading bay high
above his head.
It was now after 7pm so we made our way back to
Moorgate Station and home after a very enjoyable, albeit
tiring, day.
Holborn
46
Drawn by Tim Robinson
Numbers were a little depleted for the second day; our
first station was Holbom on the Piccadilly Line. In 1899
the Great Northern and Strand Railway (GNSR) Act of
Parliament authorised a line from Wood Green to
Stanhope Street on the north side of Aldwych, an area
that was under development following massive slum
clearance to the south of Holbom. Stations were to be
built at Wood Green, Hornsey, Harringay, Finsbury Park,
Holloway, Bingfield Street/York Road, Russell Square,
Holbom and Strand (later to be renamed Aldwych).
Platform 6 at Holbom a few days before closure in 1994.
Photo by Nick Catford
Finance for the new line was difficult to find and
eventually the scheme was taken over by an American
sponsor, Charles Tyson Yerkes, who was already
financing various other underground railway projects in
London, one of which was the Brompton and Piccadilly
Circus Railway. Yerkes decided that to make both schemes
financially viable they should be incorporated into one
line, which resulted in a further Act of Parliament in 1902
to extend the line from Piccadilly Circus to join with the
GNSR at Holbom. At the northern end, the line was to
be cut back to Finsbury Park and at Holbom the line to
Strand was to be built as a short spur. The main line
between Finsbury Park and Hammersmith opened on 3rd
December 1906
Platform 6 at Holbom in 2008. Photo by Nick Catford
The short section from Holbom to Strand was, however,
causing problems. On the surface the London County
Council (LCC) were keen that the station should blend in
with their new Kingsway development and underground
the railway company were unhappy with the track and
tunnel layout, which they felt, would prove restrictive.
Changes were proposed that required a 3rd Act of
Parliament, which was passed on 4 August 1905. The
Holbom to Strand line was to become self-contained, with
two platforms at Holbom instead of one as originally
proposed. A single trailing junction would link the branch
to the eastbound main line just north of the station to
facilitate stock movements. The second platform would
be a shorter bay platform, which would allow two
simultaneous services to run between Holbom & Strand.
The branch opened on 30 November 1907, 11 months
after the main line. The line was initially worked by a
two-car train shuttling in the eastbound tunnel with a
second train running in the westbound tunnel during rush
hours. Traffic was light from the opening day: bus and
tram services in the area were good, both Temple and
Holbom Stations were close enough to walk to and the
office development in the area did not progress as quickly
as expected.
The line still failed to attract passengers and after 1912
the service ran from the eastern platform at Holbom to
the western platform at Strand. In 1915 Strand station
was renamed Aldwych. Two years later the Sunday service
was withdrawn and the eastern line was abandoned
altogether and the track was lifted. For many years the
disused platforms at Holbom and Aldwych have been
used for testing architectural features, paints, tiles, lighting
and finishes.
Platform 5 at Holbom in 1995; the platform edge can just be
seen on the right side of the corridor. Photo by Nick Catford
47
During the war the bay platform at Holbom was converted
into offices by filling in the track bed to platform level,
partitioning the platform into small rooms and
constructing two levels with a narrow corridor running
along what was the platform edge; the upper level was
used as a dormitory. There was also a kitchen and canteen
at the southern end of the platform with steps down to
the former track bed from the end of the platform. The
short section of tunnel between the platform and the
junction was used as a workshop. Two separate telephone
exchanges (one Post Office and the other London
Transport) served the offices. Both were connected to
the London Transport automatic telephone system, the
Control Office at Leicester Square, the dispersed London
Transport Headquarters at Dover Street and the Railway
Committee headquarters at Down Street.
Platform 5 at Holbom in 2008; the two-level offices and hostel on
the right-hand side have now been demolished but the platfonn
edge can still be seen. The trackbed to the right of the edge line
has been filled up to platfonn level. Photo by Nick Catford
The service between Aldwych and Holbom was suspended
during the war with part of the line being used as a deep
level air raid shelter and the disused eastbound tunnel
used to house treasures from the British Museum,
including the Elgin Marbles.
The service resumed on 1 July 1946 with a peak hour
service Monday - Friday. Through the 1950s and into the
60s the disused bay platfonn was used as a staff hostel
for people who had lost their homes and more recently
has been used as a store for London University.
On 4 January 1993 it was announced that London
Underground Ltd. was proposing to close the line because
the lifts at Aldwych (which dated back to the line’s
opening) were worn out and needed replacing at a cost of
£3 million. This couldn’t be justified with only 450 people
using the station each day. The date set for closure was
2 April 1993 but after objections were received this date
was put back, with the last train finally running on 30
September 1994, when for the first time in its 87 year
history the platforms and the trains were crowded.
Since closure, Platfonn 6 at Holborn has been used for
testing new materials, signs and finishes and many of the
subways now carry a large amount of new cabling. The
platform still retains all of its signs and posters and a
portacabin has been erected at the end of the platform;
this is used as an engineers’ store. The line between
Holbom and Aldwych is still used by film crews who
require a station for a period drama; while the disused
Jubilee Line platform at Charing Cross is preferred by
film companies who want a modem underground station.
There have however been recent changes to Platfomi 5
at Holbom. This is accessed through an inconspicuous
grey door at the end of Platfonn 4 from where a short
corridor leads directly onto the old bay platfomi. At the
stub end of the bay, one section has been taken over by
the National Grid as a sub-station. Moving down the
platform, the wartime offices and donnitories above have
recently been removed and while the single level offices
on the right-hand side remain, they have been repainted.
It is still possible to see some of the original features: the
green and cream tiles are still in place including the tiled
name Holborn on one wall, but much of the tiling has
now been painted over. The platform edge is still clearly
visible although the track bed has now been brought up
to platfomi level. Beyond this area it is possible to walk
through the old workshop and out into the running tunnel.
Tour of Holbom
Having picked up the keys from the station manager we
made our way down to Platfomi 4 on the Piccadilly line
from where there was cross platform interchange with
Platfonn 6 for the Aldwych shuttle. For many years after
closure the cross passage was blocked by a metal grille,
so Piccadilly passengers could see through onto the
derelict platform but this has now been replaced by a
door.
Although the track is still occasionally used by film crews
and a train is stabled in the tunnel between Aldwych &
Holbom, the platfomi is used for the storage of pennanent
way materials and scaffolding with a portacabin at the
Crossover to the north of Holbom Station. Photo by Nick Catford
48
northern end. Like Aldwych the station is used to try out
new signs etc and at the time of our visit a number of
station signs and maps indicated that the station was now
on the Centra] Line, at track level it was still Holbom
Station but at higher level it had been transformed into
St. Paul’s! A small signalbox is still in place at the southern
end of the platform.
Stairs lead down to a subway to Platform 3 but this is
also blocked at the platform by a new door. Returning to
Platform 4 we made our way to the south end of the
platform where another door opened onto a narrow
corridor with locked rooms either side and at the end of
the corridor another door opened onto the long abandoned
Platform 5.
When Holbom was last visited by Sub Brit in August
1995 this area was unused and consisted of a narrow
walkway with offices on the right-hand side and two levels
of rooms on the left-hand side. This area is now in the
process of being refurbished; the rooms on the left have
now been dismantled and those on the right have been
painted including the brown and white tiled walls. In 1995
it was still possible to make out the word ‘Holbom’ which
was fired into the tiles but this has now been painted
over. New lighting has recently been installed and it would
appear that the platform area is being made ready for
some new use.
Beyond the platform, there is a heavy gas-proof door and
beyond that the former workshop before the tunnel opens
out onto the crossover where trains passed over from the
east side of the line to the west side before proceeding to
Aldwych. The disused tunnel leading to Aldwych is on
the far side of the track but as we only had permission to
visit Holbom we returned to the surface and made our
way to Monument Station on the District Line from
whence it was a short walk to King William Street, the
last site of the weekend.
King William Street
The early history of the City & South London Railway
has already been described.
The old city terminus was most awkwardly placed as
regards train mnning, as it faced almost due west and
curved sharply to the left under Swan Pier, crossing the
river under the upstream side of London Bridge. There
was no intermediate station between King William Street
and Borough, which meant that there was no interchange
station for London Bridge main line station. In the case
of the down line from King William Street this involved
a sharp curve and a gradient of 1 in 30 upon leaving the
station, while the up line was still steeper, 1 in 14, as the
up line had to cross over the down line. This was because
of a requirement that the tunnels should mn beneath roads
and not buildings.
The entrance to King William Street Station was
incorporated into an existing building at the comer of
King William Street and Arthur Street East (now
The island platform at King William Street in July 1930.
Note the signalbox standing on the platform and the two
semaphore signals in the foreground. Photo by Topical Press
Monument Street) with the company’s offices in the upper
floor and the booking hall in the ground floor. The station
was 75' below ground and was accessed by two hydraulic
lifts within a single shaft; there was also an emergency
spiral staircase.
Initially, the station was provided with a single track and
two side platforms, one for arrivals and the other for
departures. This unusual arrangement prevailed because
of the original proposal to use cable haulage required a
simple track layout.
By the time the 10’ 2" the diameter tunnels reached King
William Street they were side by side and opened into a
single 20ft high by 26ft wide bore, which had a 3ft lining
of brick, and was finished in white glazed tiling. A signal
box was provided at the Stockwell end.
Construction was difficult with regular subsidence due
to the waterlogged ground around the river but the tunnel
and station were eventually completed, with the official
opening by the Prince of Wales on 4 November 1890 and
the public service commencing on 18 December.
The station name could still be seen on the wall tiles
in July 1930. Photo by Topical Press
The new line was heavily used from the opening day and
the station layout quickly proved unsatisfactory. To
overcome this, a Bill was introduced into Parliament in
1882 to construct a new line from Borough to Moorgate
Street and abandon the unsuitable terminus. The Bill
received Royal Assent in 1883 but this was for a long
term solution. To alleviate the congestion problems in
the short term, surface facilities were improved by taking
a lease on an existing building in Arthur Street East for a
Ladies Room, Parcels Room and Left Luggage Office. A
plan to install a third lift was dropped because of cost.
With 15,000 passengers using the station daily,
improvements were also urgently required at platform
level so the single line was replaced by twin lines running
into an island platform which was completed by December
1895. A scissors crossing was added at the south end
allowing trains to use either line but this required a
shortening of the platform which could now only be used
by three-car trains.
Work on the extension to Moorgate Street started in 1896
and King William Street closed with the inauguration of
the new service from 25th February 1900; the station
and the tunnels running under the Thames to Borough
were abandoned. Initially no use was found for the tunnels
but as early as 1901 it was suggested they could be used
for cultivating mushrooms or as a bonded store. The
favoured solution was to use the tunnels to carry telephone
or electric cables but no user could be found. Initially
the track remained in place and was used to store empty
stock.
At the outbreak of war in 1914, there were fears that the
tunnels might be used by enemy agents and a thorough
search was undertaken before the track was removed and
the tunnels were sealed up. In 1923 the station was offered
for sale or lease and the Railway Magazine of September
1930 published a description of the station and its
remaining features stating that “The present means of
access is through what was formerly the emergency
staircase and this is reached from the cellar under 46
King William Street. Descending this gloomy circular
stairway by the light of two acetylene flares our party
reached the old platform level although the tracks have
been entirely and the platform partially removed. At the
platform level the station consists of a circular brick
tunnel with a centre platform and the site of the lines on
either side. Openings give access to the old lift shaft.
The shaft has been covered over and the top portion
used by shop premises. Remains of gas fixtures are a
reminder that the station was lighted by gas during the
first ten years of the railway's existence, electricity being
introduced gradually thereafter. The King William Street
station names are still in position in two or three places.
At the end of the platform is the remains of the signal
box still containing its 22 hand operated levers. Three
of the two-position semaphores are in position. With the
original position ofsignalling the headway of the trains
was about 3 ° minutes.
Beyond the station the brick tunnel ceases and the line
enters the two iron tubes. Our party proceeded along
the left hand tube. The point where the other tube crosses
over is easily noticed and the two tracks are connected
by an iron ladder. Further on we joined the other tube
by a narrow connecting passage on the left and returned
to the station. At the mouth of the tubes a much faded
board can still be deciphered notifying speed not to
exceed five miles per hour".
No 46 King William Street was eventually demolished
and in 1933 Regis House was built on the site. The 25'
diameter lift shaft was filled at this time but access to the
former station was retained using the emergency staircase
which was reached from the basement of Regis House.
There was little change until the outbreak of war in 1939.
The Southwark Shelter
On 11 November 1939, it was reported in the Evening
Star that work would start to convert the running tunnels
but not the station itself into a deep level public air raid
shelter. The work, which was expected to last three
months, would include the construction of eight entrances,
air conditioning plant, seats and first aid posts. This
announcement was somewhat premature, but the Minister
of Home Security had approved Southwark Council’s
proposal in principle. A rent of £ 100 per year was agreed
with the London Passenger Transport Board and work
started on conversion of the tunnels into a deep shelter
for 8000 people in January 1940.
The first entrance at Marlborough Yard at the rear of
116 Borough High Street was available for use at the
beginning of August 1940. The shelter ran between two
concrete bulkheads that had been installed in the tunnel
at the time of the Munich crisis in 1938; one was just
north of the junction with the Moorgate line at Borough
and the second was just south of the River Thames which
was fitted with a watertight steel door. A similar bulkhead
was built on the north side of the Thames. The bulkheads
were built to ensure no flooding of the tunnel would take
place if the tunnel under the river was breached by a
bomb. A strongroom was built on the down side of the
line just north of the Borough bulkhead to house Council
valuables and important documents.
Each new entrance staircase was built using reinforced
concrete segments and would allow a flow of 300 people
a minute. Concrete staircases were built inside the tunnels
with a void beneath the steps for ventilation, electric cables
and water services. A new concrete slab floor was laid in
the running tunnels, again leaving a void for services
beneath. Some wooden seating was provided on both sides
and 12 banks of toilet cubicles were built at intervals
along both tunnels. Electric lighting was provided
throughout and the walls were whitewashed and at a later
date some bunks were fitted.
50
diameter shaft, 64 feet in depth,
was sunk in Arthur Street with
direct access from the basement
of King William Street House
(on the opposite side of King
William Street from Regis
House). This connected with
the south side of the former
crossover tunnel, a short
distance from the point at
which the two separate running
tunnels started. The whole
works then formed a private
shelter for the office employees
of Regis House and King William Street House with the
two basement access points. The capacity was stated to
be 2,000 persons.
The tenancy was continued after the war so that the tunnels
could be used for storage. When visited in the 1970s the
station was still being used for document storage by Regis
House. Regis House was demolished at the beginning of
1995 and subsequently replaced by a new building of the
same name. Access was still retained at the new Regis
House. A blue plaque can be seen in Monument Street
which reads “Site of King William Street Underground
Station. First City Terminus (1890 - 1900)”.
During the building of the Jubilee Line Extension in the
1990s a new use was found for the old running tunnels
between London Bridge and the river; they have now been
adapted as part of a ventilation system for the Jubilee
Line. This has involved building new concrete bulkheads
which has effectively cut the tunnel in two and through
trips between Borough and King William Street are no
longer possible. This work has cut the through ventilation
and the tunnels and especially the spiral stairs are now
very humid. In recent years new lighting has been installed
at King William Street and the station and west running
tunnel now carry new cabling for the underground
network.
Tour of King William Street
For many King William Street was the highlight of the
weekend and with more than two hours to explore this
historical site we made the most of an opportunity that
probably won’t be repeated.
From the basement of Regis House we passed through a
door onto the top of the old emergency stairs which
descend 75 feet to the station below. The stairs appear to
be original and in good condition considering their age.
The spiral ends 30 feet above the platform from where a
concrete stairway runs down to platform level; this still
retains its original cream and patterned tiling scheme
employed on the early CSLR stations.
The two-level rooms constructed in 1940 remain largely
unaltered, running along the east side of the station tunnel.
Steps at either end of the block of rooms lead to the upper
Drawn by Tim Robinson
The shelter came into use on 24 June 1940, six days after
the start of the blitz and by August that year thousands
of people were sleeping in the tunnel every night even
when no air raid warning had been sounded.
King William Street station wasn’t part of this scheme.
The Southwark shelter occupied the complete section
south of the River Thames and the under river sections
were isolated by the concrete bulkheads and watertight
doors either side of the river. This left the brick-lined
King William Street station tunnel and crossover tunnel
plus the cast iron running tunnels down as far as the
bulkheads beneath Upper Thames Street.
Entrance into the shelter from King William Street House.
(1995) Photo by Nick Catford
Early in 1940, the owners of Regis House secured a
tenancy to use the station tunnel and the crossover tunnel
as an air-raid shelter. Various works were required to
convert the tunnel to its new use. A mezzanine floor of
reinforced concrete was constructed to provide twice the
area for use as a shelter. A new floor at track level was
also laid. Electric lighting was installed together with two
blocks of toilets in the old running tunnels, a kitchen and
emergency forced ventilation. An additional 10' 6"
Looking east in 1995, the trackbed was filled up to platform
level when the station was converted into an air raid
shelter. Two-level shelter rooms can be seen on the right
with some original wall tiling on the left. Photo by Nick
Catford
level where some ventilation plant can still be seen. Metal
trunking is suspended from the ceiling in both the upper
and lower rooms. Previous visitors have noted a number
of WW2 propaganda posters still in good condition but
these have all now been removed, perhaps when new
cables were fitted recently. It is still possible to make out
a couple of the poster fragments including one that once
said “Careless talk costs lives”. One typed sheet is still in
place which says “Special notice to late arrivals and early
risers: please spare a thought for your fellow shelterers
and refrain from making any unnecessary noise. Please
remember others may be asleep although you are not”.
At the east end of the station there is a side room, perhaps
a toilet, that still has tiled walls and a tiled ceiling. A
walkway runs along the south side of the station where
some tiling is also still in place on the wall. At the end of
the ‘building’, on the site of the crossover at the end of
the platform, there is a kitchen with a serving hatch close
to a small fan which feeds into the ventilation trunking.
The upper level of the shelter. (1995) Photo by Nick Catford
There is also the bottom of a circular brick shaft with a
bricked-up entrance. This was the 64’ shaft sunk from
King William Street House in 1940.
The two tunnel mouths are slightly offset in level. There
are two rows of whitewashed brick toilet cubicles in each
tunnel mouth, one tunnel for men and the other for women;
a narrow walkway runs between the two lines of cubicles.
Immediately after leaving the station the tunnels turn
sharply to the left below Swan Street before terminating
at a concrete bulkhead close to the Thames; at this point
both tunnels are flooded to a depth of one foot. There is a
metal door through the bulkhead but we had no permission
to go beyond this point so we returned to the surface at
the end of a highly enjoyable weekend.
Toilet cubicles in the running tunnel beyond the station
(1995) Photo by Nick Catford
Philip is hoping to arrange further visits to other stations
later this year or early next year which will be notified to
members via the email list. It should be noted that this
was not an ‘official’ Sub Brit trip; it was a private trip
arranged by Philip Lindhurst but made available to Sub
Brit members through the e-mail list.
Sources: Wikipedia - the free on-line encyclopedia.
London’s Disused Underground Stations by JE Connor
- Connor & Butler 1999 ISBN 0 947699 29 5.
The City & South London Railway by TS Lascelles -
Oakwood Press 1987 ISBN 0 85361 360 5.
Rails Through the Clay by Alan Jackson & Desmond
Croome - George Allen & Unwin 1962 (New edition at
£80 published by Routledge 2006 ISBN 978-
0415418171).
The Railway to King William Street by Peter Bancroft -
Published by the author 1981 ISBN 0 9507416 0 4.
London s Secret Tubes by Andy Emmerson & Tony Beard
- Published by Capital Transport.
Railway Magazine September 1930 - The World’s First
Electric Tube by Charles E. Lee.
52
Sub Brit on Mendip
Bob Templeman
On Friday 18 July 2008 a party of seven members
gathered on Mendip to visit Charterhouse on Mendip
where some of the most important remains of ancient
mining in Western Europe are to be found.
Lead on Mendip was found near to the surface in long
narrow horizontal veins - known locally as rakes - with
its greatest concentration in the Charterhouse valley. Thus
it was easy to initially exploit, by simple digging or indeed
picking it up from the surface.
Mining operations spanned the pre-Roman era, through
Roman, medieval, Tudor and finally early modern times.
The earliest exploitation commenced with the digging of
trenches to expose the veins of lead ore, and the digging
out of the entire lode or rake. This was followed by the
construction of conventional shafts and later the ill-fated
period of Cornish miners sinking deep shafts to find non¬
existent lead below the previous workings. Latterly the
resmelting of the existing slag heaps and slimes resulting
from previous workings has taken place. Pre-Roman
activity has been confirmed with the finds of lead weights
for fishing nets in the vicinity of Glastonbury Lake village
together with the discovery of two British silver coins at
Charterhouse.
The mining activity of the Romans has been well
documented following various archaeological
excavations, together with the finds of 19 or so inscribed
lead ingots or pig weighing from 34.5 kilograms to 101
kilograms. The furthest away discovery was made at St
Valery-sur-Somme. Whilst no evidence of the Roman
name for Charterhouse has been found, some of the
inscriptions on these pigs contain the letters VEB possibly
a reference to Charterhouse. Romans usually abbreviated
inscriptions and VEB might just stand for (Great)
Wembcrham, a few miles away, where a Roman Villa
has been discovered.
Over two days various archaeological sites of the valley
were visited as detailed below:
Lead condensing flues
These were probably built circa 1867-73 by Treffry’s
Company who may have enlarged existing Hues belonging
to the Mendip Hills Mining Company, which had also
built flues at Charterhouse 1 mine before 1861. The flues
were in use until 1878. Dressed materials, slags and slimes
- that is fine-grained ore and mud as recovered from the
dressing floors - were smelted in reverberatory Castilian
furnaces in which fans driven by a steam engine forced
hot air over the slag. The vaporised lead collected in the
flues and was subsequently removed by hand. There were
two sets of flues, each with four tunnels. The flues survive
as partially roofed limestone rubble structures. Blocking
walls in some of the tunnels date from 1939-45 when
they were used for storage in the Second World War.
Bleak House and adjacent tenements
These are now no more than earthworks and ruins.
Bleak House was the residence of the manager of the
Charterhouse Lead Mines.
Pattinson plant and stables
In October 1833, a Mr Hugh Lee Pattinson patented a
process involving the extraction of silver from lead by
allowing molten lead to crystallise while pouring off
still molten silver-rich lead into separate containers.
The plant at Charterhouse may date to 1858 when 36.7
kg of silver was recorded to have been produced.
All that remains today are the foundations. The plant
consisted of a range of four rooms, with a flue running
northwards up a slope behind the buildings to the site
of a chimney. The rubble from excavations of 1967-
68 was inadvertently bulldozed during the rebuilding
of the causeway breached in the 1968 flood. Lying
nine metres to the north west of the plant, an
openfronted stable was excavated between 1968 and
1970.
Roman Rake
Roman Rake
Seen here is the site of an archaeological dig where the
excavation of a long narrow rake similar in character to
other known Roman mines. Five trenches were excavated
which showed the rake to be the surface of narrow cuts
down into the limestone for a great depth. At some point
a natural cave system was encountered. The filling-in of
the top of these fissures could be firmly dated to the second
half of the first century AD and was probably associated
with the digging of other rakes. The site is now a caving
dig.
Barwell Shaft and adjacent horse whim
Barwell is a typical deep square Cornish mine shaft, now
filled in. The circular floor of the whim (a local name for
a horse gin) is to be found over a dry stone wall. The
53
horse whim winding engines of Charterhouse were
apparently able to raise loads of up to 150 kg.
Stainsby’s Shaft
This is another Cornish mine shaft, originally 108 metres
deep and gradually filled in having fallen into disuse. The
existing 10 metre shaft with large visible shotholes is now
the site of a caving dig.
Grebe Swallet
This was discovered after the great flood of 1968 and is
a swallet (a natural sink hole/entrance to cave system). It
was utilized by 18th century miners as a lead mine
Waterwheel Swallet
This was also uncovered after the great flood of 1968
and was found to contain the remains of a six metre
diameter water wheel together with its associated gearing.
Current thinking is that it was the power source of a saw
mill.
Additional Sites
Shute Shelve Tunnel
The opportunity was also taken to walk through a former
railway tunnel under Shute Shelve hill. Part of the Great
Western Railway line from Yatton to Wells, it was
completed in 1869 and finally closed in 1965. The tunnel
is now used both as a footpath and cycle route. The
tunnel is unusual in that the southern half is unlined whilst
the northern portal and section is brick lined with
appropriate refuges for gangers.
Finally, we had the good fortune to be able to visit and
see the Mesolithic attributed engravings in Aveline’s hole,
Burrington Combe. These were discovered in 2003,
following the discovery of Palaeolithic cave art at Church
Hole, Cresswell Crags earlier the same year. The
engravings comprise a lattice work of two rows of
engraved crosses, six in the upper row and four in the
lower row, measuring approximately 25 cm wide by 20
cm high.
Acknowledgements:
GJ Mullan and LJ Wilson for the visit to Aveline’s hole
The Mendip Caving Group, for use of their Cottage
References:
The Mines of Mendip by JW Gough. David and Charles:
Newton Abbot 1967
Cornish Miners at Charterhouse-on-Mendip by WI
Stanton and AG Clarke, from the proceedings of Bristol
Speleological Society, 1984, Vol 17 Nol, pp29-54.
A possible Mesolithic engraving in Aveline’s Hole,
Burrington Combe, North Somerset, by GJ Mullan and
LJ Wilson.
All Photos by Bob Templeman.
Aveline’s Hole
BROMPTON
Brompton Road Station and London’s Anti-Aircraft Defences
NickCatford and Andy Emmerson
BASEMENT PLAN GROUND FLOOR PLAN
1. STORE FOR UPPER PART
2 PORTERS'ROOM
3. STORE
4 LIFTSHAFT (23ft DIA )
5. LIFTSHAFT (23ft DIA )
6 MOTOR FAN ROOM
7. EMERGENCY STAIRS
8 COAL STORE
9 STORE FOR SHOP ABOVE
10. STORE FOR SHOP ABOVE
11. LADIES 1 TOILET / -——
12 GENTS' TOILET Y 1 -
13. TOP OF EMERG STAIRS /
14. LIFT 11
15 UFT
16. LIFT
17. LIFT / 12
18. BOOKING OFFICE
19. SHOP 0
20 ENTRANCE / 13 UJJJTT-
21. EXIT
GLADSTONE
PUBLIC
HOUSE ,
BROMPTON ROAD
STATION
BROMPTON ROAD
ARROWS INDICATE
DIRECTION OF
PASSENGER FLOW
BROMPTON ROAD
BROMPTON ROAD
EASTBOUND PLATFORM
TO FINSBURY
PARK
WESTBOUND PLATFORM
---—-1 MICHAELS
| GROVE
Brompton Road had a brief and undistinguished life as a
station on the London Underground but during WW2 the
redundant station was given a new lease of life and played a
strategic role in the Capital’s defences against the German
Luftwaffe.
During the early years of the development of London’s
underground rail network, the Brompton & Piccadilly Circus
Railway was one of the first to receive parliamentary sanction
on 6 August 1897, when the company was authorised to
build an electrified line between Piccadilly and South
Kensington with five intermediate stations at Dover Street,
Drawn by Tim Robinson
Down Street, Hyde Park Comer, Knightsbridge and
Brompton Road. Unfortunately the company was unable to
raise sufficient finance and work on the construction never
started. In 1899 financial problems forced the delay of another
venture proposed by the Great Northern & Strand Railway
to build a line from Wood Green to Aldwych.
Both lines were eventually revived under the direction of the
American capitalist Charles Tyson Yerkes who had played
a major role in developing mass-transit systems in Chicago.
In 1900, Yerkes decided to become involved in the
development of the London Underground network and
quickly took control of the Metropolitan District Railway
and the unbuilt Baker Street & Waterloo Railway, Charing
Cross, Euston & Hampstead Railway and the two ailing
schemes which he combined as the Great Northern Piccadilly
& Brompton Railway.
Two further parliamentary Bills were required to sanction
an additional length of line linking Aldwych with the
B & PCR’s proposed terminus at Piccadilly. The two
companies merged on 8 August 1902 and the Great Northern
Piccadilly & Brompton Railway was officially formed on
18 November that year.
Construction
Construction started at Knightsbridge in July 1902 and soon
work was underway along the whole length of the route. At
The street level building in 1907, a typical Leslie Green frontage.
Brompton Road, the two station tunnels each 21 ’ 2 in
diameter and 350’ in length and two 60' 3" deep lift shafts
(each accommodating two lifts had been finished by
December 1903. Work was still underway on the running
tunnels but these and the interconnecting subways between
the platforms were completed by 30 th June 1904.
By the end of December 1904 the narrower shaft for the
emergency spiral staircase had been sunk and the platfonns
had been largely completed apart from some finishing. By
December 1905, the spiral staircase was in place and the
station was ready for tiling which was to include the station
name fired onto the tiles in large brown letters three times on
each platfonn. Each station has a different tile pattern to aid
passenger recognition: at Brompton Road the tiles were white
and cream with green and brown decoration and included
embellished ‘Way Out' and ‘No Exit’ signs.
The street-level building stood on the north side of Brompton
Road at the junction with Cottage Place; it was designed by
Leslie Green to his standard design. The building was faced
with ox-blood red glazed terracotta tiles, with the ground
floor divided into wide bays by columns and featuring large
semi-circular windows at first floor level. The building was
'L' shaped with a secondary entrance in Cottage Place which
was probably only used by staff. The comer site was occupied
by the Gladstone pub forcing the construction of the ‘L'
shaped station building.
The GNP & BR Opens.
The completed line ran from Finsbury Park to Hammersmith
(the section between Finsbury Park and Wood Green was not
built until very much later). It was ready for use on
3 December 1906 and after passing a Board ofTrade inspection
was ceremonially opened by David Lloyd George (MP) on 15
December a year after Yerkes’ death. Brompton Road opened
with the line although three of the intennediate stations, including
Down Street were unfinished and didn’t open until the following
spring. A short branch between Holbom and Strand (later
renamed Aldwych) opened on 30 November 1907. On 1 July
1910, the GNP&BR and the other Yerkes - owned railways
were merged by private Act of Parliament to become the' London
Electric Railway Company’.
Underground Electric Railways Company of London
Limited red ’roundel' on Brompton Road platform in 1923.
From the outset, Brompton Road failed to attract many
passengers; it was conveniently sited for the Brompton
Oratory and the Victoria & Albert Museum but there was
little else to attract passengers as it was very close to both
South Kensington to the west and Knightsbridge to the east
and from an early date some trains went through Brompton
Road without stopping. One lift was removed in 1911 and
the adjacent lift was taken out in the late 1920s leaving just
two lifts in operation and it was clear that the station was
being run down in an attempt to save money. The booking
office was closed with passengers buying tickets from the
lift attendant or machines and in about 1914 the ‘Women’s
Institute and club for Underground employees’ was opened
in some of the redundant rooms within the entrance building.
.and Closes
The station was closed on 4 May 1926 at the start of the
General Strike but when other stations reopened, Brompton
Road (and York Road north of Kings Cross) remained closed.
The company hoped that the station could remain closed but
Brompton Road got a reprieve after local MP William
Davidson made an appeal in the House of Commons to the
Minister of Transport to have the station reopened stating
that local residents and traders were badly inconvenienced
as were those wishing the visit the nearby Brompton Oratory
and the parish church. The Minister assured the Honorable
Member that the station would be reopened.
The station did indeed re-open on 4 October 1926 without a
Sunday service (hardly convenient for the Brompton
Oratory!) but after further intervention from Sir William,
the Sunday service was eventually reinstated although the
reprieve was to be short lived. Many trains continued to
pass through Brompton Road without stopping and by 1929
alternate trains weren’t stopping during the week although
at weekends most trains called at the station apart from some
early afternoon and late night services.
Final Closure
The early 1930s was a time of recession and in order to
relieve unemployment Government capital was made
available to extend the tube network including the Finsbury
Park Hammersmith line. The scheme included an extension
56
northwards to Cockfosters and westwards to Hounslow and
Uxbridge.
As part of the modernisation and expansion programme the
closure of uneconomic stations was expected. This also
served to reduce running times from the suburbs to the centre
of London. York Road and Down Street stations closed in
1932 but surprisingly Brampton Road initially remained open
until modernization was completed at nearby Knightsbridge
which was provided with new entrances at both ends of the
station each equipped with escalators. The improvements at
the station left little demand for Brampton Road as the new
west entrance at Knightsbridge reduced its catchment area.
The station closed after the last train on 29 July 1934 with
the new entrance to Knightsbridge opening the following
day.
A New Function
At the outbreak of war in 1939, many abandoned tube
stations (and those that were still under construction) were
adapted as deep level public air raid shelters but the
Government had different plans for Brampton Road.
The convenient location of the station with its combination
of underground accommodation and a two-storied building
above ground made it an attractive location. It was no
surprise, therefore, that two government departments showed
interest in using it as secure accommodation, but since neither
body was aware of the other’s intentions the negotiations
soon descended into tragic comedy.
The Office of Works and Public Buildings was interested in
storing art treasures from the nearby Victoria and Albert
Museum there, whilst the War Office had other designs on
the place. Ostensibly His Majesty’s Office of Works had
prior claim, having negotiated with the LPTB (The London
Passenger Transport Board took over the London Electric
Railway Company in 1933) to use the tube station.
Independently, the Commander 1st Anti-Aircraft Division,
Territorial Army, had held a meeting with the LPTB on 24
May 1938 with a view to locating the Inner Artillery Zone
gun operations room (GOR) in the lift shaft of a disused
station. Brampton Road was ideal since the building above
the station could serve as quarters for the personnel manning
the operations room in war conditions.
Two months later, the Board agreed to lease or sell the
property to the Army, at the same time confirming a licence
to the Victoria & Albert Museum assuming that joint
occupancy would not cause problems. This wasn't to be
however and when word reached the Museum in September
1938 that the station might be needed for storing explosives
or ammunition, it complained that this would make the station
totally unsuitable for safe storage of national art treasures.
An immediate refutation from the War Office stated its sole
intention was to use the premises as Operations (Control)
Room for the guns of the Inner London Defences, 1 st Anti-
Aircraft Division and a subsequent letter to the Office of
Works apologised, but the scheme had to proceed in the
interests of national security.
In justification, the OC (Officer Commanding) 1st AA
Divisional Signals stated. “Brampton Road station is ideally
situated and a most suitable site for the Gun Operations
Room of the Inner Artillery Zone". He had investigated the
question of provision of communications to the station with
the telecommunications department of the GPO and
ascertained that it would be possible to connect Brampton
Road station by cable through the tube to the GPO cables in
the underground system. “Safety of lines will thus be
assured.” Accordingly the War Office intended to purchase
the westbound platform and the lift shafts. “The lift shafts
are suitable for the construction of three or more operations
rooms and an apparatus room; these rooms can be connected
from the spiral staircase. The LPTB is prepared to build the
operations and apparatus rooms and to make the ground
level bombproof."
Thus it came to pass that the War Office secured the station
for its exclusive use and on 4 November 1938 the
Commissioners of Crown Lands purchased the street-level
buildings, lift shafts and certain passages for the agreed price
of £24,000 (the Museum was awarded the consolation prize
of finance to build a bombproof chamber in its own
basement). Conversion of the station for its new use then
took place. Brick walls were built on the outer edge of the
platfonns to create rooms inside, while intermediate floors
were built in one of the station’s two lift shafts for the
operations centre. Of the two walled-off platform tunnels,
the eastbound was used as the teleprinter and communications
centre, and the westbound one was used for a rest area and
staff accommodation.
Throughout the war, the station was the HQ of I s ' Anti¬
aircraft (AA) Division, whose area of responsibility was
London and its environs. London Gun Defended area (GDA)
was divided into three areas called ‘Inner Artillery Zones’
(IAZ). These were IAZ South, south of the Thames, IAZ
North and IAZ East. In addition there was a “Slough and
Langley Group” which covered aircraft production in these
areas. Nonnal Administration was devolved through the
usual military channels; however the Division was under
the operational control of the RAF, in this case the Air Officer
Commanding (AOC) No 11 (Fighter) Group. RAF at RAF
Uxbridge, who exercised control over all of the southeast.
This included Fighter Squadrons. Barrage Balloon
Squadrons and 1 st and 6 Ih AA Divisions.
Anti Aircraft Operations
All infonnation received from radar stations, ROC Group
HQ’s and other services, that was plotted on the RAF Group
operations table was copied to the AA HQ at Brampton
Road and displayed on their own plotting tables. Later AA
gun sites had their own radar, which enabled them to track
enemy aircraft locally.
Guns could not engage until permission had been granted
by the RAF Group, Commander. The AA HQ was in direct
telephone contact with all gun sites via an open multiphone
system.
The plotting room staff were members of the Auxiliary
Territorial Service (known as the ATS) which was the
women’s branch of the Army. Many ATS worked in AA
Command they also manned the control instruments at the
gun sites. They did not (officially) ‘man’ the guns.
A vivid impression of day-to-day operations in 1943 is given
by retired Lt. Col. B. N. Reckitt in his book Diary of Ami
Aircraft Defence 1938-1944. He explains that the original
operations room of 1939 was on the ground floor of the
street level building. Although later used only as an office, it
retained its original plotting maps and was kept in that state
for the edification of distinguished foreign visitors to whom
it was impolitic to show the real methods of control. The
operations rooms actually used for most of the war were at
a lower level, built one above the other in one of the station’s
former lift shafts. He continues, “The top room of the lift
shaft was called GORI (Gun Operations Room 1), the room
of the General Officer Commanding (GOC) who had the
picture of the progress of a raid plotted on a large map table
below the dais and where he was in touch by telephone with
the RAF, ARP and Fire Services, with the searchlights and
with every gun site. An elaborate system of coloured lights
showed which were actually firing, provided always that
the telephonists on the sites remembered to ‘key-in’ the
GUN OPERATIONS ROOM No. 2
Operations room of the 1 st Anti Aircraft Division in the lift
shaft (GOR I) at Brampton Road. Women of the Auxiliary
Territorial Service (ATS) plotting aircraft movements
enabled the army officers on the dais to command
firing at remote artillery gun sites. Although functionally
part of the army, Anti-Aircraft control came under the
operational control of RAF Fighter Command.
appropriate code. Their forgetfulness was a
continual source of trouble with the GOC.
GOR II was mainly a telephone exchange
and centre of information for intelligence
officers. GOR III, deeper down in the lift
shaft, controlled the northern London area
and below it GOR IV the southern area and
each of these two was in the charge of a
Regimental Commander drawn from the
respective areas on a rota basis, by night. In
each room, the progress of a raid was plotted
on maps as in GOR I. The main job of the
controller was calling out the gunners for
action, plotting the courses of enemy aircraft
to them, directing their radar sets to search
on the bearings of approaching raiders and
ordering ‘barrages’ in the event of saturation
attacks. This occurred when there were too
many enemy aircraft for radar sets to pick
out a single plane for engagement.
GOR V was an emergency room at the
bottom on the station platform. It never had
to be used. In the passage down to it, the
controllers and their assistants had to sleep
with the lights continually on, in a strong
draught and with GPO engineers passing up
and down to look after the enormous
switchboards, which were also on the old
platform. The inn in Brompton Road
between the station and the Oratory (The
Gladstone) was generally known as GOR
VI. When on duty it was the furthest one
could go for “refreshment.”
TRAP DOOR COVERING
LADDER (DOWN TO G.O.R. 3)
FAULT CONTROLS TABLE
HOUSE EXCHANGE
TELEPHONE
COMBINER
TELEPRINTER
R A F SECTOR H/Qs
BIGGIN HILL
KENLEY
HORNCHURCH
NORTH WEALD
NORTHOLT
EMERGENCY
SWITCHBOARD
EMERGENCY
LADDER
(UP TO G.O.R. 1)
TO OPS
PBX
(G.O.R. 4)
GUN PILLAR
EQUIPMENT
SEARCHLIGHTS
SWITCHBOARD
D O* TABLE :
A - UXBRIDGE FIGHTER GROUP
B - D O* EXTENSION
C - SPARE JACK FOR HOUSE TELEPHONE POSITIONS
D - D O* JACKS FOR GUN-SITE POSITIONS
E - UXBRIDGE MAP PLOTTER
F - D O* EXTENSION
EXTENSIONS FROM OP* P.B.X
58
Drawn by Tim Robinson
The dais in GOR I overlooking the plotting tables.
Note the Lamson pneumatic message tubes and the
coloured RAF 'Sector' clock which showed how
up to date the information on the table was.
GCI radar
The Brompton Road operations room took part in an
interesting experiment carried out with the Army. A
specialised kind of radar, known as ground controlled
interception or GCI, situated on the ground scanned the
entire dome of the sky overhead to produce a live map of the
sky. On this map were plotted all aircraft, hostile or friendly,
flying within a radius of many miles. The display tube was
known as a plan position indicator (PPI) in which a rotating
beam swept the face of the cathode ray tube rather like the
second hand of a watch but far more rapidly, producing the
display now familiar at air traffic control (ATC) centres.
Back then, it was entirely new and one of the first installations
was the Army’s anti-aircraft gun installation in Hyde Park
during July 1941.
As a further novelty, a remote display and control were
provided in the operations room in the tube station, about a
mile away. A special linking cable was provided, using BBC
equipment, and it was said that the display at Brompton
Road was “the equal of Hyde Park’s”.
Maurice V Wilkes recalled the project in his book,Memoirs
of a Computer Pioneer, which notes that, “The remote
display was to be located in the operations room of the 1st
A.A. Division, which was underground in a disused tube
station in Brompton Road. Someone suggested that it would
be worthwhile consulting H. L. Kirke, the chief engineer of
the BBC, with regard to the transmission problems involved.
405-line television was operating in London as early as 1936
and was only closed down on the outbreak of war. The BBC
had, therefore, much experience of the transmission of video
signals. I went to see Kirke in his office and very much
enjoyed meeting him.”
Edward Pawley fills in some technical details in his book
BBC Engineering 1922-1972, stating that, “among the
miscellaneous projects on which the BBC gave advice was
the setting-up of a video circuit over a cable pair, using the
equipment that had been developed by the BBC before the
war, to operate a plan position indicator for gunnery control.”
Postwar operations
Brompton Road was hardened for further use as an anti¬
aircraft operations room (AAOR) in the early 1950s but
was considered unsuitable. Brompton Road’s inadequacy
as an AAOR was now acknowledged and a memo from the
Director of Military Operations to Vice-Chief of the Imperial
General Staff (the No 2 position in the army) in November
1951 stressed the urgent need for better protection of military
headquarters in war. Six premises, including the headquarters
of 1 st A. A. Group were noted. In the event, the World War
II combination of ground-based observers and radar stations
was replaced in the early 1950s by the more sophisticated
ROTOR radar stations backed up by new control centres.
For this reason postwar use of Brompton Road as an AAOR
did not last long, being replaced by three new centres
constructed from 1951 onwards and opened in 1953.
Boundary changes since the war gave these the following
areas of coverage: Lippitts Hill in Essex on the south side of
Epping Forest covered the London North GDA (gun-
defended area) and Merstham in Surrey controlled the
London South anti-aircraft zone with RAF Uxbridge
controlling the West London GDA. Brompton Road was
retained as a backup AAOR.
With the demise of AA Command in 1956, the three new
control centres were themselves redundant when guided
missiles replaced gun defence. Other uses were found for
Brompton Road and at one time it formed offices for the
London District. The streetlevel building was later taken
over by the Territorial Army. The building was largely intact
and unaltered through the 1960s with some original tiling
and signage remaining in the old booking hall. In 1971 there
was a proposal to widen Brompton Road. The Gladstone
pub on the comer of Cottage Place was demolished that
year and in March 1972 the station frontage on Brompton
Road was also demolished although the staff entrance on
Cottage Place was left untouched and can still be seen today.
Brompton Road Station Entrance c. 1968. Photo by J E Connor.
An interesting ‘might-have-been’ occurred in 1987, when
the site was earmarked for a new £1 million bunker. On 22
May, the London Daily News reported that the London Fire
and Civil Defence Authority had decided to house its control
room in the station. The bunker, intended to accommodate
ORIGINAL LINE OF BOOKING
HALL BEFORE ROAD WIDENING
BROMPTON ROAD
STATION 1st FLOOR
ir«J-
TUNNEL
WESTBOUND
STATION
EASTBOUND
in
SECTION THROUGH STATION
ORIGINAL GOR
GOR1
’
GOR 2
n/ n
GOR 3
■ ;/
GOR 4
LIFT WELL
PLANT
_ __
Draw n by Tim Robinson
PLANS THROUGH STAIR
WELLS / ROOMS
60 civil defence staff, would act as an emergency co¬
ordination centre forwest London following nuclear attack.
It was to be one of four bases and was to be ready for
occupation within two years. Later, on 19 October, the Daily
Telegraph expanded this story, affirming: “The closed
Brompton Road Underground station is being converted into
a nuclear fallout shelter for local borough councillors to
control north-west London in World War III. The station
formerly housed the London anti-aircraft control centre; now
60 officials will be self-sufficient in a 70’ deep bunker for 30
days".' In the event nothing was built.
The station was once again in the news in 1995 when someone
attending an Air Squadron function plunged to his death
down one of the lift shafts. This wasn’t the first death at the
station as on 27 March 1924, a man committed suicide by
shooting himself through the head in one of the toilets.
Today the altered street-level building and attached drill
hall is still owned by the Ministry of Defence and is
maintained by the Territorial Army and used as the Town
Headquarters (THQ) University of London Air Squadron
and the University of London Royal Naval Unit. Occasional
conducted tours of the station have been allowed in the past
and in 2000 the children’s television programme Blue Peter
was allowed to film at the station including the gun operations
rooms but new health and safety regulations have put a stop
to all future visits.
What is left underground?
In theory, Brompton Road could be used for de-training in
tire event of an emergency evacuation as there is access from
the track out through the former staff entrance in Cottage
Place, but much of the station including the GOR’s lift shafts
and spiral staircase remains in MOD hands and even LUL
_ _ staff are not allowed beyond the top
3R of the stairs leading up from the
~- ==== —. platforms apart from a monthly
, inspection of the entire station.
= = r .i =- The station is still well ventilated
as one of the lift shafts is open to
- ft —L. the surface but there is no
emergency lighting and subways
between the stairs and the
- _____ ventilation shaft are extremely dirty
with everything covered in dust,
mainly from train brake linings.
It is possible to get a glimpse of the
Tstation from a passing train as the
= ... 2 - -- brick walls built alongside the track
PLANT to create rooms where the platfonns
M M once stood are still there. In the
|i ii |! centre of the station there is an
n \ opening in the brick wall opposite
j l i iii i i i i m iiiiiiii Jj one 0 f (he five interconnecting
' '/ passages between the platfonns and
^l R a short section of platfonn remains
although it’s unclear if this is
original or is a later addition to allow maintenance staff to
alight from a passing train. Rail access was maintained after
the station was converted but this is described as being at
one end of the platfonn. There are two small rooms entered
from this cross passage and one was a switch room where
there is still a floor standing cabinet for controlling the air
conditioning and filtration plant.
A short flight of steps leads up from the cross passage to a
bridge across the eastbound track and on to the lower lift
landing used by incoming passengers. The two entrances to
the first lift shaft were bricked up when that shaft was
converted into the Gun Operations Rooms but the two
entrances to the second shaft remain. This shaft is open to
Much of the platform tiling is still in place with a number
of embellished signs fired into the tiles at the cross
passages. Photo by Nick Catford
60
Only the platform exit side of the lower lift landing was used
during WW2, the side seen here being restricted to ventila¬
tion only. The brick wall that now divides the shaft vertically
can be seen in the left hand entrance. Photo by Nick Catford
the surface and traffic noise can be clearly heard. There is a
7 foot drop down into the lift well and a vertical brick wall
has been built across the shaft up to the top so only half of
the lift shaft is now used for ventilation. A dismantled fan
sits on the lift landing; presumably this was once installed
here to aid ventilation.
Back at the cross passage, there are short flights of steps
down into the rooms created when the platforms were
removed. A number of partition walls survive within these
long narrow rooms and much of the original white and cream
tiling is still in place although some of it was painted a matt
grey during the war and the remaining unpainted tiling is
now very gmbby. The station name can still be seen in a
number of places painted in large brown letters as can the
decorated ‘Way Out' and ‘No Exit' signs fired into the tiles
on either side of many of the cross passages.
At the west end of the westbound platfonn a projection screen
has been painted onto the end wall with a ‘no smoking' sign
The site of the eastbound platform. Note how narrow the
room is and the bottom of the two bridges leading over
the station to the lifts. Photo by Nick Catford
below it. This room was used for screening information films
for staff. The eastbound platfonn area was used as the
teleprinter and communications centre and the westbound
platform area was used as a rest area, this room would also
have housed GOR V; in the event of an emergency. The two
bridges taking passengers to and from the lifts can clearly
be seen crossing the eastbound platform and track.
At the west end of the station, the last cross passage has
another stairway up to the other side of the lifts on the low er
lift landing; this was originally the way out for passengers
leaving the station. At the top of the stairs, there are two
wooden doors and once through these the subw ay turns left
across the eastbound track to a locked metal grille. Beyond
this grille is MOD property which is out of bounds to LUL
staff. Before reaching the lifts, there are two partition walls
dividing the subway into three rooms. Once through the
second partition the original emergency spiral staircase is to
Air filters on the lower lifting landing. Photo by Nick Catford
the right and beyond that the GOR lift shaft. One lift entrance
has been retained for access into GOR 4 while the original
entrance into the second lift has been infilled forming a
shallow alcove containing a rack of electrical switchgear.
Before the second (ventilation) lift shaft there is a further
partition wall creating a filter room. Outside the room there
is a mounted rack of gas filters manufactured by Sutcliffe
and Sweetman. A further two racks of gas filters are to be
found inside the room together with the controls for the air
conditioning plant which is located in the adjacent lift well.
There is a flight of steps down into the well where there is a
large fan feeding ventilation trunking running through the
bunker. The plant is on the opposite side of the brick wall
which partitions the shaft, observed from the opposite
landing. It turns out the partition in this shaft is actually two
walls enclosing a staircase which zig zags across the shaft
through four semi-circular rooms that have been built within
it. The lowest room is entered at the top of the first stairway.
There is a brick plinth along one side which might have been
some kind of equipment mounting and vertical trunking
GORII; the ladder was for emergency escape up to GOR 1
while the trap door on the left leads down to GOR Ill.
Note the classic green and cream paint scheme and
the use of acoustic tiles. Photo by Nick Catford
(intake and exhaust) running up the shaft, but other than
that the room is empty. At the far end of the room a doorway
leads to the stairs that double back across the shaft up to the
next level.
The next two semi-circular rooms are completely empty;
the top room has another brick plinth and a door at the far
side that leads to a short passage. This leads into the adjacent
“Gun Operations Room’ lift shaft and into the first of the
circular gun operations rooms, GOR I. Apart from ventilation
trunking and some electrical fittings the room is empty. There
is a trapdoor in the floor close to the side of the shaft with a
ladder down to GOR II below. A doorway leads out to the
top of the spiral staircase in an adjacent shaft. We are now
in the basement of the street-level building. A separate
The cantilevered walkway from the spiral staircase leads
into GOR III. Note the original wall tiling still in place.
The spiral staircase continues to the lower lift landing from
where there is access into GOR IV. Photo by Nick Catford
stairway leads up to the booking office where a door prevents
any further progress as this is now inside the TA Centre.
The spiral staircase is still in good condition with much of
the original white, brown and green tiling still intact. A short
distance down there is a doorway into GOR 11 with a wooden
board with ‘2’ painted on it hanging on a guard rail just
outside the room. Again the room is completely stripped
apart from electrical fittings and a vertical ladder up through
the trapdoor above, a sign on the wall indicates this is the
fire escape. A further trap door gives access to another ladder
down into GOR III.
Further down the spiral staircase is the entrance to GOR III;
because of its position in the shaft in relation to the stairs a
short cantilevered walkway has been constructed to give
access to this room. Once again the room is empty apart
from ventilation trunking and electrical fittings. There is no
trap door in the floor down to GOR IV below. GOR IV is at
the base of the lift shaft and entered from the lower lift landing.
In this room, which controlled the south London guns, there
is a large 1" to 1 mile faded Ordnance Survey map on the
wall overprinted with a Cassini military grid and overdrawn
with gun site locations. There is a glass window into an
adjacent room. Unlike the far side of the lift landing which is
very dirty there is no easy route for the dust from the tube
operations to reach this area which remains relatively clean
and dust-free.
Pencil marks on a London Transport plan reproduced in
London's Disused Underground Stations indicate that a
separate exit from the bunker was constructed to Brompton
Square, to the northeast, and a user of the building confirms
that a pedestrian tunnel ran from the lift well to a rotting
wooden staircase up to ground level. The surface exit appears
to be a squat brick structure with a concrete cap and small
door next to an electricity kiosk inside the railings of
Brompton Square, facing Brompton Road. No evidence of
this exit route was found underground.
Looking east along the westbound Piccadilly Line. All
passengers see is the brick wall at the former platfonn edge.
The entrance to the former platform area is now halfway
along the left-hand wall. Photo by Nick Catford
It should be stressed that this site visit was made in 1996
and more recent visitors, who have been dropped off by
a passing train, have not been allowed in to the GORs.
All visits have now been stopped on health and safety
grounds.
62
Possible Medieval Synagogue
Information from Guildford Museum
In March 1997 members of Subterranea Britannica visited
the site of a possible medieval underground Synagogue
that had been discovered in 1995 by archaeologists from
Guildford Museum beneath a High Street shop.
The chamber was discovered during alterations to the
shop. The back part of the shop was at a higher level
than the front and the architect thought there might be
archaeological remains below the higher level and asked
the Museum to investigate. This had to be done from the
side rather than from the top in order that the shop could
remain open. A hole was opened in the rear cellar wall
and the chamber was found behind the wall. In the event,
it was not the cause of the higher level, which started
beyond the hidden chamber. The rise in levels was caused
by the slope of the hill.
Very few 12th-century houses survive and there is nothing
like this room so it is difficult to say what it was for. It
looks as if it were built so that people could sit around
the walls, perhaps for a meeting and this is why a
synagogue was suggested. Medieval Jews were wealthy
business men and could have afforded a stone house with
painted walls and its own synagogue. They also needed
stone houses as protection from theft and religious
persecution.
There is nothing to prove that it was a synagogue, but it
fits in with what is known about medieval synagogues
from documents. It was at the back of the building and
was partly underground. Synagogues were meant to be
tall, but it was better to build part of it underground so it
was tall inside but not so obvious from the outside. It
was demolished around the time that the Jews were
expelled from England in 1290 and it seems to have been
in good condition when it was demolished. The upper
walls were knocked down and thrown into the part below
ground, which was covered over and hidden until 1995.
This is odd, since the late 13th century was a time when
Guildford was expanding and people needed more space
in the fairly small town.
The north and east walls. The entrance lo the chamber from
the building it was attached to is beyond the left side of the
photo. To the right is the east wall, with the bench and the
column of the blind arcading. Photo by Nick Catford
The building is the bottom part of a small room about ten
feet square. The door is at the northwest comer. A stone
bench runs all the way round the room and there was
another doorway at the southeast comer with steps leading
up. These steps were blocked up during the life-time of
the room. The room was built in the late 12th century
and demolished in the late 13th century. The walls were
painted with red, black and indigo - a very expensive
colour in those days.
The room was built at the back of a house and was part
of the house - it was not added on later. There is nothing
left of the house but it may have had an undercroft,
because a Victorian photograph shows a low door which
looks like the entrance to an undercroft. The w hole house
may have been built of stone - not the local chalk. This
would mean that it belonged to a wealthy man.
The south wall, with the steps which probably went out to the
backyard of the property. Their medieval blocking has been
partly removed by the archaeologists. Photo by Nick Catford
There are some odd features about the chamber. The east
and west walls were deliberately built sloping uphill and
the base of the each column is of a different style. Other
blocks of stone also suggest that the stone came from
another building. The columns of the blind arcading are
U-sectioned and form part of the wall behind, which is
very unusual. Normally the columns are cylindrical and
separate front the wall, it is interesting that the only other
local examples known are in the Chapel of the Keep of
Guildford Castle, which is mid-12th century.
So, could the chamber have some link with the castle?
This is possible and does not rule out the Jewish
connection. Possibly a wealthy local bought left-over
stone from the castle. The chamber could have belonged,
for example, to the Earl of Surrey or another nobleman
from the south who wanted a house near the Royal Castle,
or it might have belonged to a Bishop or Abbot, for the
same reason and also because Guildford was a day’s ride
from London. There are no documents to confirm this
one way or the other. The chamber is the wrong shape
for a chapel.
The only object found in the building was a coin of Henry
III (1216 - 1272) which was in a crack in the stone bench.
It was of a type minted between 1272 and taken out of
circulation in 1279. There were pottery sherds in the
demolition rubble which show that the room was knocked
down in the late 13th century.
There were Jews living in Guildford before the expulsion
of 1290, though there are no records for the 12th century.
Guildford was not one of the official towns where they
were supposed to live, but they did live in other places.
One Guildford Jew was Isaac of Southwark who also
had property in London and Winchester. His house in
Guildford was broken into in 1274, by a man called
Thomas who may have owed money to Isaac. Isaac had
a wife, Thippe and a daughter Slema. Other Jews were
mentioned in the mass arrests of the 1270s: Abraham,
Floria, Josce and his wife Fonnosa. Another Jew, Bonefey,
was mentioned in 1295 as having once owned property
in Guildford.
Guildford’s Jewish population may have been too small
to regularly provide the minimum of ten males needed
for the full rituals, but a synagogue of this date would
have been a private one anyway, and could have been
used for prayer and study as well.
We may never know what the chamber was used for, but
it has provided infonnation about medieval Guildford and
stimulated research into the forgotten Jews of the town.
The chamber been stabilised and conserved and is still
accessible.
r \
Sub Brit Autumn Day Conference
Saturday 11 October 2008
Bucks University High Wycombe
Programme includes:-
Clifton Rocks Railway - Bristol
Old Chalk mines and their stabilisation
Canal Tunnels
** Military Radar in WW2 and the Cold war
** Titan Cave
Members’ Contributions
Book this date in your Diary NOW
More details and booking form will follow
** not yet confirmed
Brian Hillman: bsh@lineone.net
Day Conference Organiser
V__ )
64
The 2008 Mainland Europe Study Weekend, Paris
Friday 30 May - Monday 2 June 2008
Paul YV. Sowan
Your reporter first visited Paris as a schoolboy in 1956,
arriving with schoolmates and teachers by train at Gare
St. Lazare, the party having taken the Newhaven - Dieppe
ferry. Were we wearing caps and blazers? Quite possibly
I suppose! The Metro (especially the rolling-stock) has
changed and been extended since then. The Catacombcs
are much as 1 remember them 52 years ago. It is always
a pleasure to return to the city and, each time, to see
more underground sites. The 2008 SB Mainland Europe
Study Weekend, and the second to be based in Paris (we
were there in 2004), did not disappoint.
We travelled from St. Pancras International by Eurostar,
departing at 14.05 and reaching Gare du Nord in just
over two hours 20 minutes. After checking-in at an Ibis
hotel a few minutes walk from the station, most relaxed
at a nearby cafe-cum-bar. before and after dinner at the
hotel. We numbered 39 from the UK, Joep Orbons and
his son Jeffrey from Maastricht joining us for the weekend
to make a total of 41. Our ages ranged through seven
decades.
Saturday morning, 31 May: Archaeological Crypt/
Catacombes
We all had, helpfully, ‘go-anywhere’ tickets valid for three
days on the Metro, RER, buses, trams (there are a few
still) and Paris area SNCF trains.
The party divided. Those, by and large (and including
your reporter), already familiar with the Catacombes
formed Group A and visited the Archaeological Crypt at
the west front of Notre Dame on lie de la Cite. Group B
visited the Catacombes at 1 Place Denfert-Rochereau on
the Left Bank.
(a) Notre Dame Archaeological Crypt
This is a most impressive archaeological site, preserved
in situ , now roofed-over in the large open space fronting
Notre Dame Cathedral. The massive stones of Roman
(BC 52 onwards) and mediaeval foundations survive
sufficiently to render it easy to visualise the former
waterfront, and the ancient street layout. They include
such recognisable features as cellars, cellar-steps and
stone arches, a hypocaust, a sewer, and a well. All the
stonework is clearly related to the fonner narrow street
plan. The faint but unmistakable smell of drains down
here seemed somehow appropriate. No doubt the street
in ancient times offered an interesting blend of natural
odours.
Around the walls arc superbly executed displays of
artefacts, equally superbly provided with explanatory
texts, and a series of maps and models conveying a most
helpful introduction to the geomorphology and topography
of the city from Roman times onwards including (of
interest to Subterranea Britannica members in particular)
the distribution of open-cast and underground stone
quarries, gypsum mines, lime kilns, and the like.
It is a striking contrast to the ‘minimalist’ approach taken
at the fragment of a Roman amphitheatre, likewise
preserved in situ, in a basement at London’s Guildhall.
Of course, at home, similarly excellent displays are to be
seen in the Museum of London. However, it all seems so
much more real on the lie de la Cite where, at the very
heart of the city, one can stand beside the old stones and
get a feel for the layout and growth of the place, the
shifting course of the Seine, and the hills on the left and
right banks. There is an impressively well-stocked
bookstall.
(b) Catacombes
Wall composed of femurs and skulls in the Catacombes.
Photo by Joep Orbons
Paris, unlike London, has a good store of useful minerals
beneath its streets. Good building-stone (a Tertiary
limestone) could be quarried, often underground, close
to the centre. In contrast, stone for London had to come
from much further afield, from quarries in Kent, Surrey,
Dorset, and even France.
As Paris expanded, new houses surrounded extensive
graveyards that had formerly been outside the built up
area. Numbers of these cemeteries were cleared to make
way for building and to combat the risk of disease through
contamination of water supplies. The bones of six million
or so fonner Parisians were deposited from 1786 onwards
in some of the abandoned subterranean quarries. The
gigantic ossuary (occupying a mere one seven-hundredth
of the superficial area of the Parisian subterranean
quarries), about 20m below street level at Place Denfert-
Rochereau, has long been a tourist attraction. One
wanders about 1.7 km through galleries whose sides are
walls of thigh-bones neatly arranged endways on, with
rows of skulls by way of decoration. Behind this tidiness.
Sculpture by Decure in the Catacombes. Photo by Jocp Orbons
the smaller bones have just been thrown in, in utter
confusion. What a business the resurrection and re¬
assembly of all these bodies w ill be!
The w hole place hardly looks like a stone quarry, as the
stone has been carved and decorated to make the scene
suitably funereal. The access and exit passages are
testament to the consolidation work carried out by the
‘Inspection Generate des Carrieres’, set up in 1777 to
ensure the ancient quarries did not compromise the
stability of buildings above. Each and every consolidation
is dated in exquisite carving. At one point, you visit a
small area of untouched quarry. The route passes below
the RER Sceaux line and the Arcueil aqueduct. Near to
the exit are examples of the ‘Fontis’ (collapses) that show
why inspection and consolidation continue to the present
day.
As Martin Dixon’s tour notes point out, although the Paris
Catacombes are named after those at Rome, they are
different as they are a secondary use of a former quarry
not a primary place of interment.
By some miracle of timing, both parties found themselves,
after these visits, on the same Metro train bound for
Jourdain station and lunch at Le Mediterranean, which
restaurant we completely filled, to enjoy couscous and
stewed vegetables (and assorted pieces of meat for those
who eat that sort of thing)! Here we met Julian Pepinster,
who entertainingly explained how these dishes should be
consumed.
Saturday afternoon, 31 May: aqueducts in NE Paris
We were now in the district of Belleville, in the hills of
northeastern Paris and the 19th arrondissement, a
predominantly working-class area well off the well-
trodden tourist trail (but decidedly not well-off!). This
area was, until about 1865, ‘waste ground, patched here
and there with hovels, and pitted with gypsum quarries.’
The gypsum, of course, being a soluble evaporite deposit,
was mined, and used for making plaster-of-Paris. Here
members of the Association Sources du Nord - Etude et
Preservation (ASNEP) explained the historic water-
supply arrangements for Right-bank Paris, and showed
us inside several of the surviving ‘Regards’ (inspection
buildings in which one can ‘regard’ the water) where
springs from aquifers on two levels in the hill are tapped
and whence aqueduct tunnels convey water to the city.
Junction in 12th-century Belleville aqueduct. Association
Source du Nord - Etude et Preservation
Near the Place des Fetes Metro station we visited the
Regard de la Lanteme, an inspection and access point at
the head of the Belleville aqueduct system. The domed
circular stone ashlar building dating from 1613 is the
French equivalent of a Scheduled Ancient Monument, and
somewhat resembles a large ice-house in shape and size,
but has a double flight of stone steps leading down inside
from which the main aqueduct can be entered, although
we did not go very far, as we were due to traverse a more
commodious such tunnel later on. Three small feeders
join in this Regard, from whence a little trckled towards
the city. Until the 1970s, when the neighbourhood was
redeveloped with unappealing modem blocks of flats, this
venerable structure stood hidden from public view in
private backyards. It now stands in a small children’s
playground (Jardin de la Regard de la Lanteme.) The
present structure replaced an earlier one, the system itself
dating back to the 12th-century.
A short walk then took us to a wide manhole cover
occupying much of the width of a narrow pavement in a
nearby street of small shops. This was duly lifted,
attracting some interest from the proprietor of the shop
outside which it is situated. Most of the party then climbed
down a short vertical iron ladder into a commodious stone-
lined tunnel, the upper end of which has been blocked by
modem foundations. Persons were posted at the entrance
to guard against the precipitation of passing shoppers
into the underworld. We then walked some 400 metres
gently downhill below the backyards of the said shops,
and clambered out of another manhole further down the
hill. The floor of this tunnel was quite level, and had a
shallow central channel about 20cm wide and four cm
deep cut into the stone: it seemed to be designed to
accommodate a paltry trickle within a flagstone roofed
tunnel about a metre wide and two metres high. Our visit
almost certainly represented the largest number of people
66
to occupy the tunnel in its 900-year-old history! The exit
manhole was conveniently located outside a small bar
whose products we sampled.
Exiting the Belleville aqueduct in front of a convenient bar.
Photo by Joep Orbons
These Parisian aqueduct tunnels were interesting to
compare with others (visited at various times by
Subterranea Britannica) in Britain. Those (publicly
accessible) below some of the streets in central Exeter
seemed most similar, being of cut-and-cover construction,
but significantly narrower and with higher stone-slab
ceilings. They had been equipped with lead pipes, whereas
at Belleville it seems water simply ran in a shallow channel
cut into the stone floor. Those at Bristol, still in water,
are true rock-cut tunnels in the Carboniferous limestone.
We then visited several more small stone Regards housing
springs tapped for the city’s water supply. Of originally
40 such buildings, we were told, 19 survive: we saw the
best five.
Saturday afternoon, 31 May: la Petite Ceinture
railway and tunnel
At the lower end of the Rue de la Mare we were able to
access the disused Petite Ceinture railway, at a point where
there is open track between two of the longer (over 1 km
each) single-bore double-track tunnels. This ‘inner circle’
line was made by the Chemin de Fer de Ceinture between
1852 and 1869, paid for by the five mainline railways
and linking their several termini. It has since been
superseded by the Grande Ceinture, an ‘outer circle’ line,
dating from 1875. Much of the traffic was accounted for
by military requirements (men and equipment), diversion
and ‘special’ passenger trains, freight trains, and rolling-
stock transfers.
We walked northwards through one of the tunnels, which
is quite straight. Contrasting with the surprisingly tidy
stretch of open track, we found in the tunnel quantities of
rubbish including the remains of railway cables and
equipment, and general refuse. Apart from refuges in the
walls, no features (such as shafts) of special interest were
noted although the double track surprisingly remains in
situ throughout. At the far end we emerged in the Parc
des Buttes Chaumont.
Saturday afternoon, 31 May: Parc des Buttes
Chaumont
Disused gypsum mine with man-made waterfall in
Parc des Buttes Chaumont. Photo by Joep Orbons
On emerging from the Petite Ceinture we climbed up into
the Parc des Buttes Chaumont, created in 1866 - 67 by
landscaping an area of former gypsum mining and
opencast digging for clay and sand which had been used
as a location for slaughterhouses and rubbish tips. One
author has described it as formerly ‘the rubbish dump of
Paris’ but, now, ‘the most picturesque of the Paris parks.’
This very attractive 60-acre site (much used the afternoon
we were there by wedding parties and their attendant
photographers) features an artificial lake, and a grotto,
fonned from entrance and outer chamber of a former (but
now filled) gypsum mine. It also contains an equally
artificial, but very photogenic, semi-subterranean
waterfall. Water is taken from the Canal St. Martin (to
the west), which Subterranea Britannica visited in 2004.
We took over an entire small restaurant near the hotel for
Saturday night’s dinner, memorable for the writer for the
mountainous plateful of crudites he was served as a
vegetarian version of the starter course. So huge was
this most agreeable offering that he never did reach
whatever might have been intended as a main course!
Sunday morning, 1 June: the Paris Metro
This morning was devoted to another Julian Pepinster
‘Metro mystery tour,’ as in 2004 but visiting, with perhaps
67
one exception, new sites. Much of the Metro was made
by ‘cut-and-cover’ construction, as with London’s
Metropolitan, District, and Circle lines, and significant
parts are above ground and even on viaduct. Some lines
cross over or under the Seine.
All 14 Metro lines are interlinked by connecting curves,
so empty trains can be routed from line to line according
to operational requirements. At the terminus (and
occasionally the bypassed terminus) of several lines trains
run empty around a loop line in tunnel, stopping again at
the up platform of the same station to pick up passengers
going back into town. Where line extensions have
bypassed some of these terminal loops, the tunnel loop
has either been abandoned or used for other purposes.
And Paris, like London, has a number of disused stations,
the deserted platforms of which can be seen by passengers
in trains in service.
The Metro lines are supplemented by those (lettered A to
E) of the Reseau Express Regional (RER), which
accommodate main-line loading gauge rolling-stock (at
least some of it forming double-deck trains). These lines
have more widely spaced stations, and run further into or
beyond the city suburbs than the Metro.
Line 7 bis
We started the day’s tour at Louis Blanc on line 7, where
the station platforms are unusually underneath two
separate surface roads. We took the cross platform
interchange to line 7 bis (bis meaning ‘again’ or ‘repeat’)
This line was once a branch off the main line 7 but now
operates standalone with a cross-platform interchange
with line 7. 7 bis itself has a one-way loop at the easterly
end. The rolling stock on the line is unique, being
composed of three car sets with steerable single axles
rather than bogies. The leading axle is non-load-bearing
and transmits steering commands to the rest of the train.
The idea was to save weight but the ride is not smooth
and the maintenance costs are high so the experiment is
not being extended.
Place des Fetes
On arriving at Place des Fetes we were at one of the
deepest stations on the Metro. The longest escalators on
the system convey passengers 22.45m to street level. (Lifts
at the nearby Buttes-Chaumont station ascend 28.7m)
Parts of the line hereabouts had to be driven through an
area of old gypsum mines, which complicated
construction. We were able to go behind the scenes and
view the disused lift shaft and stairs. Because of its depth.
Place des Fetes was one of the very few Metro stations to
have ‘official’ civilian airraid shelters in the Second World
War and we were able to see the site of gas-tight doors
and ventilation equipment.
St. Martin
We next visited the disused St. Martin station which some
of us had previously seen in 2004. It opened in 1933 but,
after just 6 years, closed along with scores of others at
the outbreak of war. It is an unusual example of a disused
station on two separate lines (8 and 9). The lines are
stacked above each other leading to low-roofed platforms
on line 9 as they are directly below line 8. After the war
the station was used as a showcase to try and rekindle
advertising income and as such is home to a number of
striking advertising panels. Sadly many of these have been
obliterated by graffiti. The decision to finally close (or
more precisely, not to reopen) St Martin was taken as
late as 1967 until which time it still appeared on Metro
maps.
Under-Seine tunnels of 1910
We inspected stations at Chatelet (on the Right Bank),
Cite (on the island) and St. Michel (on the Left Bank) on
1 ine 4, the first to pass under the Seine in tunnel in 1910.
The ground was extremely waterlogged and the river
crossings, station tunnels and access shafts were all
prefabricated in steel and lowered into position before
being pumped dry. This revolutionary method of tunnel
construction paved the way for many others. Before 1910
this line was operated in two parts, north and south of
the river, which opened in 1908.
A ride on a Sprague train
Sub Brit travelling on the historic Sprague Metro set.
Photo by Joep Orbons
It was then, from St. Michel, that we followed Julian’s
verbal instructions, ‘Line 4 direction Porte de Orleans,
one stop to Odeon, changing there to line 10 direction
Boulogne-Pont de St. Cloud, then eleven stops to Michel-
Ange Auteuil, where we change to Line 9-5 stops to
Trocadero, then direction Charles de Gaulle-Etoile (at
the end of Line 6) and finally Line 2 direction Nation,
three stops (1 think!) to Monceau’. Mysteriously, but we
found out why, it was most important that we should all
be at Odeon in good time. Having hurried there, we let
the first train through, and were recommended to board
the second to last carriage on the next train. This turned
out to be a vintage ‘Sprague’ set (the sort I rode on in
1956) which is run occasionally on Summer Sundays.
Confusingly, Julian and some others got off at the next
68
stop, and hared up the platform to board the next carriage
on the same train. This turned out to be in order to travel
on the more comfy upholstered seats in the 1 st Class
carriage that was still a feature of the set. This,
astonishingly, was the only occasion this weekend when
we temporarily lost a member of the group. Malcolm
having attempted this Sprague carriage change at
Mabillon but failing to reboard. Fortunately, he was able
to find his way to the restaurant booked for lunch near
Port d’Orleans.
World War II Installation at Monceau
Gas-tight running tunnel door at Monceau Metro
Air Raid Shelter. Photo by Joep Orbons
Close to the Parc Monceau we traversed a very superior
residential district, quite a contrast with the heights of
Belleville, to descend a flight of steps to what might have
been taken for a disused public lavatory but was in fact a
suite of offices built inside one of the by-passed passing
loops mentioned above, all quite empty but with fully
operational lighting. This had been set up in the Second
World War as the protected operations centre of the Metro,
and as an air-raid shelter for its Directors. The site had
been used as a training centre postwar but even now,
completely disused, many interesting features remained.
An original sump water pump - driven by compressed
air- and ventilation equipment including filters were still
in situ and operating.
On the city side of this loop, we found a stretch of disused
tunnel (with conductor rail still in place which we were
instructed to respect just in case it was still ‘live’, an
operational possibility) fonning a home to an assortment
of prewar carriages all in need of repair or sprucing-up
and removal of graffiti. Also down here was a set of
tunnel-size air-tight doors that would have allowed a
Directors’ train to arrive and be stabled in safety. It was
explained how the doors could seal the running tunnel,
with accommodation for the rails; one of the doors being
demonstrated in action. The tunnel doors could be by¬
passed via a pedestrian tunnel which of course was itself
equipped with an airlock.
Disused ’Monceau' turning loop used as underground Metro
Operations Centre during World War Two. Photo by Joep Orbons
A ride on a double-deck RER train
Then it was back on the Metro to Etoile, and a double¬
deck RER line A train to Chatelet and RER Line B to
Port Royal and lunch. This was several members' first
ride on a double-decker, although they are quite common
in mainland Europe which has a more generous loading
gauge than our own railways - the bridges and tunnels
are higher and wider. Some of us reminisced about seeing
Britain’s only experimental double-deckers which ran for
a short while on (I think) one of the London Bridge to
Dartford lines. A great many run also around Berlin and
Sydney.
Sunday afternoon, 1 June: Maison du Fontainier
Underground Reservoir at Maison du Fontainier
dating from 1845. Photo by Martin Dixon
The Maison du Fontainier (otherwise the Grand Regard
de l’Observatoire) stands next to the city’s Left Bank
Observatory, at the south end of the Avenue de
Observatoire, behind a high wall. The premises, other
than the underground parts, are currently in use as an
The Sub Brit group on the steps of the Maison du
Fontainier. Photo by Martin Dixon
establishment for disabled children. This was a focal point
for aqueducts tapping springs for water supply to the
Left Bank. What we saw was a substantial, elegant stone
building of two storeys erected above a basement in which
and beside which in the adjoining land are aqueduct
tunnels, stone tanks, and reserv oirs. Effectively this was
the ‘distribution end’ of a water supply very similar to
the one we had seen at Belleville on the opposite bank.
Our local guide from Paris Historique here explained that
the upper floors of the building were erected as a house
for the superintendent of the water supply. The building
and the aqueduct on which it stands date from 1613 —
1623. The aqueduct approximately follows the line of an
older Roman one. In the basement we were able to see
how water entered from an aqueduct tunnel, such as those
seen the day before, and entered one of three stone storage
tanks, ‘one for the King’s palaces, one for the City, and
one for Jean Gobelin, the contractor.’
Unlike the Regard de la Lanteme, the basement proved
to be a spacious and well-lit structure of fine ashlar
masonry. Off to one side, under adjoining land, we were
able to inspect the interior of a large, but empty, covered
reservoir now out of use. This larger reservoir dates from
1845 when the storage capacity was increased to capture
overnight flows. Members made their own way, at leisure,
back to the hotel.
Dinner was at a restaurant next-door to the Gare de 1 ’ Est
called Exterieur Quai, - “Outside Platform”. Julian had
brought with him (in a real Citroen 2cv) a box full of
books on the Metro and underground Paris, and did good
business on behalf of ADEMAS, his Metro Society. Such
a pleasant evening was this that our leader left with the
rest of us without remembering to pay the restaurateur’s
bill! A call to Martin’s mobile telephone past midnight,
as he was part-way across the concourse of the Gare de
1’Est, conveyed a message to the effect that the owner of
the establishment hoped we had all enjoyed our meal,
and would like to point out that it is traditional in Paris to
pay for dinner! Perhaps he saw our forgetfulness as a
compliment in the enjoyability of the evening he had
hosted.
Sunday night at the hotel was enlivened by a (false) fire
alarm at 2.30 a.m. Some heard it, recognised it for what
it was, and duly negotiated the fire escapes and assembled,
more or less clad, on the street outside. Some heard but
ignored the alarm. Some just slept through it. Curiously,
perhaps worryingly, the hotel staff made no attempt at a
roll-call. Neither then, nor the following morning, was
any explanation or apology offered. We all got back to
bed some time after three a.m.
Monday morning, 2 June
The plan this morning had been to visit the bunker below
the Gare de l’Est, the mainline terminus serving trains
for Strasbourg, the Rhine valley, Switzerland and beyond.
This was constructed as a secure traffic control centre in
the years leading up to World War II by the French. It
was taken over by the Germans who added their own
signage which in turn was patriotically painted out on
the liberation of Paris! The bunker remained secret until
the 1990s and is in an excellent state of preservation.
Sadly, this visit was not to be, as a result of building
work at the station. An unexpected free morning in Paris
is never unwelcome, and the group split up for separate
activities. The largest contingent followed ‘Official Plan
B’ and visited the Perc Lachaise Cemetery. This immense
site (109 acres) opened in 1804 and is the final resting
place of hundreds of famous people, including Oscar
Wilde, Edith Piaf, Jim Morrison and Marcel Proust. There
is a large underground 3 level ossuary built in 1950 but
this is ‘off-limits’ for visitors.
The party reconvened at the very modern Gare
Montparnasse SNCF tenninus in time to catch the 12.02
double-deck train to Sevres, some 10 km south-west of
the capital.
Monday afternoon, 2 June: Sevres quarries / wine
stores / brewery
The little town of Sevres is best-known for its porcelain,
and second-best-known as the location of the International
Standard kilogram and metre. We saw nothing of those
claims to fame, but disappeared (led by a member of the
local archaeological and historical society) through an
inconspicuous door in a very ordinary block of flats. What
we found behind the door became more and more
impressive as the tour progressed.
The flats had been built (on the site of a former brewery)
up-against and over a crumbly limestone cliff face. So
our first impression was of something like the space below
the Broadmarsh Centre in Nottingham, where there is a
series of rock-cut ‘caves’ used over the centuries as cellars
and tanneries. Inside the cliff at Sevres, however, there
are very much more extensive former building-stone
quarry tunnels which were adapted as the King’s wine
cellar (for Versailles) in the 18th-century. From 1852,
70
Bottles at abandoned Sevres underground Brewery surrounded
by their disintegrated cases. Photo by Martin Dixon
the site was operated by Meuse as a brewery and for beer
storage, which use continued until 1990.
Here again, as in the Catacombes, the original
underground quarrying landscape is largely hidden as a
result of the secondary uses of the site. There is much
inserted masonry, some in stone and some in brick,
numerous stacks of empty bottles and the rotting remains
of timber casks, and some truly enormous beer storage
tanks. We were shown the marks on walls and floors
where some immense wooden casks had stood, perhaps
not as huge as those famous ones still to be seen under
the castle at Heidelberg, but capable of holding sufficient
drink for a party and a half to be sure.
And so to London
We took the 17.10 Eurostar back from Gare du Nord,
stopping (a novelty) at Ebbsfleet (on the Dartford
Marshes) on the way back, and arriving in two hours 24
minutes at St. Pancras, where your correspondent retired
to the sometime Shire Bar (now the John Betjeman) for
his first pint of real beer for three days!
Our thanks are due and tendered, especially, to our
Parisian colleagues for showing us and explaining the
sites, to Linda Bartlett and Martin Dixon for their as-
ever meticulous planning, and to Richard Bonella and
Stewart Wild for assistance with translation. We had
enjoyed good company, interesting sites, excellent meals,
fine weather, enthusiastic guides, and further samples of
John Burgess’ and Martin Dixon's apparently
inexhaustible stock of jokes.
References
Paris is far better served than London in the way of books
concerning matters subterranean. The following is a selection
from the writer’s collection.
ANON, 1997, Paris secret. Paris: Editions Nouveaux-
Loisirs / Paris-Musees: 264pp [ISBN 2-7424-0338-8]
BAEDEKER, Karl, 1891 , Paris and environs .. Handbook
for travellers. Id'' edition. Leipzig: Karl Baedeker: xl +
390pp.
BARROIS, Maurice, 1964, Le Paris sous Paris. Paris:
Hachette: 96pp.
BRODERICK, Alan Houghton. 1950, The people 's
France: Pans. London: Hodder & Stoughton: xxii +
478pp.
CERF, Delphine. 1994, Les catacombes de Paris.
Meudon: Editions Moulenq: 96pp [ISBN 2-910711-00-5]
CLEMENT, Alain, and Gilles THOMAS, 2001, Atlas du
Paris souterrain: la doublure sombre de la ville lumiere ,
Paris: Editions Parigrammc: 200pp [ISBN 2-84096-191-1]
De MONTCLOS, Brigitte, and Jcan-Pierre WILLESME,
1994, Catacombs general guide. Paris: Musees de la Ville
de Paris: 32pp [ISBN 2-87900-166-8]
FLEURY, Michel, and Vcnceslas KRUTA, 2001, The
Archaeological Crypt of the Courtyard of Notre-Dame.
Paris: Editions Faton: 40pp [ISBN 2-87844-051-X]
GAFFARD, Emmanuel, 2007, Paris souterrain: carrieres,
catacombes, cryptes, egouts, tunnels .. / Beneath Paris:
quarries, catacombs, crypts, sewers, tunnels .. Paris:
Parigramme: 176pp [ISBN 978-2-84096-482-7]
GERARDS, Entile, 1991, Paris souterrain. Torcy: Editions
DMI: (4) + ii + 667pp + plates [Reprint of the 1908
edition] [ISBN 2-84022-002-4]
HARDY, Brian, 1999, Paris Metro handbook. 3 rd edn.
Harrow Weald: Capital Transport Publishing: 128pp
[ISBN 1-85414-212-7]
HAYTON, Susan J., 1998, Paris: a preliminary industrial
archaeology site guide. Orpington: author: 58pp
[ISBN 0-9533348-0-5]
HOPKINS. Tighe, 1902, The dungeons of old Paris: being
the story and romance of the most celebrated prisons of
the monarchy and the revolution. Leipzig: Bernhard
Tauchnitz: 271pp.
LE ROY, Jean-Yves, 2000, Inscriptions religieuses et
profanes des photographies Catacombes. Paris: Les
Musees de la Ville de Paris: 32pp [ISBN 2-87900-465-9]
MU1RHEAD, L. Russell, 1960, Paris [Blue Guide]
London: Ernest Benn Ltd: xlii + 262pp.
PRIGMORE, B.J., 1970. On rails under Paris. Light
Railway Transport League: 72pp
PRYCE-JONES, David, 1981, Paris in the Tlurd Reich: a
history of the German occupation, 1940 1944. London:
William Collins & Co. Ltd: x + 294pp.
SALETTA, Patrick, 1990, A la decouverte des souterrains
de Paris. Antony: SIDES: 335pp [ISBN 2-868610-75-7]
SUTTEL, Rene, 1986, Catacombes et carrieres de Paris:
promenade sous la Capitate. Paris: Editions Societe
d'Etudes Historiques et Anciennes Carrieres et Cavites
Souterraines: 224pp [ISBN 2-9501258-0-8]
TRICOIRE, Jean, 1999, Le Metro de Paris 1H99 1911:
images de la construction. Paris: RATP / Paris Musees:
216pp [ISBN 2-87900-481-0]
WILLESME, Jean-Pierre, 1986. Les Catacombes. Ouest
France: 32pp [ISBN 2-85882-906-3] [English summary in
pages 21 - 23]
71
Dartford Tunnel Transport
Keith Ward
As drivers join the endless queues trying to cross the Thames on
the eastern side of London via the tunnel or the bridge they are
usually not thinking about anything other than their frustrating
routine experience.
So, let’s look at some interesting aspects of the tunnel and the
types of transport that have used it since it was opened to traffic
in 1963.
The pilot tunnel was completed just prior to World War Two;
unfortunately no photos seem to be available. It was a very small
bore; however the GPO made good use of it to carry telephone
cables. These formed part of an outer ring which was created to
be able to divert phone traffic around London if any Exchanges
were bombed or put out of action for any reason. The eastern
section ran from Margaretting exchange on the A12 Cable to
Keyed on the A2 Cable (the numbers are the roads which the
cables followed); in the other direction the cable followed the
A25 road - thus the ring was a sort of early cable M25! As far as
1 am aware, the cables remain in use through the old tunnel.
A recently released file from the National Archives gives details
of the pilot tunnel for the first time. In 1951 it was accessed by
shafts fitted with electric lifts that held six people. Surface access
to these shafts was by an unmetalled road. It was originally
planned to provide access to the tunnel using 1 in 28 slope
passages but these were never built. The tunnel itself was 12 feet
in diameter and lined with cast iron rings. There was no roadway,
instead passage through was on wooden staging as the invert
had between two and three feet of water in it.
Public transport through the Dartford tunnel has always been
surprisingly poor, when introduced it is always poorly patronised
and doesn’t seem to last long. To encourage cyclists, two Thames
trader buses were built for the tunnel opening. These were of
unique design, having cycle racks on the lower deck and seats
upstairs; they were loaded at special loading platforms.
Unfortunately the cyclists never came and the service lastedjust
a couple of years.
The only public river crossing is the Gravesend-Tilbury ferry
which still runs every 30-60mins; however in the 1960s it was
more frequent - every 15-20mins. As a consequence, one would
have thought a bus alternative would be popular, but no! The
first bus was the LT 370, which ran from Grays to Dartford
about every 2 hours and this was soon gone! This was followed
by Eastern National who extended the journeys on its number 2
route from Grays to Southend through the tunnels at similar
paltry frequencies. This too disappeared due to lack of passengers.
Bus number 402 from Southend to Dartford appeared in the
early 1980s with four a day, but that also didn’t last long, even
after some journeys were extended to Victoria via south-east
London. What looked like salvation were the massive shopping
centres at Lakeside and Bluewater. The openings saw a spate of
commercial routes springing up, such as the Romford to Lakeside
and Bluewater bus number 348 every 30mins. In the end, many
of these were cut back and apart from some Saturday shoppers’
routes, only an hourly Ensign bus number X80 now runs from
Gravesend to Lakeside through the tunnel.
An interesting joint coach group was set up in 1962, called
Dartford T unnel Coachways. They established a series of express
coach routes linking south coast resorts with East Anglia and the
Midlands. It was jointly itm by four national bus companies -
East Kent, Maidstone District, Southdown and Eastern; and
used vehicles from those companies. The joint venture survived
and was incorporated into National coaches in 1970; National
Express still operate some services through the tunnel today
Lastly we mustn’t forget the two unique vehicles built in 1962 to
clear broken-down vehicles from the tunnel. They were built
onto the familiar Scammel mechanical horse (much used by
British Railways) and survived until they were replaced by more
conventional breakdown tmeks in the 1970s. Now the breakdown
service is put out to tender, although the tunnel authority
themselves do have some Range Rover 4x4 vehicles with
emergency equipment. Fire cover and heavy rescue is carried
out by Kent fire service from its Thameside station and by Essex
fire service from its impressive new Thurrock station built a
couple of years ago to replace Grays and Tilbury stations.
Addendum
Following a number of disastrous fires in mainland European
road tunnels, an appraisal of British road tunnels’ safety
arrangements (or lack of them) has led to consideration being
given to the installation of a fire sprinkler system in the Dartford
(Kent) - Thurrock (Essex) tunnels.
One relevant factor in the Dartford tunnels’ case is that the two
bores are linked by only a single cross-passage. This narrow,
sloping tunnel section was made to assist in tunnelling, and is
unsuitable for emergency access in the event of a vehicle and its
load catching fire in a running tunnel.
SOURCE: Ed OWEN, 2008, Dartford tunnel to retrofit fire
sprinklers. New Civil Engineer, 17 January 2008, page 6.